Production Preparation Process - PowerPoint PPT Presentation

About This Presentation
Title:

Production Preparation Process

Description:

Production Preparation Process The SMS Technologies Quality Management System includes: ISO 9001, AS9100, ISO 13485, and ISO/TS 16949 They All Include Product Realization – PowerPoint PPT presentation

Number of Views:1168
Avg rating:3.0/5.0
Slides: 18
Provided by: KennyH8
Learn more at: http://seaonline.org
Category:

less

Transcript and Presenter's Notes

Title: Production Preparation Process


1
Production Preparation Process
  • The SMS Technologies Quality Management System
    includes
  • ISO 9001, AS9100, ISO 13485, and ISO/TS 16949
  • They All Include Product Realization
  • Advanced Product Quality Planning
  • Production Preparation Process
  • Production Part Approval process

2
APQP, Flow Charting, Process FMEA, Control Plan,
3-P PPAP
  • APQP Advanced Product Quality Planning
  • Build 1st-time Quality into the Production
    Process
  • FMEA Failure Mode Effects Analysis
  • Minimize Risk (DFM, DFT Mistake-Proofing)
  • 3-P Production Preparation Process
  • Build to Customer Demand Beginning at Launch
  • PPAP Production Part Approval Process

3
(No Transcript)
4
PRODUCT QUALITY PLANNING TIMING CHART
CONCEPT INITIATION/ APPROVAL
PROGRAM APPROVAL
PROTOTYPE PILOT
LAUNCH
PLANNING
PLANNING
PRODUCT DESIGN AND DEV.
PROCESS DESIGN AND DEVELOPMENT
PRODUCT PROCESS VALIDATION
PRODUCTION
FEEDBACK ASSESSMENT AND CORRECTIVE ACTION
Planning INPUTS Planning OUTPUTS
Product Design Dev. INPUTS Product Design
Dev. OUTPUTS
Process Design Dev. INPUTS Process Design
Dev. OUTPUTS
Product Process Validation INPUTS
Product Process Validation OUTPUTS
Production INPUTS Production OUTPUTS
5
SEI Process Flow Diagram
6
Process Failure Mode Effects Analysis
7
Proto-type, Pre-launch Production Control Plans
8
Operator Work Instructions
Work Instructions with applicable drawings, etc.
are developed for each material transformation
9
The Key Linkages for Customer Special
Characteristics
Process Flow Chart FMEAs
Control Plans Operator
Instructions PPAP
Core Tools Applications
10
Defining Balancing The Cell
11
Calculating Takt Time
  • Total Shift Hours 8 X 60 min. X 60 sec.
    28,800 seconds
  • -2 - 15-minute breaks X 30 min. X 60 sec. 1,800
    seconds
  • -Start-up Shut-down 15 min. X 60 sec. 900
    seconds
  • Available Work Time 26,100 seconds

Takt Time Available Work Time / Customer Demand
(units) TAKT TIME 26,100 Seconds / 50 Units
522 Seconds TAKT TIME 522 Seconds / 60 8.7
Minutes Build a cell that will produce one unit
every 8.7 minutes!
12
Defining Balancing The Cell
13
Defining Balancing The Cell
  • Until learning curves been achieved, work
    portions are allowed to vary slightly around the
    takt time until conducting further studies

14
Preliminary SEI Cell Floor Layout
15
Varying The Cell Volume
  • Scaling Volume by Adding Shifts

16
(No Transcript)
17
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com