Title: AFCESA Contract Opportunities Briefing
1AFCESA Contract Opportunities Briefing
Mr. Michael Clawson, PE, REM Chief, Contract
Support Division 26 July 2011
2AFCESA Contract Programs
- Sustainment, Restoration, and Modernization
(S/RM) - Air Force Contract Augmentation Program (AFCAP)
- Labor Support
- Utilities Privatization
- Energy Savings Performance Contracts
Programs in red not included in this briefing
3AFCESA S/RM Support
- A/E Services - Planning, Design, Const
Management - Construction Services
- Infrastructure OM
- Task Order Development, Negotiation, Award
- Task Order Management
- PM oversight/Title II
- Funds Management
- Contract Administration
- Financial/physical closeout
- Technical Reach Back
Repair Runway Dover AFB
4S/RM Support Business Model
- Enable successful execution of complex Air Force
S/RM - Synergy of top Air Force contract management and
technical subject matter expertise - Host of proven contractors, readily available
worldwide - Integrated contracting capability accelerated
acquisition - Execution enabler for customers
Replace Rwy 06/24 McGuire AFB
5AFCESA S/RMCore Competencies
- FOA SRM execution is aligned along Core
Competencies - AFCESAs Core Competencies
Facilities Civil Mechanical Electrical
Anti-Terrorism/ Force Protection Life Safety Energy Roof Systems Structural Systems Airfield Lighting/Marking Pavements Structural/Friction Evaluations Water/Wastewater/ Solid Waste Aircraft Arresting Systems HVAC Systems Fire Suppression Natural Gas Systems Boiler Systems Plumbing Systems POL Systems Industrial Waste Systems Elec Distribution Power Plants Ext/Int Elec Generators Lightning Protection SCADA Cathodic Protection
5
6S/RM Contract Toolbox
- Dollars By FY
- FY08 - 458.5M
- FY09 - 443.0M
- FY10 - 395.2M
- FY11 387M (Projected)
- AE Services
- 4PAE/08
- 29 contractors
- 3B w/ ordering period through Aug 2013
- DCO authority from AFCEE
- Construction Services
- S/RM Acquisition Task Order Contract (SATOC)
Charleston AFB Runway Repair
7S/RM Acquisition Task Order Contract (SATOC)
- Multiple Construction Delivery Methods
- Turnkey, Design-Build, Traditional Construction
- 20 contractors including small business
- 8(a), Hubzone, and Service Disabled Veteran Owned
Small Business - Program Ceiling
- 5-year basic (4B), 5 one-year options (total 10
yrs _at_ 4B) - Based on forecast for FY06-FY10 S/RM Program
- Current Flexibility for unknown (unpredictable)
disaster response/contingencies - Awarded May 2008
- Limited DCO Authority issued to other AF
Contracting offices
8SATOC Contractors
- Toltest
- NorthWind
- SEI Group, Inc.
- Weston Solutions
- Johnson Controls/Versar JV
- Barlovento, LLC
- J2 Engineering
- Charter Environmental
- DWG Associates
- EQM
- AMEC
- CDM/CAPE JV
- CH2M Hill
- AECOM
- ECC
- Innovative Technical Solutions
- Jacobs Government Services
- Parsons
- Tutor Perini Corp
- MACTEC
-
SB
9AFCAPWhat is it?
Definition a contingent contract tool, teaming
Government private industry, providing
responsive solutions to National Command
Authority challenges - - leveraging greater
impact toward meeting urgent demands
- Multi-year/vendor, ID/IQ-type contract, for
contingencies - Capable of rapid response
- Available to support National Command Authority
- Awarded 2005, Ends 30 Sep 2015
9
10Response SpectrumBroad Range of Capabilities
- Installation Support Services
- Fill forward gaps
- Sustainment
- Reconstitution
- Bridge home station shortfalls
- Contingent Logistics
- War reserve materiel augmentation
- Vehicles heavy equipment / leases
- Just-in-time supplies / materials
- Humanitarian relief support
- Expeditionary Construction
- Planning, facility hardening
- Emergency, disaster/base recovery
- Site restoration
10
11AFCAP in SWACurrent Locations
KAZAKHSTAN
Manas
GEORGIA
KYRGYZSTAN
UZBEKISTAN
AZERBAIJAN
TURKEY
TURKMENISTAN
TAJIKISTAN
Kirkuk
CHINA
Speicher
Balad
Bagram
Victory Base Complex
Taji
Jalalabad
AFGHANISTAN
IRAN
Sharana
Al Asad
Salerno
IRAQ
Ali Al Salem
Kandahar
JORDAN
Sather
Al Jaber
PAKISTAN
Ali
KUWAIT
Al Udeid
BAHRAIN
INDIA
SAUDI ARABIA
QATAR
UAE
Al Dhafra
OMAN
11
12AFCAP DemographicsFiscal Year 2010
Funded amount 385M, Quantity of actions 302
Customers by of
Task types by
6
372.9 11.3 0.4
61.1 293.1 22.2 8.1
16
3
76
97
Customers by qty of actions
Task types by qty of actions
10
13
80
85
13Surge Capability Required How Fast?
