CAMPUS NETWORK STATUSFUTURES - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

CAMPUS NETWORK STATUSFUTURES

Description:

Reality: Cat3 wireplant upgrade will take multiple years ... POE desirable; implies UPS in closets. IPv6. University of Washington. Computing & Communications ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 22
Provided by: ClaytonBud
Category:

less

Transcript and Presenter's Notes

Title: CAMPUS NETWORK STATUSFUTURES


1
CAMPUS NETWORK STATUS/FUTURES
  • Terry Gray
  • Director,
  • Networks Distributed Computing
  • UW Computing Communications
  • October 2001

2
Scope of UW Networking
  • UW Campus Networks
  • Seattle
  • Tacoma
  • Bothell/CCC
  • Medical Centers (net design)
  • UW Physicians Network
  • UW Medical Center
  • Harborview Medical Center
  • Pacific/NorthWest Gigapop
  • Pacific Wave exchange point
  • Pacific Light Rail
  • Statewide K20 Network

3
Pacific Northwest Gigapop
4
Baseline Connectivity
  • Shared 10Mbps HD
  • Switched 10Mbps HD
  • Switched 10/100Mbps FD
  • backed by GE switch/router infrastructure
  • Goal Switched 10/100 FD for all GE for a few
  • Reality Cat3 wireplant upgrade will take
    multiple years and multiple millions of dollars

5
Advanced Services
  • Multicast
  • Partially deployed
  • Older routers need to be replaced
  • QoS
  • Laissez faire? Premium service?
  • Best with FD connections.
  • VoIP
  • Needs QoS, extra-high availability
  • POE desirable implies UPS in closets
  • IPv6

6
Premium Services?
  • Wide-area QoS chargeback?
  • Preferred access to Internet for a fee?
  • Lots of interesting policy and tech issues...

7
Mistakes We Didn't Make
  • FDDI to the desk
  • VLANs
  • ATM
  • Various "cut-thru IP switching" digressions
  • Claim Staying with pure IP and Ethernet has
    served UW very well...

8
Current Statistics
  • Avg Backbone traffic nearly 2 TB/day
  • Peak Inbound traffic 100 Mbps (40 in 1999)
  • Peak Outbound traffic 160 Mbps (20 in 1999)
  • Doubling time Less than 2 years!!
  • Hosts over 50,000
  • Modems over 2,000
  • Switched subnets 70 (30 in 1999)
  • 10/100 FD subnets 25 (5 in 1999)
  • Cat 5 buildings 10

9
UW-S Building/Subnet Status
10
Deptl GigE Buildings
  • part of EE (2)
  • Part of HS J wing (1)
  • part of HS K wing (2)
  • part of HS T wing (1)
  • part of Johnson Hall (3)
  • part of Gerberding (1)
  • part of Thomson Hall (1)
  • Bowman (1)
  • Robertson Annex (1)
  • Physics/Astronomy (6)
  • Fisheries Center (2)
  • new Ocean (3)
  • Parrington Hall (1)
  • HecEd Graves (2)
  • Mary Gates Hall (10)
  • OUG Library (3)
  • Savery (1)
  • Sieg (8)
  • 4545 (5)

11
Simplified Network Topology
Core Switch
Gigapop
4
Fed Nets
Border Router
Internet2
Router
Router
30
Internet
Interior Switch
Interior Switch
300
PBX
Edge Switch
Edge Switch
1000
Branch Site
50,000
Desktop
Desktop
12

13
Number of Devices
14
Backbone Traffic
15
Border Traffic 1999 (2 day)
16
Border Traffic 2001 (2 day)
17
Border Traffic 2001 (6 hour)
18
Recurring Theme Explosive Growth
  • More users
  • More devices
  • Longer use
  • New (bandwidth-intensive) applications
  • e.g. remote collaboration tools
  • audio/video streaming
  • tele-immersion
  • distance learning

19
Networking Hot List
  • Campus building/subnet upgrades
  • Backbone upgrades (production, experimental)
  • Regional networking
  • Internet 2
  • Network Hardening
  • Security
  • Advanced Services
  • Wireless
  • Management/diagnostic tools

20
Some Success Metrics
  • 10/100 FD connections xx
  • Multicast deployment xx
  • QoS deployment xx
  • Deptl wireless coverage xx
  • Router center hardening xx
  • Backbone capacity
  • IPv6 capable routers

21
Questions?
  • Or comments
  • Or complaints...
Write a Comment
User Comments (0)
About PowerShow.com