Title: Integrated%20Cable%20Management%20Systems
1Integrated Cable Management Systems
2Crosstrack a Totally New Concept
3Efficient, Cost Effective
4Integrated Access Flooring
5Integrated Access Flooring
Load bearing deck fastened at 6 points to
base
Premium flooring grade deck printed to
identify cable ducts
Exceeds AS 1170.1 by 492.5 kPa
Accommodates flush-with- floor outlet boxes
6Integrated Access Flooring
Load bearing deck fastened at 6 points to
base
Premium flooring grade deck printed to
identify cable ducts
Exceeds AS 1170.1 by 492.5 kPa
Accommodates flush-with- floor outlet boxes
7Integrated Access Flooring
Load bearing deck fastened at 6 points to
base
Premium flooring grade deck printed to
identify cable ducts
Exceeds AS 1170.1 by 492.5 kPa
Accommodates flush-with- floor outlet boxes
8Integrated Access Flooring
Load bearing deck fastened at 6 points to
base
Premium flooring grade deck printed to
identify cable ducts
Exceeds AS 1170.1 by 492.5 kPa
Accommodates flush-with- floor outlet boxes
9Integrated Access Flooring
Load bearing deck fastened at 6 points to
base
Premium flooring grade deck printed to
identify cable ducts
Exceeds AS 1170.1 by 492.5 kPa
Accommodates flush-with- floor outlet boxes
10Integrated Access Flooring
- Moulded polypropylene base fixed to slab
at 16 points
Power and telecommunications run
lengthways and crossways
Automatically self levels on uneven slabs
No crossover bridges, metal conduits or
separate cable trays
Each service separated by at least 50mm -
no electromagnetic interference
Wiring can be grouped and secured at regular
intervals
11Integrated Access Flooring
- Moulded polypropylene base fixed to slab
at 16 points
Power and telecommunications run
lengthways and crossways
Automatically self levels on uneven slabs
No crossover bridges, metal conduits or
separate cable trays
Each service separated by at least 50mm -
no electromagnetic interference
Wiring can be grouped and secured at regular
intervals
12Integrated Access Flooring
- Moulded polypropylene base fixed to slab
at 16 points
Power and telecommunications run
lengthways and crossways
Automatically self levels on uneven slabs
No crossover bridges, metal conduits or
separate cable trays
Each service separated by at least 50mm -
no electromagnetic interference
Wiring can be grouped and secured at regular
intervals
13Integrated Access Flooring
- Moulded polypropylene base fixed to slab
at 16 points
Power and telecommunications run
lengthways and crossways
Automatically self levels on uneven slabs
No crossover bridges, metal conduits or
separate cable trays
Each service separated by at least 50mm -
no electromagnetic interference
Wiring can be grouped and secured at regular
intervals
14Integrated Access Flooring
- Moulded polypropylene base fixed to slab
at 16 points
Power and telecommunications run
lengthways and crossways
Automatically self levels on uneven slabs
No crossover bridges, metal conduits or
separate cable trays
Each service separated by at least 50mm -
no electromagnetic interference
Wiring can be grouped and secured at regular
intervals
15Integrated Access Flooring
- Moulded polypropylene base fixed to slab
at 16 points
Power and telecommunications run
lengthways and crossways
Automatically self levels on uneven slabs
No crossover bridges, metal conduits or
separate cable trays
Each service separated by at least 50mm -
no electromagnetic interference
Wiring can be grouped and secured at regular
intervals
16Integrated Access Flooring
- Moulded polypropylene base fixed to slab
at 16 points
Power and telecommunications run
lengthways and crossways
Automatically self levels on uneven slabs
No crossover bridges, metal conduits or
separate cable trays
Each service separated by at least 50mm -
no electromagnetic interference
Wiring can be grouped and secured at regular
intervals
17Crosstrack has Delivered for Over 200
Organisations
- An easy to install, rock-solid and level load
bearing floor - Cost efficient to lay at 300m2 in a day
- A more quiet, comfortable and stable floor than
pedestal type complete with an integrated,
flexible cable management system for current
and future needs - Maintenance-free for the life of the building
18Crosstrack has Delivered for Over 200
Organisations
- An easy to install, rock-solid and level load
bearing floor - Cost efficient to lay at 300m2 in a day
- A more quiet, comfortable and stable floor than
pedestal type complete with an integrated,
flexible cable management system for current
and future needs - Maintenance-free for the life of the building
19Crosstrack has Delivered for Over 200
Organisations
- An easy to install, rock-solid and level load
bearing floor - Cost efficient to lay at 300m2 in a day
- A more quiet, comfortable and stable floor than
pedestal type complete with an integrated,
flexible cable management system for current
and future needs - Maintenance-free for the life of the building
20Crosstrack has Delivered for Over 200
Organisations
- An easy to install, rock-solid and level load
bearing floor - Cost efficient to lay at 300m2 in a day
- A more quiet, comfortable and stable floor than
pedestal type complete with an integrated,
flexible cable management system for current
and future needs - Maintenance-free for the life of the building
21Crosstrack has Delivered for Over 200
Organisations
- An easy to install, rock-solid and level load
bearing floor - Cost efficient to lay at 300m2 in a day
- A more quiet, comfortable and stable floor than
