  • TOWN OF GRAND BAY-WESTFIELD
  • A Guide to homeowners and contractors who wish
    to
  • Construct, Alter or Add
  • Things to do before you start construction
  • 1. Prepare detailed drawings
  • 2. Prepare cost estimate
  • 3. Obtain required approvals and permits
  • You must obtain a permit when
  • Constructing a new home
  • Adding to an existing home rooms, garage,
    sundeck, fence,
  • pool, carport, etc...
  • Demolishing
  • Installing retaining walls

2
  • A GUIDE FOR THOSE WHO WANT TO
  • BUILD, REPAIR, ALTER OR ADD
  • WHERE TO GO
  • TOWN OF GRAND BAY-WESTFIELD
  • Grand Bay-Westfield Municipal Office
  • 609 River Valley Drive
  • PO Box 3001
  • E5K 4V3
  • Grand Bay-Westfield, N.B.

3
  • EXTRA POINTS
  • Building without a permit is illegal!
  • Construction must begin within 6 months of
    permit issuance
  • Construction must not be discontinued or
    suspended in excess of 1 year
  • No exterior surface intended to be cladded can
    be left uncladded in excess of 6 months
  • A permit is not necessary for maintenance, for
    example
  • Re-roofing
  • Painting
  • Plaster repairs
  • Drywall patching
  • Window replacement of the same size or smaller
  • Insulating finished floor replacement, wall
    papering or replacing existing exterior
    cladding for residential properties only subject
    to approval of exterior cladding type as it
    relates to fire separation requirements

4
  • DRAWINGS
  • All additions, alterations and new construction
    require 2 sets of drawings.
  • All drawings must be clear, detailed and
    dimensioned
  • INCLUDE Site plan, Materials list, Floor plan
    and Elevations

5
CHECKLIST
  • Complete application for building permit
  • Complete drawings - floor plans, site plans,
    elevations, materials list
  • Cost estimate prepared
  • Permit fee
  • Building Inspector notified 48 hours prior to
    starting
  • Building Inspector notified 24 hours prior to
    backfilling at any foundation wall
  • A copy of permit, plans and specifications must
    be kept on site
  • NOTE BUILDING PERMIT MUST BE ISSUED PRIOR TO
    COMMENCING WORK

6
  • OTHER DEPARTMENTS JURISDICTIONS
  • You may not need assistance and approval from
  • TOWN OF GRAND BAY-WESTFIELD
    738-6409
  • NB Power

    847-6000
  • NB Plumbing Inspections

    658-2510
  • NB Electrical Permits

    658-2510
  • Department of Environment

    658-2558
  • Fire Marshalls Office

    658-3081
  • ZONING BY-LAW
  • The Zoning By-law governs the use and occupancy
    of all property within the Town. The Development
    Officer should be contacted if any change in the
    use of your property is required. For further
    information please call 738-6409. The following
    activities provide a sample of activities
    requiring approval, i.e..., business office, auto
    repair, medical office, day care, etc...
  • APPEAL
  • The applicant may have the right to appeal to
    the Planning Advisory Committee and/or the
    Provincial Planning Appeal if the Development
    Officer does not approve a development. Please
    contact the Development Officer at 738-6409 for
    further clarification.

7
NEW SANITARY SEWER CONNECTIONS 1. The property
owner must obtain a sewer hook-up from the the
Town What is required
- original signature of
the current property owner -
plumbers permit issued by the Department of
Public Safety -
deposit of 500.00 (cash, money order, or
certified cheque) 2. The Town shall be
notified when the service lateral is ready for
inspection
(between 8 a.m. - 5 p.m., Monday to
Friday). 3. The service lateral shall not be
backfilled until approved by the
Town. REQUIREMENT FOR A BACKWATER VALVE All
homeowners should be aware of the necessity of a
backwater valve. The backwater valve is a check
valve and, when working properly, it can help
prevent a backup of sewerage water into the
basement area of your house, due to a sewer main
blockage. This valve should be installed on the
buildings sewer line just inside the foundation
wall, inside an access panel in the basement
floor. In cases where the buildings sewer line
goes through the wall, the valve must also be
accessible. Backwater valves need to be cleaned
periodically to ensure the valve is working
properly. The Town Sewerage By-law states that
all new homes must have a backwater valve
installed on the buildings sewer line inside the
foundation wall.
8
  • BUILDING PERMIT APPLICATION
  • TOWN OF GRAND BAY-WESTFIELD
  • MUST PROVIDE Site plan, specifications,
    materials list and cost estimate
  • IDENTIFICATION
  • OWNER _____________________________________PHONE
    ____________________
  • ADDRESS__________________________________________
    ______________________
  • CONTRACTOR ______
    IF SAME AS OWNER ______ IF OTHER
  • NAME_______________________________________PHONE
    _____________________
  • ADDRESS__________________________________________
    ______________________
  • Construction location____________________________
    ____________________________
  • Intended Use__________________________________Tot
    alArea____________________
  • True Estimated Cost______________________________
    ___________________________
  • Expected Start Date____________________Expected
    Completion Date_______________
  • I am aware of the requirements of the
    Grand Bay-Westfield Building By-law and my
    responsibilities thereunder, and I agree to use
    the above for the purpose stated only.
  • Date ________________________
    Signature___________________________________