Presentation on Changjiji Housing Complex

Description:

Ministry of Works and Human Settlement. Changjiji Housing Complex ... Settlement of plinth. Underground water seepage. Plumbing-Poor Workmanship. Roof leakage. ... – PowerPoint PPT presentation

Number of Views:518
Avg rating:5.0/5.0
Slides: 18
Provided by: karmawa
Category:

less

Transcript and Presenter's Notes

Title: Presentation on Changjiji Housing Complex


1
Presentationon Changjiji Housing Complex
  • National Housing Development Corporation
  • (NHDC)
  • Ministry of Works and Human Settlement

2
Changjiji Housing Complex
3
Vital Statistics (Bidgs Units
  • Total Area-53 acres
  • Site coverage-40
  • Phase I (10)
  • Rinchen Const (3)
  • M/s T K Const (3)
  • Rinson Const (4)
  • Phase II (44)
  • BEC (9)
  • Druk Chhoglay Const (9)
  • Singye Const (8)
  • Rinson Const (8)
  • Chapcha Engg (10)
  • Phase III (17)
  • Druk Chhoglay Const (6)
  • Chapcha Engg (6)
  • Rinson Const (5)
  • 71 buildings
  • 676 units-Resi.
  • 48 shops
  • Phase I (10 bldgs-120 units)
  • Feb 2001-Sept 2002
  • Phase II (44 bldgs-468)
  • Sept 2001-Sept 2004
  • Phase III (17 bldgs-88 units,48 shops)
  • Oct 2004-2006

4
Vital Statistics ..cont.
  • Total number of residents -2989 .
  • Total number of Children -1276 .
  • Total number of Family with parent(s) -85
  • Total number of others 1 -482
  • Total number of Single Divorced -59
  • Number of residents per unit
  • 12---    50
  • 34---     158
  • 56---     267
  • 78---     93
  • 9    --- 16
  • Examined number of Tenants 586
  • Age of the Tenants
  • Unknown age  --- 79
  • 2125 Year-old  ---17
  • 2630  year old--- 146
  • 3135   year old--- 154
  • 3640   year old--- 114
  • 4145   year old---   36
  • 4650     year old--- 27
  • 50     year old--- 13
  • Examined number of Tenants 586

5
Project Background
  • Rapid increase in the urban population.
  • Urgent Housing need for the Lower Income Civil
    Servants.
  • Lack of affordable housing for the lower income
    group (LIG).
  • Studies in 1999 indicated requirement of 3892
    units in Thimphu for the five year period
    2000-2005.
  • CCM discussion and approval in 1998-1999.
  • Project Implementation by then DUDH.
  • Design and Land Acquisition-1999-2000.
  • First Phase started -2001.
  • Project Implementation transferred to NHDC-2004

6
Objectives of the Govt.
  • Alleviate acute housing shortage.
  • Provide affordable shelter.
  • Encourage use of local materials and promote
    local industries.
  • Establish viable community with own town centre,
    bus terminal, school, playgrounds, sports field,
    Satellite Clinic etc.

7
Housing Typology
  • Three type designs
  • Two fully residential
  • One commercial on ground floor-variety
  • Total 71 buildings

Type 2-9 Units/block
Type 3-4 commercial Units/b 4
Residential Units/b
Type 1-12 Units/block
8
Ongoing Works
  • Parking Development.
  • Footpath construction.
  • Drainage.
  • Installation of Water Meter
  • Installation of Additional Water Pump.

9
To Be Developed
  • Guard House for Water Tank.
  • City Bus Terminal.
  • RBP-Out Post.
  • Satellite Clinic.
  • Childrens Park.
  • Pay Use Toilet.
  • Youth Information Centre.
  • Commercial Square.
  • Landscape.
  • Lhakhang.

10
Problems .
  • Settlement of plinth.
  • Underground water seepage.
  • Plumbing-Poor Workmanship.
  • Roof leakage.
  • Leakage from toilet/duct.
  • Water supply .
  • Peeling off plastering.
  • No site development.
  • Unskilled labours.
  • Use of Local materials.
  • Users Habits.
  • Inadequate/Inexperienced Site Engineers.
  • Labour Contracts.

11
Problems .. cont.
  • Settlement of plinth.
  • Underground water seepage.
  • Plumbing-Poor Workmanship.
  • Roof leakage.
  • Leakage from toilet/duct.
  • Water supply .
  • Peeling off plastering.
  • No site development.
  • Unskilled labours.
  • Use of Local materials.
  • Users Habits.
  • Inadequate/Inexperienced Site Engineers.
  • Labour Contracts.
  • Allotment
  • Cost.

12
Lesson Learnt
  • Building design to consider natural terrain.
  • More time for planning.
  • Specialize our contractors.
  • Testing and certification of skilled people.
  • Promote competition in local industries.
  • Common areas to be strengthened.
  • Sequence of Construction.
  • Coordination among the relevant agencies.
  • Specialization-services like water supply other
    waste.
  • 3rd Phase-Aluminum shutters.
  • Additional pumps for water supply.
  • Store is must-designers please.
  • Wall cracks-Hairline cracks in the walls,
    junctions, (Advances in Building Materials
    Construction, Published by CBRI, Roorkee, India
    1986 Page No. 245-279)
  • Vandalism-manhole cover, pipes, resistance to
    electrical wire even.

13
Store is Must-Designers Please ?
14
LESSONS LEARNED MAY BE IMPLEMENTED BUT END USERS
ARE ALWAYS____???

15
Changjiji- Better Examples.



Surrounding not maintained clean



Settlements/cracks
16
??? ??? Prepared for Happiness
OUR CHANGJIJI TASHI DELEK
Achievement -despite of all odds and critism
faced NHDC is able to solve the acute Housing
shortage for 676 family.
17