Title: NonDestructive Testing
1Non-Destructive Testing
Approved for Public Release
2Topics
- Benefits and types of NDT
- Electric Boat requirements
- Results of Electric Boat NDT audits and typical
deficiencies noted - Improving compliance
Approved for Public Release
3Benefits of NDT
- NDT is, an examination of an object which will
not impair its future usefulness. - NDT allows 100 examination of parts, welds, etc.
when required. - Ensures compliance to specifications.
- Prevents catastrophic failures.
- NDT is a part of the Navys Level I and SUBSAFE
programs.
Approved for Public Release
47 Major NDT Methods
- Visual Testing (VT)
- Liquid Penetrant (PT)
- Magnetic Particle (MT)
- Radiographic (RT)
- Ultrasonic (UT)
- Eddy Current (ET)
- Material Verification (MV)
Approved for Public Release
5Topics
- Benefits and Types of NDT
- Electric Boat requirements
- Results of Electric Boat NDT audits and typical
deficiencies noted - Improving compliance
Approved for Public Release
6Electric Boat Requirements
- Methods that Electric Boat uses to invoke
specific NDT requirements upon suppliers - Standard Clauses in Purchase Order
- Various Standards and Specifications (Military,
Federal, ASTM, E.B. Specifications, etc.) - Electric Boat 2678, Quality Control Requirements
For Procured Material (VPARS)
Approved for Public Release
7Electric Boat Requirements
Approved for Public Release
8Electric Boat Requirements
Approved for Public Release
9Electric Boat Requirements
- S/C 60-67
- Nondestructive Test Procedure Approval
- Requires suppliers to submit NDT procedures to EB
for approval on a VPAR - Defines general requirements of NDT procedures
- Applies to suppliers sub-tier NDT suppliers
Approved for Public Release
10Electric Boat Requirements
- S/C 76-22A MT test reports
- S/C 76-22B LP test reports
- S/C 76-22C UT test reports
- S/C 76-22F LP of K-Monel
- S/C 76-22G 5x VT
- S/C 76-22J VT test reports of castings
- S/C 76-22H VT test reports for welds
Approved for Public Release
11Electric Boat Requirements
- S/C 76-95 RT film retention by EB
- S/C 76-24 Requirements for RT of castings
- S/C 76-22L NDT IAW with drawings or spec
Approved for Public Release
12Topics
- Benefits and Types of NDT
- Electric Boat requirements
- Results of Electric Boat NDT audits and typical
deficiencies noted - Improving compliance
Approved for Public Release
13EB NDT Audit Results
- Audited 65 of approximately 230 suppliers
- Significant deficiencies noted in 29 audits
- Poor audit performance rate of 44.6
Approved for Public Release
14EB NDT AUDIT RESULTS
Approved for Public Release
15EB NDT Audit Results
- Categories of Deficiencies
- Inspector performance
- Qualifications
- Equipment
- Procedures
Approved for Public Release
16EB NDT Audit Results
- Inspector performance MT
- 1 inch overlap not used during test
- Incorrect use of field indicator
- Incorrect removal of MT particles
Approved for Public Release
17EB NDT Audit Results
- Inspector performance PT
- Incorrect pre-cleaning
- Incomplete penetrant coverage
- Improper drying of test surface during PT
Approved for Public Release
18EB NDT Audit Results
- Categories of Deficiencies
- Inspector performance
- Qualifications
- Equipment
- Procedures
Approved for Public Release
19EB NDT Audit Results
- Qualifications
- Re-qualification by letter versus re-test
- Inspectors qualified to AWS versus MIL-STD-271
- Wrong vision test administered
- Vision test records incomplete-do not state
with/without glasses - Number of test questions not in accordance with
SNT-TC-1A
Approved for Public Release
20EB NDT Audit Results
- Categories of Deficiencies
- Inspector performance
- Qualifications
- Equipment
- Procedures
Approved for Public Release
21EB NDT Audit Results
- Equipment
- UT equipment not calibrated properly
- Gages for water temperature and pressure not
calibrated during water washable PT - No field indicator at job site
- No blow ball for removal to particles during MT
Approved for Public Release
22EB NDT Audit Results
- Categories of Deficiencies
- Inspector performance
- Qualifications
- Equipment
- Procedures
Approved for Public Release
23EB NDT Audit Results
- Procedures
- Company Written Practice permits re-qualification
by letter versus re-test - PT procedure does not address pre-cleaning
- Procedure not approved per S/C 60-67
- Improper transfer of procedures
Approved for Public Release
24VPAR Approval
EB EVALUATION AMC PT-2 Rev. 1 4/30/03 with Tech
No. 05-03 5/2/03 is approved for LPT of cladding
to T9074-AD-GIB-010/1688 with acceptance to
MIL-STD-2035 class 3 inboard, Class 1 for seating
or seal area class 2 for outboard surfaces as
required by T9074-AD-GIB-010/1688. Reviewed to
T9074-AS-GIB/271.
Approved for Public Release
25Topics
- Benefits and Types of NDT
- Electric Boat requirements
- Results of Electric Boat NDT audits and typical
deficiencies noted - Improving compliance
Approved for Public Release
26Improve Compliance
Approved for Public Release
27Improve Compliance
- Mil-Std-271 / Tech-Pub-271 is the top tier
document over SNT-TC1A - Mil-Std-271 requires re-certification by
re-examination vs. SNT-TC1A which allows
recertification by satisfactory performance - Mil-Std-271 requires vision testing to Jaeger 1
lettering vs. SNT-TC1A which allows Jaeger 2
lettering
Approved for Public Release
28Improve Compliance
-
- Personnel Qualification
- Must be in accordance with Mil-Std-271 /
Tech-Pub-271 Paragraph 1.6 in addition to the
requirements of SNT-TC-1A, 2001.
Approved for Public Release
29Improve Compliance
- Review your companys Written Practice for
compliance with BOTH Mil-Std-271 / Tech-Pub-271
and SNT-TC-1A - Inspectors performance must be audited
periodically (recommended at least yearly) - Calibrate equipment (pressure gages,
thermometers, etc.)
Approved for Public Release
30Improve Compliance
- Transfer of NDT procedures from one activity to
another activity is prohibited without specific
NAVSEA approval
Approved for Public Release
31Improving Compliance
- The effectiveness of NDT depends upon the
capabilities of the personnel who are responsible
for and perform NDT. - Questions regarding this presentation can be
directed to Electric Boat Supplier Quality or
Electric Boat NDT Engineering.
Approved for Public Release
32Conclusion
Approved for Public Release
33Conclusion
- The stakes are high!
- Given a choice we would rather answer a question
than solve the problem
Approved for Public Release