Cressington 208 HR Sputter coater - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Cressington 208 HR Sputter coater

Description:

Check to see if the Argon tank (bottle) main valve is on. ... The shutter is used for deposition onto thermally sensitive samples. 08/18/06. mgbersch ... – PowerPoint PPT presentation

Number of Views:396
Avg rating:3.0/5.0
Slides: 23
Provided by: mikeb118
Category:

less

Transcript and Presenter's Notes

Title: Cressington 208 HR Sputter coater


1
Cressington 208 HRSputter coater
2
Overview
3
Argon On
  • Check to see if the Argon tank (bottle) main
    valve is on.
  • Do NOT turn the pressure adjust needle valve on
    the regulator.

4
Argon On Number 2
  • Normally the specimen chamber is left under
    vacuum.
  • Open the inline valve on the argon line. This
    will vent the chamber. Give it a few seconds.

5
Open Sample Chamber
  • Open chamber by lifting the Target Assembly. Do
    not place your fingers on the target.

6
Remove Glass Jar
  • To load samples, remove the glass cylinder and
    place it on clean aluminum foil.

7
Place samples in chamber
  • The stage has a various holders for the different
    types of samples stubs
  • Load samples on stage.

8
Close Chamber
  • Replace the glass jar making sure that the
    o-ring is clean.
  • Close Chamber top (target assembly) making sure
    that the top is seated properly on the glass jar.
  • DO NOT DROP THE TARGET ASSEMBLY, lift slightly
    and pull gently outward to fit top on jar.

9
Power Up
  • Flip the POWER toggle switch.
  • The unit will start up in the AUTO mode.

10
Move Shutter
  • Move the shutter out of the way.
  • The shutter is used for deposition onto thermally
    sensitive samples.

11
Presets for AUTO Mode - 1
  • Preset the deposition time by pressing the
    PAUSE/TEST button and adjusting the SET buttons
    in the TIMER/current area.

12
Presets for AUTO Mode - 2
  • Preset the plasma current by pressing the SETma
    button and adjusting the SET buttons in the
    TIMER/current area.

13
Starting the Sputter Cycle
  • Press the CYCLE/STOP button in the AUTO area
  • This will start the sputter cycle.

14
What does the Cycle Do?
  • The Cycle mode will then
  • Pump the chamber to 0.05 mbar
  • Open argon flush then close
  • Pump to 0.15 mbar
  • Open argon flush then close
  • Open leak valve
  • Pump to 0.15 mbar
  • Switch on HV
  • Sputter at preselected current for preselected
    time/thickness

15
Remove samples
  • Lift the Target assembly.
  • CAREFUL the glass jar may stick to the top
    O-ring. HOLD THE GLASS while lifting the target
    assembly.
  • Remove samples

16
Shutdown
  • Replace glass jar
  • Close lid (target assembly)
  • Close inline valve on argon line
  • Turn on Power and let chamber pump for a minute.
  • Turn off Power
  • Close Valve on top of Argon Bottle.

17
Film Thickness Monitor (FTM)
  • Coatings can also be deposited using the FTM.
  • Density and Tooling factors currently in memory
    can be displayed by pressing the relevant button.

18
FTM - 2
  • To adjust a value, hold the button for 2 seconds
    until the period begins to flash. Scroll up or
    down with the arrow buttons.
  • Zero resets the display to zero after a
    measurement

19
FTM - 3
  • To display the current FTM termination thickness,
    press TERMINATOR and hold for two seconds. To
    adjust use the arrow buttons.

20
FTM Target Density
21
FTM - Tooling Factor
22
Other
  • Cressington has a number of options.
  • Multi targets
  • Different size jars.
  • Check with CAF personnel before using these.
Write a Comment
User Comments (0)
About PowerShow.com