Title: Demolition 29 CFR 1926, Subpart T


1
Demolition29 CFR 1926, Subpart T
2
Overview of the OSHA regulation
  • Preparations
  • Pre-job survey
  • By competent person
  • Determine structural integrity
  • Have evidence in writing

1a
3
Overview of the OSHA regulation
  • Preparations
  • All utilities shut off
  • Needed utilities relocated to temporary hook-up
  • Identify hazards guard (glass)
  • Cover all floor openings not to be used

1a
4
Stairs, Passageways, Ladders
  • Close those not to be used
  • Maintain only those for access
  • Proper illumination needed

2a
5
Chutes
  • No dropping of materials outside the building w/o
    protection (chute)
  • Totally enclose chutes 45 degrees greater
  • End of chute guarded

2b
6
Masonry Removal
  • Do not overload floors with materials from other
    floors or components
  • Totally enclose chutes 45 degrees greater
  • Safe access to scaffolds walkways required

2b
7
Floor Removal
  • Provide adequate work surfaces for employees
  • Minimum 2X10 (undressed) planks
  • Openings less than 16

3a
8
Using Equipment for Removal
  • Check structures ability to support load
  • Provide curbs to prevent driving over edge
  • Meet all aspects of Subparts N O

3b
9
Storage
  • Debris on floors must not exceed allowable floor
    loads

3c
10
Mechanical Demolition
  • Keep employees out of work area
  • Remove heavy building attachments prior to demo
  • Cut steel prior to pulling over
  • Competent person must oversee job

3d