AN OVERVIEW OF BOKARO STEEL PLANT
INDUSTRIAL TRAINING REPORT PRESENTATION
BY- TARANG
BANSAL ELECTRICAL
08EBKEE058
www.powerpointpresentationon.blogspot.com
2
CONTENTS
  • Introduction
  • Objective
  • Departments Visited
  • Raw Materials and Materials Handling Plant
  • Sintering Plant
  • Coke Ovens and By Product Plant
  • Blast Furnace
  • Slabbing Mill
  • Continuous Casting Shop
  • Steel Melting shopII
  • Hot strip Mill
  • Cold Rolling Mill
  • Result
  • Conclusion

3
Introduction
  • BOKARO SAIL is the fourth largest integrated
    Steel plant (PUBLIC SECTOR) in India.
  • At present it houses five blast furnaces with
    total capacity to produce 4.5 MT of liquid steel.
  • It manufactures Steel which is an alloy of iron
    and carbon where the carbon content is 0.2 to
    2.5 which depends upon the grade of
    steel.
  • Melting temperature of iron 1536 degrees
    celsius.

4
Outer View
5
OBJECTIVE
  • To interact and learn from the experience of
    trained engineers,supervisors and other
    organization employees.
  • To differentiate between real working scenario
    and uncertainities and the text book knowledge
    and to analyse the gap between the two.
  • To get an insight into the various processes and
    the sequence of steps in the manufacture of steel
    and other products.
  • To understand and appreciate the extent of
    coordination required between various departments
    for the success of the organisation.

6
Raw Materials Material Handling Plant (RMHP)
  • Functions
  • 4 Raw Materials
  • Suppliers
  • Process
  • 18 Beds
  • Wagon Tiplers
  • Stackers
  • Reclaimers

7
Coke Oven BPP
  • Battery of ovens.
  • Coal is converted into coke in anaerobic
    conditions at temperature-1250 degrees celsius.
  • Cars involved for production -
  • Pusher car.
  • Guiding car.
  • Quenching car.
  • Charging car.

8
Sinter Plant
  • Fed into sinter furnace on moving pallets
  • Crushed cooled
  • 5mm crushed sinter sent to BF rest reused
  • Agglomerated mass of iron ore, flux
  • Increases efficiency, reducibility,
  • reduces coke rate

9
BLAST FURNACE
10
Steel melting shops-sms1 sms2
  • Steel melting- process of removal of impurities
    like carbon and silicon.
  • Oxygen blowing process.
  • It receives hot metals from blast furnace.
  • Output of sms1 is in ingot form.
  • Output of sms2 is in slab form.
  • From sms2 it goes to continuous casting shop.
  • Molten metal to CCS

11
SMS II
12
Continuous Casting Shop
  • SRU refining, composition, temperature
  • Argon purging

The main function of Continuous Casting Shop is
to produce steel slabs directly from the molten
steel coming from SMS-II and sending them to Hot
Strip Mill (HSM) for hot rolling.
13
Slabbing Mill
  • Rolling
  • Shearing
  • Piling
  • SMS 1 Ingot route
  • Ingot rolling
  • Same function as CCS

14
HOT STRIP MILL
  • Hot rolling- plastic deformation of metal above
    crystallization temperature by squeezing it
    between pair of roller.
  • The capacity of HSM4 MT.
  • HSM has 2000 mm wide strip
  • Mill.

15
Cold Rolling Mill
16
Electrical equipments in Sail
SLIP RING MOTORS FOR A MILL FAN
DCC AS INSULATION IN STATORS
17
Electrical repair shop 1 2
  • Ac Arc Welding Only used in the transformers.
  • Carbon Brushes Repaired in the
  • broker arm.
  • Autotransformers Used as
  • the current regulators.
  • Motors
  • Squirrel cage motors.
  • Synchronous motors.
  • Slip ring motors.

SYNCHRONOUS MOTOR
18