Description:

Disturbed areas must be seeded between May 1 Sept 15. Areas which cannot be ... Disturbed areas had been mulched and silt fence corrected. ... – PowerPoint PPT presentation

Number of Views:103
Avg rating:3.0/5.0
Slides: 21
Provided by: Jen27
Category:

less

Transcript and Presenter's Notes

Title: Enforcement Case EC 0547


1
Enforcement Case EC 05-47
  • Respondent Mark Gilbert
  • Location Rockwood Strip Twp T1 R1 NBKP,
  • Somerset County

2
Location MapRockwood Strip Twp. T1 R1
NBKPSomerset County
3
Location Map
4
Zoning Map and Property Information
Taxation Lots 23, 24, and 25 on Plan 08 and
Lots 43 and 44 on Plan 06 5.07 acres with
approx 500 feet of frontage on the Moose
River (D-RS) Residential Development
Subdistrict
5
Background
  • Pre-1971 A portion of the property was
    developed with a commercial marina including two
    boat storage buildings and a repair shop.
  • 1985-1995 Development Permit DP 3962 and
    Amendment A issued to the previous owner for
    reconstruction of one storage building and minor
    repair activities.

6
Background, Cont.
  • 1996-1998 Property purchased by the respondent,
    along with two abutting parcels one developed
    with a single-family residence and one
    undeveloped. Amendment B to DP 3692 issued,
    authorizing reconstruction of the three existing
    marina buildings, improvements to the boat ramp,
    and construction of a new storage building.

7
Background, Cont.
  • 2000 Amendment C to DP 3692 issued, authorizing
    an expansion of marina capacity. Amendment C
    also authorized construction of an 8 ft. by 200
    ft. elevated wooden walkway on posts to provide
    access to the new boat slips.
  • 2003 Amendment D to DP 3692 authorized a time
    extension to complete reconstruction of two of
    the storage buildings (previously authorized in
    Amendment B).

8
Description of Activities and Violations
  • Activity
  • Construction of new boat storage building
    completed in 2000 left an approximately 40 ft. by
    150 ft area of unstable soils in the vicinity.
    Final stabilization was not completed until
    October of 2005.
  • Violation
  • Condition 3 of DP 3692Standards for Filling and
    Grading and Guidelines for Soil Stabilization.
  • All graded areas shall be promptly stabilized to
    prevent erosion and sedimentation.
  • Disturbed areas must be seeded between May 1
    Sept 15. Areas which cannot be seeded during
    that time period should be mulched to keep them
    stable until final stabilization possible.

9
Site Diagram
Area of Disturbed Soil (50 by 150)
Boat Storage
Office/ Repair
Graded Area for Footpath (8 by 100). Set back
5 from River
150
Residence
MOOSE RIVER
10
Photos
Photos taken November 2004 Area behind
storage building
11
Photos
Photo taken August 2005. Problem had been
discussed with respondent twice since last photo
was taken
12
Photos
Photo taken on October 19, 2005 Soils have
been sloped, seeded, and mulched
13
Description of Activities and Violations, cont.
  • Activity
  • Cleared and graded an 8 foot by 100 foot area set
    back 5 feet from the river with the intention of
    creating a footpath, instead of the elevated
    wooden walkway on posts that was originally
    approved.
  • Violation
  • Condition 1 of DP 3692Permit is dependent upon
    and limited to the proposal as set forth in the
    application and supporting documents, except as
    modified by the Commission in granting this
    permitAny variation from the application or the
    conditions of approval undertaken without
    approval of the Commission constitutes a
    violation of LURC law.

14
Photos
Photo from September 1999 showing the pathway
prior to grading activities
15
Photos
Photo taken June 22, 2005
16
Photos
Photo taken June 22, 2005 Silt fence not
installed properly
17
Photos
Photo taken June 28, 2005 Disturbed areas had
been mulched and silt fence corrected. Area is
fully vegetated with grass today.
18
Description of Activities and Violations, cont.
  • Violation
  • Both activities are also violations of 12
    M.R.S.A. Section 685-B,5
  • Commission authorization pursuant to this section
    shall permit only the arrangement and
    construction set forth in the approval as issued,
    change in use, arrangement or construction shall
    be considered a violation of this chapter and
    punishable as provided in this chapter.

19
Terms of Settlement
  • Pay 2,200 civil penalty
  • Plant 13 trees and 13 shrubs of native species
    within the footpath area. Respondent will be
    allowed to maintain a 3-foot wide trail through
    the tree plantings to allow access to the boat
    slips. Plantings must be maintained for at least
    5 years to re-establish the root mat before any
    application will be approved for an elevated
    walkway.
  • Record the Settlement Agreement in the Registry
    of Deeds in case of sale, lease, or transfer of
    the property.

20
Staff Recommendation
  • Staff believe that this agreement is in keeping
    with your Compliance and Enforcement Response
    Policy and recommend ratification of the
    agreement.