Title: On-site Emergency Preparedness
1 On-site Emergency Preparedness National Workshop
on Disaster Management 24-26 Sept 08 at
Secunderabad, A.P. A.Y. Sundkar NATIONAL SAFETY
COUNCIL
2FEW MAJOR DISASTERS IN WORLD
3EXPLOSION
4TOXIC RELEASE
4
5Off-site Emergency Plan
On-site Emergency Plan
Physical Protection (Dikes)
Physical Protection (Relief Devices)
Automatic Action (Sprinkler, etc.)
Critical Alarms, Operator Supervision, Manual
Intervention
Basic Controls, Process Alarms, Operator
Supervision
Typical Layers of Protection
Mitigation system responses
6Chemical Accidents in India (2002-06)
Product loss of Rs.11.5 crore
7Chemical Accidents in India (2002-06)
Impact
Source
Date
Industry
Sl.No.
Injury
Death
-
-
Benzene fire
12.04.04
Shyamlal Industries, Vatva, Ahmedabad
10.
27
-
Chlorine leak
18.7.04
Chemplast, Metture, TN
11.
8
1
Hexane release fire
31.5.04
Chemical Factory, Dombivilli, Maharashtra
12.
13
2
Explosion in slurry settler
29.10.04
Gujrat Refinery, Vadodara
13.
2
1
Fire in Dryer room
30.10.04
Ranbaxy Laboratories Ltd., Mohali, Punjab
14.
-
1
Explosion
23.11.04
Kekule Pharma Ltd.
15.
20
-
Chlorine release
1.12.04
PWD premises
16.
-
-
Fire
15.6.05
Gujrat Refinery
17.
5
-
Ammonia
22.7.05
Coromondal Fertiliser, Ltd., Ennore
18.
8Chemical Accidents in India (2002-06)
Impact
Source
Date
Industry
Sl.No.
Injury
Death
2
2
Explosion/ Fire
Gulf Oil Corporation Ltd., Hyderabad
19.
4.10.05
Orchid Chemicals pharmaceuticals Ltd, TN
4
1
Explosion
3.11.05
20.
-
1
Fire
29.12.05
IOCL, Mathura
21
23
6
Cl release
29.3.06
Kanoria Chemicals Industries Ltd , UP
22
-
5
Spillage of haz chemical
18.07.06
Anjana Explosives Ltd, AP
23
-
1
Gas Release
19.9.06
Ravi Organics Ltd , UP.
24
2
Fire
25.10.06
RIL, Jamnagar
25
-
9- EMERGENCY A situation created by an
accidental release or spill of hazardous
chemicals which poses a threat to the safety of
workers, residents, the environment or property
MSIHC Guidelines by MoEF, 1996
10EMERGENCY PLAN A formal written plan which,
on the basis of identified potential accidents
together with their consequences, describes how
such accidents and their consequences should be
handled, either on-site or off-site
Guiding Principles Chemical Accident Prevention
Manual, OECD, 2003
11- Disaster Management means a continuous and
integrated process of planning, organising,
coordinating and implementing measures which are
necessary or expedient for - Prevention of danger or threat of any disaster
- Mitigation or reduction of risk of any disaster
or its severity or consequences - Capacity building
- Preparedness to deal with any disaster
- Prompt response to any threatening disaster
situation or disaster - Assessing the severity or magnitude of effects
of any disaster - Evacuation, rescue and relief
- Rehabilitation and reconstruction
The DM Act, 2005
12EMERGENCY may caused by 1. Process and Safety
System failure - Technical Errors (Design
defects, fatigue, metal failure, corrosion,
etc.) - Human Errors (neglecting safety
instructions, deviating from specified
procedure, etc.) 2. Natural Calamity
3. Sabotage/Terrorist Attack
13- Emergency normally manifest in three basic forms
- Fire
- Explosion or
-
- Toxic
Emergencies with chemical industry concern are
1. Plant Emergency (On-site)
Off-site Emergency
2. Transport Emergency
14EMERGENCY PLANS
- To mitigate effects of Emergency requires
- - Thoughtful Planning
- - Better Preparedness
- - Quicker Response
- Emergency Planning not substitute for
maintenance of good safety systems, procedures
and practices - Accident Prevention through good design,
operation, maintenance and inspection
15EMERGENCY PLANS
- Emergency Planning is an important element of
mitigation - On-site Off-site emergencies are separate but
are to be consistent - Transport Emergency requires different treatment
The Plan should be kept simple and flexible,
but capable of being scaled up or down as
circumstances demand
16EMERGENCY PLANNING STATUTORY FRAME-WORK
17FACTORIES ACT, 1948
- Section 41 A to H Hazardous Processes
- Section - 41 B (4)
- Occupier to draw up an On-Site Emergency Plan
Disaster Control Measures for his factory - Make safety measures to be taken in the event of
an accident known to- - - Workers
- - Public in the Vicinity
18MSIHC Rules, 1989
- MAH Installations Threshold Quantity
- Industrial Activity at a Site Handling Hazardous
Chemicals and Isolated Storage Equal to or in
Excess of Threshold Quantities.-Schedules-23
column 3 - Unit Isolated Storage
- AMMONIA 50 T 60 T
- LPG 15 T 50 T
- CHLORINE 10 T 10 T
19MANUFACTURE, STORAGE AND IMPORT OF
HAZARDOUSCHEMICALS, RULES,1989 (MSIHC RULES)
- 13. PREPARATION OF ON-SITE EMERGENCY PLAN
BY THE OCCUPIER - (1) Occupier to prepare and keep up-to-
date an On-Site Emergency Plan with
specified details (Schedule11) detailing - - dealing with major accidents on site
- - name of the Person responsible for
Safety on site - - names of authorised persons to take
actions as per the Plan in case of an
Emergency.