pedestal type complete with an integrated,
flexible cable management system for current
and future needs - Maintenance-free for the life of the building
22Crosstrack has Delivered for Over 200
Organisations
- Continuous cabling with partition walls on top
- Conforming to national wiring codes and
telecommunications cabling standards - Minimum down time through easy-access cable
alterations or upgrades/refits - A system warranted for 15 years - longer than
any competitor
23Crosstrack has Delivered for Over 200
Organisations
- Continuous cabling with partition walls on top
- Conforming to national wiring codes and
telecommunications cabling standards - Minimum down time through easy-access cable
alterations or upgrades/refits - A system warranted for 15 years - longer than
any competitor
24Crosstrack has Delivered for Over 200
Organisations
- Continuous cabling with partition walls on top
- Conforming to national wiring codes and
telecommunications cabling standards - Minimum down time through easy-access cable
alterations or upgrades/refits - A system warranted for 15 years - longer than
any competitor
25Crosstrack has Delivered for Over 200
Organisations
- Continuous cabling with partition walls on top
- Conforming to national wiring codes and
telecommunications cabling standards - Minimum down time through easy-access cable
alterations or upgrades/refits - A system warranted for 15 years - longer than
any competitor
26Crosstrack has Delivered for Over 200
Organisations
- Continuous cabling with partition walls on top
- Conforming to national wiring codes and
telecommunications cabling standards - Minimum down time through easy-access cable
alterations or upgrades/refits - A system warranted for 15 years - longer than
any competitor
27Leading Technology Companies and Specifiers
Endorse Crosstrack
"...we thought hard about issues such as cable
capacity, but we're very pleased, Crosstrack
handled all the cable we'd ever want to run."
Peter O'Keefe Technical Services
Manager Australian Defence Force Academy
28Leading Technology Companies and Specifiers
Endorse Crosstrack
"We switched to Crosstrack because our previous
access floor couldn't handle all the cables we
needed, but Crosstrack can, and switching was the
best decision we ever made."
Godfrey Gamble Building and Security Services
Apple Computer Australia
29Leading Technology Companies and Specifiers
Endorse Crosstrack
"Cable management will continue to be an issue in
the foreseeable future. Crosstrack's solution is
simple and elegant with the cable trays, supports
and covers integrated in one compact unit."
James Calder Principal, Strategic Facilities
Planning Woods Bagot Architects Australia
30Leading Technology Companies and Specifiers
Endorse Crosstrack
"The use of this flooring has saved many
thousands of dollars and significant disruption
to the store."
Michael Phillips Project Director Dick Smith
Electronics Powerhouse Stores
31Leading Technology Companies and Specifiers
Endorse Crosstrack
32Crosstrack is Ideal for Refurbishments Including
Heritage Projects
33Crosstracks Patented Design
34Crosstracks Patented Design
35Crosstrack Delivers Economically
- 85 per square metre fully installed
- 1 - 2 of total project cost
- Maintenance-free for the life of the building
- Earlier project completion
- Earlier letting/occupancy
- Higher occupancy ratio
- Reduced turnover of tenants
36Crosstrack Delivers Economically
- 85 per square metre fully installed
- 1 - 2 of total project cost
- Maintenance-free for the life of the building
- Earlier project completion
- Earlier letting/occupancy
- Higher occupancy ratio
- Reduced turnover of tenants
37Crosstrack Delivers Economically
- 85 per square metre fully installed
- 1 - 2 of total project cost
- Maintenance-free for the life of the building
- Earlier project completion
- Earlier letting/occupancy
- Higher occupancy ratio
- Reduced turnover of tenants
38Crosstrack Delivers Economically
- 85 per square metre fully installed
- 1 - 2 of total project cost
- Maintenance-free for the life of the building
- Earlier project completion
- Earlier letting/occupancy
- Higher occupancy ratio
- Reduced turnover of tenants
39Crosstrack Delivers Economically
- 85 per square metre fully installed
- 1 - 2 of total project cost
- Maintenance-free for the life of the building
- Earlier project completion
- Earlier letting/occupancy
- Higher occupancy ratio
- Reduced turnover of tenants
40Crosstrack Delivers Economically
- 85 per square metre fully installed
- 1 - 2 of total project cost
- Maintenance-free for the life of the building
- Earlier project completion
- Earlier letting/occupancy
- Higher occupancy ratio
- Reduced turnover of tenants
41Crosstrack Delivers Economically
- 85 per square metre fully installed
- 1 - 2 of total project cost
- Maintenance-free for the life of the building
- Earlier project completion
- Earlier letting/occupancy
- Higher occupancy ratio
- Reduced turnover of tenants
42Crosstrack Delivers Economically
- 85 per square metre fully installed
- 1 - 2 of total project cost
- Maintenance-free for the life of the building
- Earlier project completion
- Earlier letting/occupancy
- Higher occupancy ratio
- Reduced turnover of tenants
43Crosstrack Delivers Now and in the Future
- Provides protection for both copper and fibre
- Separates power and data, provides right angle
crossovers - Continuous support with no stretching and bend
radius controlled - Copes easily with minor/major recabling as well
