Title: Updates on Muara Port Brunei Darussalam


1
Updates on Muara PortBrunei Darussalam
  • BY MARSALINAWATI HJ OMARALI
  • MARKETING OFFICER
  • marsalinawati.omarali_at_ports.gov.bn

2
Vision and Mission
3
Muara Port Layout
Note-
Restricted Areas
Multi Purpose Hall
Muara Export Zone
BLOCK 7
INLAND CONTAINER DEPOT (ICD)
Car Park
To B.S.B
BLOCK 6
BLOCK 5
To Bandar Seri Begawan (B.S.B)
PORTS DEPT HQ
Trailer Parking
Brunei Shell Marketing Bitumen
Trailer Parking
BLOCK 1
Brusima Cement Silo
OPEN AREA
CAR PARK
C F S
TRAILER PARKING / CONTAINER YARD
Muslim Graveyard
Parking Lots
BLOCK 2

CONTAINER YARD
Water Tank
Gate House
Container Freight Station (CFS)
BLOCK 3
Operation Office
CONTAINER YARD
MUARA TOWN
Container Yard
Gate House
Reefer Station
Reefer Station
BLOCK 4
Workshop
CONTAINER YARD
OPEN AREA
Ports Department Warehouses

CARGO STORAGE AREA
Transit No.3
Transit No.2 A B
Cruise Ship Centre Transit No. 1
CONVENTIONAL TERMINAL
CONTAINER TERMINAL
611m
250m
4
Project Updates
5
Project Infrastructure / Services
  • Logistics hub
  • Upgrade warehouse into bonded warehouse (ongoing)

6
Hinterland Connectivity
  • Logistics Development Project
  • Benefits
  • Decrease total logistics cost
  • Alleviate traffic congestion along the road,
  • Reduce pollution
  • The important task under current development
    project
  • road and waterway
  • ICD
  • Proposed Lumba-Lumba project

7
ICD Project
  • Muara ( 100 Completed)
  • Sg Tujuh (Under construction)
  • Kuala Lurah ( Completion by January 2010)

8
Muara Container Terminal
9
Project Infrastructure / Services
  • New International MCT Operator
  • Contract awarded to ICTSI to operate and maintain
    MCT
  • Operating since 21 May 2009
  • Increased productivity and efficiency

10
Computerized System (ePort)
11
Project Infrastructure / Services
  • e-PORT
  • Computerised system to manage port operations.
  • Signed on 21 May 2008.
  • Trial run in December 2009
  • Go-Live by first quarter, 2010

12
Value Added Services
13
Project Infrastructure / Services
  • Bunkering
  • Signed 12 Dec 2008
  • Value-added service
  • for incoming vessels

14
New Facilities/Services
15
Project Infrastructure / Services
  • Passenger Ferry Operation since 17 Oct 08
  • Provide connectivity between Brunei and Malaysia.
  • Facilities
  • Ticketing Booths
  • Lounge
  • Shops
  • Tourist Information
  • Counter

16
Project Infrastructure / Services
  • Car Ferry Operation end of 2009
  • Connectivity to Labuan and Menumbok, Malaysia.
  • Status
  • Completed construction in 2008.
  • 2 Coordination Meetings has been held
  • To hold another Coordination Meeting in January
    2010.

17
Project Infrastructure / Services
  • Passenger Jetty for Bangar, Temburong
  • Foundation Laying 18 April 2009
  • Status Completion by Jan 2010
  • Objective To provide better facilities for
    domestic passengers and cargo transportation.

18
Project Infrastructure / Services
  • Cruise ship center (Currently serve between 2-4
    cruise ship a month before end of 2009)

19
Cruise Liners
  • 2008
  • FUNCHAL
  • COSTA ALLEGRA
  • SILVER WHISPER
  • PACIFIC SUN
  • C. COLUMBUS
  • CRYSTAL SERENITY
  • AMSTERDAM
  • 2009
  • COSTA CLASSICA
  • DAWN PRINCESS
  • AIDAcara
  • MV SEABORNE ODYSSEY
  • SEVEN SEAS VOYAGER
  • M/S ASTOR
  • COSTA ALLEGRA
  • DELPHIN VOYAGER
  • C COLUMBUS
  • ARION
  • SUN PRINCESS
  • COSTA ROMANTICA

20
Number of Cruise Ships
21
Projected Growth
  • Cruise Vessels in 2010 26 vessels

22
Project Activities
  • New Website
  • Information Dissemination
  • Daily Updated Shipping Ferry Schedule
  • Latest Cruise Schedule
  • Tender Information

23
Project Activities
  • SAFETY CAMPAIGN (Launched 12 Dec 08)
  • ISPS Code (Continuous auditing)

24
Future Development
Pulau Muara Besar
Source BEDB
25
Source BEDB
26
Pulau Muara Besar Development
  • Project Information
  • Led by Board of Economic Development Brunei
    (BEDB)
  • Status Consultants works completion by October
    2009

27
Pulau Muara Besar Development
Existing Channel
Phase 1
Reclaimed Land
3km
Source BEDB
6km
28
  • Halal Food Distribution Hub
  • Logistics companies
  • Warehousing

Developing PMB
Source BEDB
PHASE 2 BEYOND
PHASE 1
Export Processing Zone
Petrochemical, Oil Refinery and other downstream
export industries
PUALA MUARA BESAR
  • Quay length- 700 m straight line
  • Water depth- min 6m draft
  • Capacity- 800,000 TEUs

6km
29
  • Thank You
  • Further Information
  • Email info_at_ports.gov.bn
  • Website http//www.ports.gov.bn
  • Marsalinawati Hj Omarali (Lisa)
  • Email marsalinawati.omarali_at_ports.gov.bn
  • lisa.omarali_at_gmail.com
Write a Comment
User Comments (0)
About PowerShow.com