Landfill Site Selection - PowerPoint PPT Presentation

1 / 27
About This Presentation
Title:

Landfill Site Selection

Description:

Examined for recreation sites ,sport fields ,parking areas ... Stages of a Landfill Sitting Process. Define project and its needs ... – PowerPoint PPT presentation

Number of Views:481
Avg rating:3.0/5.0
Slides: 28
Provided by: jm15
Category:

less

Transcript and Presenter's Notes

Title: Landfill Site Selection


1
Landfill Site Selection
2
Importance of Site Selection
  • Minimize the future impact on public health.
  • Reduction of the cost of
  • Design and Construction
  • Operation
  • Maintenance
  • Recovery of potential leachate releases.

3
Consideration Factors
  • Haul Distance
  • Location Restrictions
  • Available Land Area
  • Site Access
  • Soil Conditions and Topography
  • Climatologic Conditions
  • Surface Water Hydrology

4
.Consideration Factors
  • Geologic and Hydrologic Conditions
  • Local Environment Conditions
  • Ultimate Use for Completed Landfills

5
Haul Distance
  • Minimize the haul distance
  • Environmental and political concerns

6
Location Restrictions
  • Airport Safety
  • Floodplains
  • Wetlands
  • Fault Areas
  • Seismic Impact Zones
  • Unstable Areas

7
Airport Safety
  • Siting limitation
  • 10,000 feet turbojet aircraft airports
  • 5,000 feet piston-type aircraft airports

8
Floodplains
  • 100-year flood plain

9
Wetlands
  • No practical alternative
  • No violations of other state and local laws
  • Landfill will not cause significant degradation
    of the wetland
  • Minimize potential negative impacts

10
Fault Areas
  • Landfills can not be sited within 200 feet of a
    fault.

11
Seismic Impact Zones
12
Unstable Areas
  • Landslide prone
  • Karst terrains
  • Undermined areas

13
Available Land Area
For at least 5 year of operation
14
Site Access
15
Soil Conditions and Topography
  • Soil Cover
  • Type of operation
  • Type of Equipment
  • Preparation of the site

16
Climatologic Conditions
umaumauma
17
Surface Water Hydrology
  • Natural drainage and runoff characteristics
  • Flooding problems ,limit of 100 years flood
  • Divert runoff from lakes and streams
  • Measure storm runoff into landfill

18
Geologic and Hydrologic Conditions
umaumauma
19
Local Environment Conditions
  • Recommended to built near residential and
    industrial developments
  • Presently ,built in remote locations (to
    minimize impact of filling operations)

20
Ultimate Use for Completed Landfills
  • A capped ,decommissioned landfill can be used for
    other purpose
  • Examined for recreation sites ,sport fields
    ,parking areas
  • During design ,layout and operation the end use
    should be considered
  • For municipal function ,landscaping and planting
    program should be initiated.

21
Stages of a Landfill Sitting Process
  • Define project and its needs
  • Identify major environmental factors
  • Identify candidate sites
  • Collect and analyze environmental, economic, and
    socioeconomic data
  • Evaluate candidates sites
  • Screen candidate sites to a small number
  • Collect and assess site-specific engineering and
    environmental data

22
Stages of a Landfill Sitting Process
  • Recommend one or more sites for final selection
  • Determine final location

23
Factors to consider
24
Numerical procedure
25
Numerical procedure
26
Numerical procedure
27
Example
Write a Comment
User Comments (0)
About PowerShow.com