20MANUFACTURE, STORAGE AND IMPORT OF
HAZARDOUSCHEMICALS, RULES,1989 (MSIHC RULES)
- (2) The Occupier to ensure that the On-Site
Plan includes modifications and all persons
on site affected by the Plan are informed
accordingly. - (4) The Occupier to ensure to conduct a mock
drill of the On-Site Emergency Plan every 6
months. - (5) Detailed report of mock drill to be made
immediately available to the authority.
21ELEMENTS OF ON-SITE EMERGENCY PLAN (Based on
APELL Model)
APELL A Process for responding to
Technological Accidents - Developed by
UNEP in 1986 - Implemented in India in 1992 in
six-high risk Industrial Areas
22- Introduction
- Legal Requirement
- Basis of the Plan
- Purpose and objective
- About Factory location name address of
the person furnishing the information, no. of
people and brief process description
23- 2. Plant Emergency Organization
- Designated person in-charge/alternates
- - SC, IC, Leader of communication, Fire
Rescue, Medical, Security, Logistics - Functions of each key individual and group
- Telephone numbers (office and home) for key
people/alternates - Emergency Control Centre /alternate (ERC)
- Assembly Points
24- 3. Plant Risk Evaluation
-
- Quantity of hazardous materials
-
- Location of hazardous materials (on Factory
Layout) -
- Properties of each (MSDS sheets)
- Likely Dangers to the Plant Emergency
Scenario (s) summary location-wise -
- Location of isolation valves
-
- Special fire fighting procedures (if any)
-
- Special handling requirements
25- 4. Area Risk Evaluation
- Properties of hazardous materials at nearby
plants - Nearby residence and population centre
-
- Contacts (names, telephone numbers) at other
sites. - Established procedures for notification of
chemical releases at other sites in area - Natural Calamities which can lead to
emergency Flood, Cyclone, Earthquake
26-
- 5. Notification Procedures Communications
Systems - ? Declaration of Emergency
- ? Communication System
- Alarm Systems
- Communication equipment (radios, hot lines,
etc.) - Designated person for media contacts
- Procedure for notifying families of injured
employees - Central reporting Office (ERC)
27- 6. Emergency Equipment and Facilities
-
- Fire fighting equipment
- Emergency medical supplies
- Toxic gas detectors (where needed)
- Wind direction/speed indicators
- Self-contained breathing apparatus
- Protective clothing
- Other on-site equipment to be specified
according to local conditions - Containment capabilities
-
28 7. Procedure for Returning to Normal
Operations ? Authorisation ? Declaration
of the end of emergency ? Communication of
the Declaration of end of
emergency
29- 8. Training and Drills
- Training of Team Leadres
- Training of Emergency Responders
- Emergency Drill
- - Frequency and Responsibility
- (MSIHC 6 months)
30- 9. Regular Tests of Emergency Organization/Proce
dures - Simulated emergencies
- Documented, frequent alarm system
- Frequent tests of fire fighting equipment
- Evacuation practice
- On-going emergency preparedness committee
31- 10. Plan Updates
- Annual or more frequent if needed
- Reflect results of drills and tests
- Review of the Plan
- Responsibility for updating the Plan
32- 11. Emergency Response Procedures
- Communications
- Evacuation or safe haven
- Medical (include handling of multiple
injuries) - Special procedures for toxic gas releases
(chlorine, etc.) - Hurricane procedures (coastal areas only)
- Utility failure procedures
- Individual unit emergency procedures
- Bomb threat procedures
33- 12. Detailed Operating Manuals
- (for each process unit and utility system)
- Start-up / Shut-down emergency procedures
- Analysis of potential incidents
- Emergency response and action to be taken for
each incident
34- On-Site Emergency Plan Separate Section
- Information for use in the Off-Site Emergency
Plan which may include - Summary of Risk Analysis, vulnerability zone
for those scenarios which can escalate into
off-site emergencies. - List of resources required to handle the
off-site emergencies foreseen in the On-site
Plan, their assessment of the adequacy. - If own resources (such as equipment, trained
man-power, medical help, etc.) are not
adequate to meet such off-site emergencies,
what is the arrangement (formal or informal)
made to get the additional resources (e.g.
Mutual Aid or arrangement with the Public
Response Agencies) mentioning the salient terms
of such arrangements.
