Title: WBS 5 Forward Pixels
1WBS 5 - Forward Pixels
WBS 5 - Forward Pixels
Bruno Gobbi
DOE/NSF Review
May 8, 2001
2Outline
- Status of the US CMS Pixel project
- System overview
- Accomplishments of last years goals
- Status and technical progress
- Scope change and contingency use since
- last review
- Committee concerns and issues
- Plans for the next six months
- Summary and conclusions
3Status of the Forward Pixel
The FPix project is nearing the completion of a 3
year RD phase. All the major components have
now been defined, allowing for a more realistic
estimate of cost and schedule. The project is
now shifting into prototyping of components,
carrying out system tests, and studying how to
assemble the detector. The installation date
has been delayed by one year (to April 06),
permitting us to start the final assembly in 04
rather than 03.
4FPIX System Overview
FPix System Overview
FPix
CMS Pixel Detector
- US delivers 4 disks (stand alone system)
European Group
Barrel
?
- No changes in scope since last year
FPix Disks
IR
Responsibility of US CMS
FPix Full Size Model of 1/2-Disk
2.4m
Service Cylinder
Space Cylinder
Power, Cooling, Optical Fibers
Disks Mechanics
5FPIX Scope and Deliverables
FPix Scope and Deliverables
Comm. Network Hub
FEC VME Board
Token Bit Manager
Blade
Butterfly
HDI
Sensors
ROC
NEW
VHDI
Plaquette
Si Plate
6Last YearPlans and Accomplishments
Last Year Goals and Accomplishments
- Beam test Carried out.
-
- Prototype TBM/CNH, HDI, and FEC TBM/CNH, and FEC
being tested (FPGA), HDI is now two components a
Very-HDI (first prototype) and the HDI - Submission of second prototype sensors In
progress - Submission of Multiple Chips Placement Parts
just returned. Good results. - Procure first 1/2-Disk made of Be Delayed by
lack of engineers. Effort is resuming now.
7FPix Technical Progress in FY01
- Preparing for a new Sensor Submission
- Bump Bonding submission for multiple chips being
evaluated - First Prototypes of the TBM and FEC
- First prototype of VHDI
- Started tooling for assembly of detectors
- Results from Test Beam at CERN
8FPIX Sensors - First Submission
FPix. Sensors, 1st Subm.
Guard Ring Design hold 1000V. Very good!
p-Stop double open ring. OK but no safety margin
Before irradiation 90 of pixels have Vbrkdwn
gt300V
After ? 1x1014 p/cm2 increase in current after
300V (2-8) noisy channels (PSI) With ? 6x1014
p/cm2 same I with pixels at -100C
9FPIX Sensor - Second Submission
FPix. Sensor 2nd Submission
- Conclusions (first submission)
- Baseline design is adequate for CMS!
- - Would like to understand and correct the
- increase in current for irradiated sensors
- - the cause of ?10 noisy channels (test PSI)
- Second submission
-
- Is in preparation. Goals
- - finalize the two-double ring p-stop design
- - produce sensors to test the FPix readout
10FPIX - Bump Bonding
FPix, Bump Bonding
- Bump bonding with industry
- submission with MCNC for bump bonding (Blank
Chips) for - all the sensors required for 3 Blades 135 ROC,
21 sensors of - 5 different sizes, SnPb
- yield per bump 0.9998 ? 0.0001
- at UCD (In) for RD detectors and read-out
electronics
D/cms/Lehman/Lehman 2001/Presentations/Plenary
Presentations\Bump-Bonding..ppt
11FPIX - Test Beam at CERN
FPix. Test Beam at CERN
Charge Sharing
Vienna Repeater
Y
Row
X
Z, B
Double Column
Beam
20o
ROC, PSI36 11 double columns x 30 rows
Pixels 150 x150 ?m2
8mm
D\LHM\2001\Presentations\Plenary
Presentations\For Dan \Geometry Pixels.ppt
12CERN Test Results
FPix. CERNs Test Results
Charge sharing vs position
Pixels at 20o to beam
? 14 ?m over pixel
150 ?m
150 ?m
Charge sharing vs position
150 ?m / ?12 43 ?m
? 46 ?m over pixel
Pixels normal to beam
D\LHM\2001\Presentations\Plenary
Presentations\For Dan \Cern Test Result.ppt
13FPIX Readout Electronics
FPix, Readout Electronics
FPGA Token Bit Manger, TBM and Control Network
Hub
FED
Detetor
Front End Controller, FEC Single Channel Prototype
14Very High Density Interconnect
Very Hight Densityes. Interc.
VHDI for Row of 5 ROCs
Test Station
15FPIX - RD Assembly - SiDet
FPix, RD Assembly. SiDet
Assembly of Detectors NIKON measurement station.
Need 672 units
Assembly of Butterflies OMIS II
measurement station. Need 96 units
16FPIX RD - Survey
FPix, RD Survey
Survey Blades Zeiss 500 measurement
station. Need 8 units (1/2-Disk)
Components
17US CMS FPIXBCWS, BCWP ACWP
W. Scheduled
W. Performed
ACW. Performed
18FPIX - BCWS Profile
W. Scheduled vs. Year
19US CMS FPIXSch. Cost Performance
Scheduled Performance
Cost Performance
20US CMS FPIX ( Comp., Cont. Use)
W. Completed
Cont. Use
21FPIX - ETC
Mfg
EDIA
MS
22SOW 01 - FPIX
Rutgers
Fnal
Purdue
23US CMS FPIXL2 L3 Milestone Performance
24FPix Critical Path
Panels
Disks
Space Cylinders
VHDI HDI
Sensors
Readout Chip
Bump Bonding
Assembly Plaquettes
Assembly Butterflies
Assembly 1/2-Disks
Install Disks in 1/2-Cyl.
Shipment to LHC
Commissioning completed
25Critical Path Analysis
Critical Path Analysis
- The read-out chip development sets the critical
path. responsibility of PSI - Development of the TBM, VHDI and HDI depends on
the design of the ROC. - Bump Bonding is the next most critical task.
26Last Review Concerns
- Concerns from last time have been addressed
- Increase engineering support for HDI, (VHDI).
Done - Update the near term plan with specific
milestones. Done - Devote manpower immediately to the evaluation /of
a new preproduction of sensors. Done - Increase manpower on bump-bonding task.
- Request was made to the funding agencies but
it - has not been awarded yet.
27Issues
Issues
- Additional manpower for bump bonding
remains a pressing issue.
- Mechanical engineering must be made
available (from US CMS) now to prevent this task
from becoming a critical one.
28What we plan for the next 6 months
- Submission of second prototype sensors
- Testing of the first prototype TBM/CNH and FEC
(FPGA), then with FED and new sensors with
final chip in Dmill - Layout of VHDI and HDI
- Continue tooling for the assembly
-
- Procure prototypes PSS for 1/2-Disk
29Summary and Conclusions
Summary and Conclusions
- FPix effort is now moving from RD to
prototyping. - Results from a test beam at CERN confirm the
expected position resolution. -
- Evaluation of first sensors submissions
completed. Second submission is being
prepared. - A submissions for bump bonding of blank multiple
- chips is being evaluated and gives promising
results. -
- Submission TBM/CNH chip to take place this month.
-
- Testing of prototypes TBM and FEC (FPGA) has
started will allow a Full System test (sensors,
ROC, FED, OL, ...)