BSOP 330 ASSIST Peer Educator/ bsop330assist.com - PowerPoint PPT Presentation

About This Presentation
Title:

BSOP 330 ASSIST Peer Educator/ bsop330assist.com

Description:

BSOP 330 Master Planning All Weeks Discussion Questions Devry University BSOP330 Week 1 Lab Assignment Problems 4.1, 4.5, 4.9 and 4.11, pages 140-141 BSOP330 Week 2 Lab Assignments Chapter Four Problems 4.23, 4.27, 4.33, and 4.35 BSOP330 Week 2 Southwestern Case study BSOP330 Week 3 Lab Assignments Chapter 13 problems 13.3, 13.5, 13.9, 13.21 BSOP330 Week 4 Lab Assignments Chapter 12, problems 12.1, 12.5, 12.9, 12.15 BSOP330 Week 4 Quiz – PowerPoint PPT presentation

Number of Views:22

less

Transcript and Presenter's Notes

Title: BSOP 330 ASSIST Peer Educator/ bsop330assist.com


1
BSOP 330 ASSIST Peer Educator/ bsop330assist.com
  • FOR MORE CLASSES VISIT
  • www.bsop330assist.com

2
BSOP 330 Entire Course All Discussion Questions,
Lab Assignments, Quiz Case Study FOR MORE
CLASSES VISIT www.bsop330assist.com   BSOP 330
Master Planning All Weeks Discussion Questions
Devry University BSOP330 Week 1 Lab Assignment
Problems 4.1, 4.5, 4.9 and 4.11, pages
140-141 BSOP330 Week 2 Lab Assignments Chapter
Four Problems 4.23, 4.27, 4.33, and 4.35 BSOP330
Week 2 Southwestern Case study
3
BSOP 330 Master Planning All Weeks Discussion
Questions (Devry) FOR MORE CLASSES
VISIT www.bsop330assist.com   BSOP 330 Master
Planning All Weeks Discussion Questions Devry
University
4
BSOP 330 Week 1 Lab Assignment Problems 4.1, 4.5,
4.9 and 4.11, pages 140-141 (Devry) FOR MORE
CLASSES VISIT www.bsop330assist.com   Problems
4.1, 4.5, 4.9 and 4.11, pages 140-141. Problems
4.1 The following gives the number of pints of
type A blood used at Woodlawn Hospital in the
past 6 weeks a) Forecast the demand for the week
of October 12 using a 3-week moving average. b)
Use a 3-week weighted moving average, with
weights of .1, .3, and .6, using .6 for the most
recent week. Forecast demand for the week of
October 12.
5
BSOP 330 Week 2 Lab Assignments Chapter Four
Problems 4.23, 4.27, 4.33, and 4.35 (Devry) FOR
MORE CLASSES VISIT www.bsop330assist.com   Chapter
Four Problems 4.23, 4.27, 4.33, and
4.35. 4.23 a) Compute MAD and MAPE for
managements technique b) Do managements results
outperform (i.e., have smaller MAD and MAPE than)
a naive forecast? c) Which forecast do you
recommend, based on lower forecast error?
6
BSOP 330 Week 2 Southwestern Case study (Devry)
FOR MORE CLASSES VISIT www.bsop330assist.com Discu
ssion Questions 1. Develop a forecasting model,
justifying its selection over other techniques,
and project attendance through 2007. 2. What
revenues are to be expected in 2006 and 2007? 3.
Discuss the schools options.
7
BSOP 330 Week 3 Lab Assignments Chapter 13
problems 13.3, 13.5, 13.9, 13.21 (Devry) FOR
MORE CLASSES VISIT www.bsop330assist.com   Chapter
12, problems 12.1 L. Houts Plastics is a large
manufacturer of injection-molded plastics in
North Carolina. An investigation of the companys
manufacturing facility in Charlotte yields the
information presented in the table below. How
would the plant classify these items according to
an ABC classification system?
8
BSOP 330 Week 4 Lab Assignments Chapter 12,
problems 12.1, 12.5, 12.9, 12.15 (Devry) FOR
MORE CLASSES VISIT www.bsop330assist.com   Chapter
12, problems 12.1 L. Houts Plastics is a large
manufacturer of injection-molded plastics in
North Carolina. An investigation of the companys
manufacturing facility in Charlotte yields the
information presented in the table below. How
would the plant classify these items according to
an ABC classification system?
9
BSOP 330 Week 4 Quiz (Devry) FOR MORE CLASSES
VISIT www.bsop330assist.com   BSOP 330 Week 4 Quiz
10
BSOP 330 Week 4 Southwestern Case study Printing
companies Programs and Inserts (Devry) FOR MORE
CLASSES VISIT www.bsop330assist.com   Southwestern
University Case Study   1. For the programs,
what are the EOQ's for both printing companies?
How many orders of each size will be needed? 2.
For the inserts, what are the EOQ's for both
printing companies? How many orders of each size
will be needed?
11
BSOP 330 Week 5 Homework Problems Mater
Production Schedule Problem 1, 2 and 3 (Devry)
FOR MORE CLASSES VISIT www.bsop330assist.com   BSO
P330 Master Planning, Week 5, Problem 1 MASTER
PRODUCTION SCHEDULE MAKE-TO-STOCK Beginning PAB
prior to week number one is 500. If the forecast
is larger than the book orders, complete the MPS
using the forecast demand. If the booked orders
is larger than the forecast complete the MPS
using the booked orders
12
BSOP 330 Week 5 Quiz (Devry) FOR MORE CLASSES
VISIT www.bsop330assist.com   1. Question (TCO
9, 10, 12) The MPS Student Answer must sum up
to the total in the production plan. can have any
quantity necessary to meet customer demand. is
only used in make-to-stock manufacturing. does
not have to be tested for capacity limits.
13
BSOP 330 Week 6 Lab Assignments Chapter 14,
problems 14.1, 14.3, 14.9, 14.13 (Devry) FOR
MORE CLASSES VISIT www.bsop330assist.com   Chapter
14, problems 14.1 You have developed the
following simple product structure of items
needed for your gift bag for a rush party for
prospective pledges in your organization. You
forecast 200 attendees. Assume that there is no
inventory on hand of any of the items. Explode
the bill of material. (Subscripts indicate the
number of units required.)
14
BSOP 330 Week 7 Case Study Final (Devry) FOR
MORE CLASSES VISIT www.bsop330assist.com   Questio
n 1. Which variations in demand for police
services should be considered in an aggregate
plan for resources? Which variations can be
accomplished with short-term scheduling
adjustments?
15
BSOP 330 Week 7 Lab Assignments Chapter 16,
problems 16.1, 16.3, 16.5, and 16.9 (pages 640)
(Devry) FOR MORE CLASSES VISIT www.bsop330assist
.com   Chapter 16, problems 16.1, 16.3, 16.5, and
16.9 (pages 640-641) 16.1 Leblanc Electronics,
Inc., in Nashville, produces short runs of custom
airwave scanners for the defense industry. You
have been asked by the owner, Larry Leblanc, to
reduce inventory by introducing a kanban system.
16
BSOP 330 Week 7 Quiz (Devry) FOR MORE CLASSES
VISIT www.bsop330assist.com   1. (TCOs 5 12)
Manufacturing cycle time is best defined as the
(Points 4) length of the work shift, expressed
in minutes per day. time it takes a unit to move
from one workstation to the next. time between
the start of one unit and the start of the next
unit.
17
BSOP 330 ASSIST Peer Educator/ bsop330assist.com
  • FOR MORE CLASSES VISIT
  • www.bsop330assist.com
Write a Comment
User Comments (0)
About PowerShow.com