Use of Modern Technologies: CAPEVision - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Use of Modern Technologies: CAPEVision

Description:

Use of Modern Technologies: CAPEVision – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 26
Provided by: rossh3
Category:

less

Transcript and Presenter's Notes

Title: Use of Modern Technologies: CAPEVision


1
Use of Modern TechnologiesCAPEVision
Ross HindsPOC Quality of Service Seminar 5 April
2006
2
Outline
  • International Post Corporation
  • Quality basics for international mail
  • CAPEVision functions
  • A little technology
  • Summary

3
International Post Corporation
  • A cooperative of 23 Posts, founded in 1989
  • Australia, Canada, USA
  • 17 European Union Members(pre-2004 15 Cyprus,
    Hungary)
  • Other European (Iceland, Norway, Switzerland)
  • Services to Posts
  • UPU EMS Cooperative members (134 Posts)
  • UPU Parcels Group members
  • Kahala Posts Group in Asia/Pacific (Australia,
    China, Hong Kong China, Japan, Korea, and USPS)
  • Posts of Czech Republic, Poland, Slovakia
  • Based in Brussels, Belgium

4
International Mail Quality
5
Mathematics of Quality
6
The old International Mail Pipeline
UPU Technical Standards for interfaces between
pipeline sections
Measurement points now
Country B
Country A
The new International Mail Pipeline
7
The mail pipeline instrumentation
8
CAPEVision software
  • Operations Management functions
  • Quality management between Offices of Exchange
  • Air Road carriers
  • Production planning
  • Management of pool of over 400,000 letter trays
  • Designed for operations staff
  • Transport managers
  • Office of exchange staff
  • Tray managers
  • 2 years data on-line 40m receptacles/year
  • From electronic preadvice receipt confirmation
  • From vehicle RF-ID tag readings
  • All PostNet GXS despatch EDI messages

9
Quality Management Air carriers
10
CAPEVision Transport Failure indicator
Tail Time between first last receptacle
barcode scan
11
Transport failure indicator
1 day between first last scan of receptacles at
destination indicates split despatch
12
Transport detail
Planned despatch SQ 26
Consignment change to LH 400
LH 400 confirmed by LH
Despatch arrival on LH 400
13
Quality Management Road carriers
14
EDI for specific receptacle shown in this area
15
(No Transcript)
16
Query - low speed?
Receptacles shown in marked transport
EDI for specific receptacle shown in this area
17
Production Planning
18
Inbound arrival profile for 2 years Christmas
2004
Peak on 22nd December
19
Inbound arrival profile for 2 years Christmas
2005
Peak on 21st December
75 more on 20th December
20
Tray Pool Inventory Management
21
IPC letter tray 400,000 in use
22
Number of Trays at this Office of Exchange
Maximum number of trays surplus to be moved to
net exporter
Minimum No. of trays
Trays expected soon
23
Trays moved inside country
Trays moved to other country by IPC Tray manager
24
Some technology
  • Central system with no local application software
  • Access over public Internet
  • Need only Internet Explorer on local PC
  • Compliant with IT security policies
  • Central helpdesk at IPC for users of system
  • Runs 24 hours per day, 7 days per week
  • Oracle database running on Sun Solaris
  • Continuously enhanced now on version 9

25
CAPEVision - Summary
  • An operations management tool for mail flows
    between Posts
  • Air carriers
  • Road carriers
  • Production planning
  • Tray management
  • Used by hundreds of postal operations managers
    worldwide
  • Enables management to deliver high performance on
    international mail exchanges

26
Questions?
Write a Comment
User Comments (0)
About PowerShow.com