PQI Project Quality Index - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

PQI Project Quality Index

Description:

Started in December 1999. Field tested and revised in 2000 ... Gasket Installation & Bolt Torquing (Piping) 3.9. Scoring Criteria. Document Submittals: ... – PowerPoint PPT presentation

Number of Views:2469
Avg rating:3.0/5.0
Slides: 24
Provided by: PM887
Category:
Tags: pqi | gasket | index | project | quality

less

Transcript and Presenter's Notes

Title: PQI Project Quality Index


1
PQIProject Quality Index
  • November, 2003
  • Presented by
  • H.J. Stockenberger

2
Objectives
  • Background History
  • Overview Structure
  • Scoring Criteria
  • Implementation
  • Conclusion

3
Background History
  • Started in December 1999
  • Field tested and revised in 2000
  • Implemented in April 2001
  • Project Size gt 2 million
  • Currently more than 60 projects
  • Subjective scoring criteria
  • Not focused on quality of the Work
  • Not Focused on Prevention

4
Overview and Structure
  • Design Procurement Quality Index
  • Construction Quality Index
  • Monthly Summary of Quality Index

5
Overview and Structure
  • PQI Summary reflects scores for
  • Documentation Submittal
  • Quality System Implementation
  • Quality of Material Construction Work
  • 40/60 weighting for Procurement/Construction

6
Overview and Structure
  • Procurement Summary

7
Overview and Structure
  • Construction Summary

8
Overview and Structure
  • Document submittal - Procurement

9
Overview and Structure
  • Quality System Implementation - Procurement

10
Overview and Structure
  • Quality of Material

11
Overview and Structure
  • Document submittal - Construction

12
Overview and Structure
  • Quality System Implementation - Construction

13
Overview and Structure
  • Quality System Implementation Construction
    cont

14
Overview and Structure
  • Quality of Construction Work

15
Overview and Structure
  • Quality of Construction Work cont

16
Scoring Criteria
  • Document Submittals
  • Submitted on time - 2
  • Submitted late 0
  • Quality of Document Submittals
  • Accepted - 4
  • Accepted with comments - 3
  • Conditional Approval - 2
  • Correct and resubmit - 1
  • Not reviewed, incomplete - 0

17
Scoring Criteria cont
  • Always complies - 4 (gt91-100)
  • Mostly complies - 3 (gt61-90)
  • Frequently complies - 2 (gt41-60)
  • Occasionally complies - 1 (gt11-40)
  • Seldom or never complies - 0 (0-10)

18
Scoring Criteria cont
  • As Scheduled - 4
  • Within one Week - 3
  • Within two Weeks - 2
  • Within three weeks - 1
  • More than three weeks late - 0

19
Scoring Criteria cont
  • No Repeat Violation - 4
  • 1 Repeat Violation - 3
  • 2 Repeat Violations - 2
  • 3 Repeat Violations - 1
  • More than 3 Repeat Violations - 0

20
Scoring Criteria cont
  • No violations - 4
  • Violations corrected during inspection - 3
  • Re-inspection required - 2
  • Aramco NCR - 1
  • Repeat NCR - 0

21
Implementation
  • Score criteria based on past months activities
  • Review scoring with PMT and contractor
  • Provide explanation for low scores (less than 3)
  • Submit to Dhahran as instructed

22
Conclusion
  • Focus on prevention and quality of work
  • Results are quantifiable
  • Objective measure of project quality

23
  • Thank you