35- Contents of the separate section contd
- What resources can be spared by the industrial
unit for use in the Off-site Emergency arising
out of on-site emergencies of other units and
what is the arrangement for releasing such
resources. - How Community awareness programme has been
planned? How the community has been identified
(from which zone-part or full vulnerability
zone)? Have the key opinion makers who can play
active role have been identified? (Give list
alongwith their contact details). Has the
selection of the community or that of key persons
in the community been done in consultation with
the District Authority? etc.
36- Contents of the separate section contd
- Has Insurance under the Public Liability
Insurance Act been obtained? Give summary. - Designate a Contact person who would be
authorised to co-ordinate for Off-site Plan and
his contact details - Technical Team (chemical-wise) in case of an
Off-site Emergency taken place due to escalation
of an On-site incident, contact details of its
members.
37THANK YOU
38ORGANISATION CHART
39Cinema Hall
Hospital
Facility where Accident Take Place
School
40OISD Standard 117 Fire Protection Facilities
for Petroleum Depots, Terminals and Pipeline
Installations
- Alarm/communication System
- Electrical/hand operated Fire Siren with code
- 1. Small Fire - No Siren
- 2. Major Fire - A wailing siren for 2 min. ( 3
times for 30 sec with an interval of 15 sec
in between - 3. Disaster - Same as above but interval of 2
min - 4. All Clear - Straight run for 2 min.
- 5. Test - Straight run for 2 min.
41- Ref
- Factories Act, 1948
- MSIHC Rule, 1986
- CA(EPPR) Rules, 1996
- PLI Act
- Major Hazard Control A Practical Manual by ILO
- Hazardous Material Emergency Planning Guide by
National Response Team, USA
42 GAPS OBSERVED IN THE ON-SITE EMERGENCY PLANS
43- Introduction
- Developed Off-site Emergency Plans
- - Tuticorin
- - Haldia
- On-site emergency if uncontrolled become
off-site emergency - Better on-site preparedness and therefore
planning can avert off-site emergency. - For preparation of Off-site Emergency Plan,
On-site Emergency Plans (OEP) is the basis as
there is close relation between them. - Decided to scrutinise on-site plans
44- Introduction Contd.
- Scrutinised on-site Emergency plans of MAH Units
by a team of NSC Officers and experts -
- Tuticorin - 13 Plans
- Haldia - 16 Plans
- For scrutinising the OEPs checklist developed
45- Gaps observed in OEPs
- In Plant Emergency Organization following were
missing - Alternative member to Designated persons
- Functions of key individuals/groups
- 24 hrs. telephone numbers for key persons and
their alternates - Emergency Control Room facility
46- Gaps observed in OEPs
- Plant Risk Evaluation
- Absence of information on
- quantity, type of storages and locations of
hazardous materials - characteristics, dangers, toxicological data and
emergency response of Hazardous Chemicals. - Location of isolation valves
- Special fire fighting procedures (if any)
- Identification/ description of representative
scenarios - Development of the scenarios on real time basis
- Marking of Vulnerability Zone on layout plan
including those which may escalate into Off-site
emergences
47- Gaps observed in OEPs contd.
- Area Risk Evaluation
- Emergency Scenario
- Consequences of accidents in neighbouring plants
creating on-site/off-site emergency as a part of
Area Risk Evaluation - Consideration of Natural calamites triggering
on-site emergencies - Security arrangements to combat threats
(sabotage, terrorist attack, etc.)
48- Gaps observed in OEPs contd.
- Notification Procedures and Communication System
- Absence of information on
- - Communication equipment (hot lines,
Walky- Talky, etc.) - - Neighbouring industry
- - Nearby residents
- - Designated person for media contacts
- - Procedure for notifying families of injured
49- Gaps observed in OEPs contd.
- Assessment of the resources by the Plant
Management - Absence of information about Trained Manpower
(Technical, Medical Fire fighters) - ii) Emergency Equipment and Facilities
- Fire fighting equipment
- Emergency medical supplies
- Toxic gas detectors (where needed)
- Wind direction/ indicators
- Self-contained breathing apparatus
- Protective clothing
- iii) Arrangement with organizations (formal or
informal) for additional resources required to
handle the emergencies
50- Gaps observed in OEPs contd.
- Training
- Types vis-à-vis level of participation, frequency
of training
51- Gaps observed in OEPs
- Regular tests of emergency organization/
procedures Information not available - Types vis-à-vis target groups, frequency,
documentation, methodology of Drills - Simulated emergencies
- Testing and Documentation of alarm system
- Frequent tests of fire fighting equipment
- Evacuation practice
52- Gaps observed in OEPs
- Plan Updates
- In general there is no coverage of plan updates.
- In specific
- Frequency
- Reflect results of drills and tests
- History Sheets giving details of
updates/revisions including date of Preparation
of the Plan - Responsibility on a person to update the Plan
53- Gaps observed in OEPs
- Emergency Response Procedures
-
- Not mention about
- Medical response procedure for handling multiple
injuries - Procedure for arrangement in case of utility
failure - Bomb threat procedures
- Location of Assembly Points and marking on the
Layout Plan - Escape routes
54- Gaps observed in OEPs contd.
- General
- Pages not numbered
- Absence of contents page
- Some cases the content does not match with the
matter in the plan