Grid-enabling the Australian Synchrotron - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Grid-enabling the Australian Synchrotron

Description:

Title: No Slide Title Author: M A Sargent Last modified by: Staff Created Date: 2/22/2005 2:13:09 AM Document presentation format: On-screen Show Company – PowerPoint PPT presentation

Number of Views:89
Avg rating:3.0/5.0
Slides: 13
Provided by: MASa182
Category:

less

Transcript and Presenter's Notes

Title: Grid-enabling the Australian Synchrotron


1
Grid-enabling the Australian Synchrotron
24 February 2005
2
Project Program
  • Phase 1 (to end January 2005)
  • Specification of grid requirements
  • Consultations with scientists
  • Preparation of discussion paper
  • Phase 2 (to end February 2005)
  • Circulation of discussion paper
  • Consolidation of comments and research
  • Preparation of draft project proposal
  • Phase 3 (to end March 2005)
  • Circulate draft project proposal (by 11 March
    2005)
  • Consult with key stakeholders
  • Conduct forum with key scientists and
    stakeholders
  • Prepare final project report (by 25 March 2005)

3
Key Issues
  • Data security
  • Data management
  • Data linking
  • Data manipulation and visualisation
  • Security, authentication, audit trails
  • Telepresence
  • Remote operations
  • Production class facilities
  • Virtual organisation management

4
Responses to Discussion Paper
  • Generally supportive of discussion paper context
  • Reinforced data security as key issue
  • Reinforced the need to link related data
    (experiment, beamline, etc)
  • Noted not many examples worldwide, although
    similar to Diamond
  • Network security and reliability issues are
    important
  • Remote access and telepresence are key
    facilitating needs

5
Project Scope
  • National Data Structure
  • primary, backup, archive
  • Regional nodes as virtual instruments
  • Secure Data Network
  • Data Grid
  • Semantic Grid

6
National Data Architecture
7
National Data Architecture
8
National Data Architecture
9
Data and Semantic Grid Development
  • Coordinated research and development programme
  • Integration with international activities
  • Involvement of formal and informal networks of
    scientists
  • Phased approach
  • Phase1 Quick runs using available technologies
    with key metadata to facilitate later stages
  • Phase 2 Provide support tools and services for
    data management
  • Phase 3 Develop technologies/techniques for
    semantic grid.

10
Project Costs
  • Data Centre - Capital 5M, Operating 2M/a
  • Regional virtual nodes (each) Capital 0.5M,
    Operating 0.3m/a
  • Data Grid and Semantic Grid Research and
    Development 3M
  • Network and other costs 1M
  • excludes building costs

11
Project Timelines
12
Operational Structure
  • Formal project management structure and processes
  • Formalise operational management of data
Write a Comment
User Comments (0)
About PowerShow.com