Title: SmartFIX40 Closure
1SmartFIX40
Project Briefings
2SmartFIX40
Total Project Summary Information
- COST
- Construction Cost 190 Million
- Additional contractor incentives (potential)
13 Million - ROADWAY
- Mainline (freeway) 2.5 miles
- City Streets 4.0 miles
- Ramps / Frontage Roads 5.2 miles
- STRUCTURES
- 25 bridges
- 1 cut-and-cover tunnel
- 31 retaining walls
- 7530 linear feet of noise barriers
- TRAFFIC
- ADT 103,000 vehicles
3Downtown Knoxville
4SmartFIX40
What will be done during the closure?
Phase IV by the numbers
- I-40 widened to 6 through lanes
- 4 auxiliary lanes
- 9 Bridges
- 14 Retaining walls
- 3 Noise walls
- 5 Existing bridges will be demolished
- 7 New ramps
- 12 Side roads will be completed
5SmartFIX40
Why close I-40?
Time! Time! Time!
- Closing and rerouting I-40, eliminates 2 3
years of construction time, greatly reducing the
impact on the community and local economy - Reduces the chance for stopped or slow moving
traffic, reducing vehicle emissions
6SmartFIX40
7SmartFIX40
8SmartFIX40
Approximately 200 signs must be changed, removed
or modified for the closure of I-40
LOCAL TRAFFIC ONLY
Downtown Univ of Tenn
9SmartFIX40
Utilizing Innovative Techniques Huge Time
Savings
Downtown Univ of Tenn
10EXIT 385
Existing I-40 East approaching I-640/I-75
NORTH
EAST
Knoxville
Lexington
EAST
1 ¼ MILE
11Existing striping layout of I-40 East _at_ I-640/75
12EXIT 385
DETOUR NORTH
NORTH
EAST
Asheville
EAST
DETOUR EAST
Lexington Univ of Tenn Downtown
EAST
1 ¼ MILE
1 ¼ MILE
Lexington
Knoxville
Traffic in new lanes during closure
13Existing striping to be removed repainted to
carry 3 lanes onto I-640
14SmartFIX40
I-40 / I-640 Interchange West Side
uModify I-40 EB ramp to I-640 EB to 3
lanes uModify I-640 WB ramp to I-40 WB to 3
lanes uReduce I-40 WB to 2 lanes from downtown
past I-640 uReduce I-40 EB to 2 lanes towards
downtown over I-640
To Downtown
To Papermill Dr.
15SmartFIX40
I-40 / I-275 Interchange - Downtown
uI-40 EB (I-75 NB) ramp to I-275 NB modified to 2
lanes from I-40 uI-40 lane drop at Henley off
ramp u1 lane continues to James White Parkway
(I-40 until May 1)
Western Ave.
16SmartFIX40
I-40 / I-640 Interchange East Side
uI-40 WB ramp to I-640 WB modified to 3
lanes uI-640 EB to I-40 EB ramp modified to 3
lanes uI-40 EB reduced to 1 lane past I-640 WB
ramp
To Asheville Hwy
To Downtown
17SmartFIX40
Sequence of Events 6 Major Traffic Shifts
- Variety of sign and lane designation changes
- Traffic shifts will happen at night
- Weather permitting
- Plan subject to change
18SmartFIX40
Sequence of Events 6 Major Traffic Shifts
1201 AM May 1, 2008
- Install left lane closure on I-40 westbound
between Cherry Street and Hall of Fame Drive
diverting any I-40 westbound traffic into
downtown onto Hall of Fame Drive - Uncover Interstate Ends signs
- Close I-40 eastbound at James White Parkway exit
ramp diverting any traffic into downtown onto
James White Parkway
- Variety of sign and lane designation changes
- Traffic shifts will happen at night
- Weather permitting
- Plan subject to change
19SmartFIX40
20SmartFIX40
DOWNTOWN KNOXVILLE ADVISORY
CLOSED XX MILES
AHEAD LOCAL TRAFFIC ONLY
Metro and Rural
THRU TRAFFIC ONLY
DETOUR
20x14
21SmartFIX40
GPS Mapping Motorists Information
Welcome Centers Rest Areas I-81 TN/VA Sullivan
Co. I-40 TN/NC Cocke Co. I-75 TN/KY Campbell
Co. I-75 TN/GA Hamilton Co. I-24 TN/GA Hamilton
Co. I-40 Smith Co. I-40 Jefferson Co. I-81 Greene
Co. I-81 Jefferson Co. I-40 Cumberland Co.
22SmartFIX40
- Project Poster
- 3,000 High Traffic Businesses
- Hotels/Motels
- Restaurants
- Doctors Offices
- Retail
- Airport
- Banks
- Schools
23SmartFIX40
Outreach Plan
- TV Radio PSAs in Knoxville, Tri-Cities,
Nashville Chattanooga - Community Briefings E-mail list
- Special Media Coverage (News Sentinel, WBIR TV,
WNOX AM/FM) - Press availabilities (Press Conferences, Media
Kits, News Releases) - Bulk Mailings
- UT Sports / Bristol Motor Speedway
24SmartFIX40
Knoxville Version
25SmartFIX40
Questions?
www.smartfix40.com (865) 329-GO40 (4640)