Context Sensitive Solutions In Practice - PowerPoint PPT Presentation

1 / 44
About This Presentation
Title:

Context Sensitive Solutions In Practice

Description:

Context Sensitive Solutions In Practice – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 45
Provided by: garys72
Category:

less

Transcript and Presenter's Notes

Title: Context Sensitive Solutions In Practice


1
(No Transcript)
2
Context Sensitive SolutionsIn Practice
  • Context Sensitive Solutions Workshop
  • Houston-Galveston Area Council
  • September 20, 2007
  • Gary W. Schatz, P.E., PTOE

3
Traffic Engineering Basics
  • Mobility - movement of people and goods within
    the transportation system
  • Traffic Includes all roadway users
    pedestrians, bicyclists, motorists, transit riders

4
Traffic Engineering Basics
  • Corridor Capacity - Determined by efficacy of
    intersections
  • Roadway Up to 1,900 vehicles/hour/lane
  • Intersections
  • All-Way Stop Up to 400 vehicles/hour/lane
  • Traffic Signal Up to 600 vehicles/hour/lane
  • Roundabout Up to 1,200 vehicles/hour/lane

5
Midtown Houston, TX
6
Downtown Houston, TX
7
Downtown Houston, TX
8
Bissonnet at MFA-Houston Houston, TX
9
Bagby _at_ Hawthorne/Smith Houston, TX
10
Washington _at_ Westcott Houston, TX
From Google Earth
11
Arrington Road College Station, TX
12
Monarch Oaks Houston, TX
Roundabouts
13
Monarch Oaks Houston, TX
Splitter Islands
14
Monarch Oaks Houston, TX
Chicanes
15
Monarch Oaks Houston, TX
Mini Roundabout
16
Addicks Community Houston, TX
17
Addicks Howell _at_ Memorial Houston, TX
Documented Crashes 3/24/05 to 3/17/06(Source
HPD)
18
Addicks Howell _at_ Memorial Houston, TX
Documented Crashes 3/24/05 to 3/17/06(Source
HPD)
19
Addicks Howell near Wolfe E.S. Houston, TX
20
Addicks Howell near Wolfe E.S. Houston, TX
21
Grisby thru Old Town Addicks Houston, TX
22
Grisby thru Old Town Addicks Houston, TX
Addicks Howell
SH 6
23
E. Madison Street Seattle, WA
24
Overmeyer west of Seamist Houston, TX
25
Grisby thru WestLake Campus Houston, TX
26
Grisby thru WestLake Campus Houston, TX
27
Grisby thru WestLake Campus Houston, TX
IH 10 SSR
IST Link Road
Grisby
Westlake Park
BP Way
SH 6
Keating
Addicks Howell
Gracie Lane
Memorial
28
Grisby thru WestLake Campus Houston, TX
29
Grisby thru WestLake Campus Houston, TX
30
Memorial _at_ Westlake Park Houston, TX
31
Regent Square Houston, TX
Eleanor Tinsley Park
W. Dallas
River Oaks
Downtown
Dunlavy
Montrose
Midtown
32
Regent Square Houston, TX
  • New Urbanist concept
  • Walkable, livable streets
  • Context-sensitive
  • Sustainable, mixed-use development
  • Apartments
  • Condominiums
  • Hotel
  • Offices
  • Specialty Retail
  • Restaurants
  • Market
  • Completion 2014

33
Regent Square Houston, TX
34
Winter Street Corridor Houston, TX
35
Winter Street Corridor Houston, TX
Aerial from Google Earth
Holly
Silver
Goliad
Sabine
Sawyer
Hickory
Johnson
Colorado
Henderson
Houston Ave.
36
Winter Street Corridor Houston, TX
37
Winter Street Corridor Houston, TX
38
The Toolbox for CSS
39
The Toolbox for CSS
40
The Toolbox for CSS
41
Additional Information
  • www.ContextSensitiveSolutions.org
  • Institute of Transportation Engineers
  • www.ite.org
  • Pedestrian and Bicycle Information Center
  • www.bicyclinginfo.org
  • www.walkinginfo.org

42
College Street Asheville, NC
  • Constructed in 2005
  • Average Daily Traffic (ADT) 13,000 vehicles
  • City of Houston Traffic Count Program (2000 Data)
  • Two way street segments 1,400
  • Segments with lt 13,000 ADT 600

43
Context Sensitive SolutionsIn Practice
  • Context Sensitive Solutions Workshop
  • Houston-Galveston Area Council
  • September 20, 2007
  • Gary W. Schatz, P.E., PTOE

44
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com