Bridge Approach Remediation: Compaction Grout HB PolyLift - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

Bridge Approach Remediation: Compaction Grout HB PolyLift

Description:

... of casing through, or adjacent to 'sleeper slab' to a competent bearing stratum. ... columns via the 'bottom-up method,' to stabilize and re-level 'sleeper slab' ... – PowerPoint PPT presentation

Number of Views:165
Avg rating:3.0/5.0
Slides: 7
Provided by: haywar
Category:

less

Transcript and Presenter's Notes

Title: Bridge Approach Remediation: Compaction Grout HB PolyLift


1
Bridge Approach RemediationCompaction Grout
HB PolyLift
PowerPoint by thinayr.com
2
Hayward Baker Bridge Approach Remediation
Treating both the symptom and the cause for
over 25 years with economical and technical
solutions tailored to the project
Click to begin demonstration!
3
Problem
4
Solution
Step 3- Utilization of HB PolyLift Polyurethane
Foam Injection to fill voids and re-level
adjacent slabs.
Step 1- Advancement of casing through, or
adjacent to sleeper slab to a competent bearing
stratum.
Denver System
Grout Installation (bottom-up method)
Step 2- Install compaction grout columns via the
bottom-up method, to stabilize and re-level
sleeper slab
Lateral movement monitors
Competent Strata
5
Poly Lift
Step 3- Utilization of HB PolyLift Polyurethane
Foam Injection to fill voids and re-level
adjacent slabs.
Hey! Dont touch my car.
Lateral movement monitors