as churn and upgrades - Trend towards more, smaller and dispersed cables
- The arrival of category 5e, 6 and 7 and lack of
bandwidth of wireless LANs will make cable
management critical in the future
44Crosstrack Delivers Now and in the Future
- Provides protection for both copper and fibre
- Separates power and data, provides right angle
crossovers - Continuous support with no stretching and bend
radius controlled - Copes easily with minor/major recabling as well
as churn and upgrades - Trend towards more, smaller and dispersed cables
- The arrival of category 5e, 6 and 7 and lack of
bandwidth of wireless LANs will make cable
management critical in the future
45Crosstrack Delivers Now and in the Future
- Provides protection for both copper and fibre
- Separates power and data, provides right angle
crossovers - Continuous support with no stretching and bend
radius controlled - Copes easily with minor/major recabling as well
as churn and upgrades - Trend towards more, smaller and dispersed cables
- The arrival of category 5e, 6 and 7 and lack of
bandwidth of wireless LANs will make cable
management critical in the future
46Crosstrack Delivers Now and in the Future
- Provides protection for both copper and fibre
- Separates power and data, provides right angle
crossovers - Continuous support with no stretching and bend
radius controlled - Copes easily with minor/major recabling as well
as churn and upgrades - Trend towards more, smaller and dispersed cables
- The arrival of category 5e, 6 and 7 and lack of
bandwidth of wireless LANs will make cable
management critical in the future
47Crosstrack Delivers Now and in the Future
- Provides protection for both copper and fibre
- Separates power and data, provides right angle
crossovers - Continuous support with no stretching and bend
radius controlled - Copes easily with minor/major recabling as well
as churn and upgrades - Trend towards more, smaller and dispersed cables
- The arrival of category 5e, 6 and 7 and lack of
bandwidth of wireless LANs will make cable
management critical in the future
48Crosstrack Delivers Now and in the Future
- Provides protection for both copper and fibre
- Separates power and data, provides right angle
crossovers - Continuous support with no stretching and bend
radius controlled - Copes easily with minor/major recabling as well
as churn and upgrades - Trend towards more, smaller and dispersed cables
- The arrival of category 5e, 6 and 7 and lack of
bandwidth of wireless LANs will make cable
management critical in the future
49Crosstrack Delivers Now and in the Future
- Provides protection for both copper and fibre
- Separates power and data, provides right angle
crossovers - Continuous support with no stretching and bend
radius controlled - Copes easily with minor/major recabling as well
as churn and upgrades - Trend towards more, smaller and dispersed cables
- The arrival of category 5e, 6 and 7 and lack of
bandwidth of wireless LANs will make cable
management critical in the future
50Crosstrack Delivers on all Cable Management
Criteria
- Physical performance
- Cabling functionality
- Flexibility
- The only system which ensures all cabling
complies with current regulations, codes and
standards
51Crosstrack Delivers on all Cable Management
Criteria
- Physical performance
- Cabling functionality
- Flexibility
- The only system which ensures all cabling
complies with current regulations, codes and
standards
52Crosstrack Delivers on all Cable Management
Criteria
- Physical performance
- Cabling functionality
- Flexibility
- The only system which ensures all cabling
complies with current regulations, codes and
standards
53Crosstrack Delivers on all Cable Management
Criteria
- Physical performance
- Cabling functionality
- Flexibility
- The only system which ensures all cabling
complies with current regulations, codes and
standards
54Crosstrack Delivers on all Cable Management
Criteria
- Physical performance
- Cabling functionality
- Flexibility
- The only system which ensures all cabling
complies with current regulations, codes and
standards
55Crosstrack Designed and Manufactured in Australia
56Committed to Best Practice Environmental Standards
- Crosstrack provides high quality products within
an environmentally responsible framework - Crosstrack only incorporates renewable materials
- Crosstrack will only accept materials from
suppliers that have a meaningful
environmental policy and waste recycling
program
57Committed to Best Practice Environmental Standards
- Crosstrack provides high quality products within
an environmentally responsible framework - Crosstrack only incorporates renewable materials
- Crosstrack will only accept materials from
suppliers that have a meaningful
environmental policy and waste recycling
program
58Committed to Best Practice Environmental Standards
- Crosstrack provides high quality products within
an environmentally responsible framework - Crosstrack only incorporates renewable materials
- Crosstrack will only accept materials from
suppliers that have a meaningful
environmental policy and waste recycling
program
59Committed to Best Practice Environmental Standards
- Crosstrack provides high quality products within
an environmentally responsible framework - Crosstrack only incorporates renewable materials
- Crosstrack will only accept materials from
suppliers that have a meaningful
environmental policy and waste recycling
program
60Integrated Cable Management Systems