FT BELKNAP BROWNFIELDS TRIBAL RESPONSE PROGRAM Part 2 - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

FT BELKNAP BROWNFIELDS TRIBAL RESPONSE PROGRAM Part 2

Description:

In 1995, EPA begin to address these sites through Brownfields Demo Pilot Projects. ... 1930's to remove rock for rip-rap during the construction of the Fort Peck Dam ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 7
Provided by: sherry57
Category:

less

Transcript and Presenter's Notes

Title: FT BELKNAP BROWNFIELDS TRIBAL RESPONSE PROGRAM Part 2


1
FT BELKNAP BROWNFIELDS TRIBAL RESPONSE
PROGRAMPart 2
Presentation By Sherry Bishop, Brownfields
Coordinator RR 1 Box 66 Harlem, MT 59526 406
353-8465 Phone 406 353-4358 Fax bishopsherry_at_yahoo
.com
2
EPA AND BROWNFIELDS
  • In 1995, EPA begin to address these sites through
    Brownfields Demo Pilot Projects.
  • Begin by providing small amounts of seed money to
    local governments/entities that launched hundreds
    of two-year brownfields "pilot" projects.

3
BROWNFIELDS ASSESSMENT DEMONSTRATION PILOT
PROJECTS
  • EPA provided funding through the brownfields
    assessment grants. (demo projects)
  • FBIC received a 2-year grant to address
    brownfields sites

4
FORT BELKNAP BROWNFIELDS PROGRAM
  • FBIC prioritized sites to be assessed through an
    environmental site assessment (ESA).
  • ESA consisted of phase I, II and III
  • FBIC contracted an Environmental Firm to conduct
    an ESA.

5
Brownfields Assessment Sites
  • Old Agency Landfill Snake Butte Rock Quarry

6
SNAKE BUTTE ROCK QUARRY/RAILROAD GRADE
  • Army Corp of Engineers operated a rock quarry
    operation in the 1930s to remove rock for
    rip-rap during the construction of the Fort Peck
    Dam