- MISSION Curb the tide of death human
suffering - Haiti Earthquake cholera outbreak
- human remains pouches
- pharmaceuticals
- IVs surgical kits
- cholera beds
- water purification
- Mexico flooding
- kitchen sets
- Pakistan flooding
- concrete saws
- water purification
- blankets, tarpaulins
13
14Disaster ResponseAF Needs Response to Civil
Authorities
- Elevated tornado season
- Hurricane season starts 1 June
- AFCAP has provided
- damage assessments
- route clearing
- backup generators
- utility restorations
- heavy equipment
- debris removal
- measures to cease further degradation of
facilities - blue roofs
- mold remediation
- temporary facilities
- facility restorations
14
15AFCAP ContractorsPrime Contractors
- URS Group, Inc Louis Berger Group, Inc, JV
-
- DynCorp International, LLC
-
- CH2MHill KBR Global Services, LLC
-
- Readiness Management Support, LC
-
- URS Energy Construction (formerly Washington
Group)
15
16Labor Support
- GSA recently awarded new follow-on multi-award
Labor Support BPAs for AFCESA support - Replaces current single award BPA
- Current BPA provides over 400 FTEs to Air Force
- New BPAs use 8 existing GSA labor schedules
- Selected Firms
- Booz Allen Hamilton Inc
- J. M. Waller Associates Inc
- Northrop Grumman Information Tech. Inc.
- Future AFCESA requirements will be competed among
these BPA holders
16
17Labor Support
- Intent is for AFCESA to use this vehicle for 2
years for AAS and 3 years for Non-AAS Labor
Support Requirements - Current plan is to off-ramp AAS requirements to
the new GEITA contract and non-AAS to a yet to
be defined contract - BPAs awarded by GSA are for 5 Years
- By going through GSA, this contract vehicle is
available for use by DoD organizations other than
AFCESA
17
18Opportunity Summary
- Partnering with current contract holders on
AFCAP, SATOC, Labor Support is one alternative
for going after AFCESA contract opportunities - Starting procurement for AFCAP IV on horizon
- Transition of AFCESA AAS requirements to GEITA
19Questions
20Backup Slides
21SATOC Contractor Contact Info
- MACTEC
- Attn Pete Campbell
- 9177 Sky Park Court
- San Diego, CA 92123
- Â
- NorthWind, Inc.
- Attn Rusty Gilbert
- 433 Kitty Hawk Road, Suite 211
- Universal City, TX 78148
-
- Parsons Infrastructure Technology Group, Inc
- Attn Jerry Osterwiecki
- 100 West Walnut Street
- Pasadena, CA 91124
- Â Â
- SEI Group, Inc.
- Attn SATOC-Jensen Osterdorf
- 303 Williams Ave, Suite 135
- Huntsville, AL 35801
DWG Associates Attn Carl Johnson 8535 S. 700
W. Unit 1-A Sandy, Utah 84070 Â ECC Attn Jeff
Leptrone 433 Harrison Ave Panama City, FL 32401
Environmental Quality Management, Inc. Attn Jim
Zody 1800 Carillon Boulevard Cincinnati, Ohio
45240 Â Â ITSI Attn Dan R. Ledford 2730
Shadelands Drive, Suite 100 Walnut Creek,
California 94598 Â J2-Engineering, Inc. AttnL
Joes Morales 6921 Pistol Range Road, Suite
101 Tampa, FL 33635 Â Â Jacobs Government
Services Attn Debra Hickman 125 Broadway
Avenue Oak Ridge, TN 37830 Johnson
Controls/Versar (JCFSV) Attn Brenda Chube 6850
Versar Center, Ste 200 Springfield, VA 22151-4175
AECOM Technical Services, Inc (EarthTech) Attn
Jennifer Mullins 717 17th Street, Suite
2600 Denver, CO 80202 Â Â AMEC Earth
Environmental, Inc Attn York Thorpe 2308 E. 9th
Street Lynn Haven, FL 32444 Â Â Barlovento,
LLC Attn Jane Soloman 431 Technolgy
Drive Dothan, Al 36303 Â CDM/CAPE, a Joint
Venture Attn Patrice Melancon TBPE Firm
Registration No. F-3043 12357-A Riata Trace Pkwy,
Ste 210 Austin, TX 78727 Â Charter
Environmental Attn Tim Cady 560 Harrison
AvenueSuite 500 Boston, MA 02118-2592 Â Â CH2M
Hill Constructors, Inc Attn Bill Owens 3011 SW
Williston Road Gainesville, FL 32608 Â
22AFCAP Contractor Contact Info
- URS Group, Inc Louis Berger Group, Inc, JV
- Mr. Kurt Bergman e-mail
URSAFCAPPMP_at_urscorp.com -
- DynCorp International, LLC
- Mr. Eppie Walker e-mail
eppie.walker_at_dyn-int.com - CH2MHill KBR Global Services, LLC
- Mr. Henry Arboleda e-mail
henry.arboeda_at_ch2m.com - Readiness Management Support, LC
- Mr. Dan Barker e-mail daniel.j.barker_at_iap
ws.com - URS Energy Construction (formerly Washington
Group) Mr. Alex Formwalt e-mail
alex.formwalt_at_urs.com