A.Montani; Eurorisk-Preview - PowerPoint PPT Presentation

About This Presentation
Title:

A.Montani; Eurorisk-Preview

Description:

PREVIEW in some words (PREVention, Information and Early Warning) A project funded by the European Commission 23 millions of eligible costs, 14 millions granted – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 5
Provided by: Andrea790
Category:

less

Transcript and Presenter's Notes

Title: A.Montani; Eurorisk-Preview


1
PREVIEW in some words(PREVention, Information
and Early Warning)
  • A project funded by the European Commission
  • 23 millions of eligible costs, 14 millions
    granted
  • New information services to help risk management
  • Gathering users needs
  • Using the most advanced research and technology
  • Validation on operational platforms
  • 58 partners from 15 nations
  • Scientists
  • Operators
  • Industrial companies
  • End Users
  • 45 months performance schedule (start on 1 April
    2005) and yearly budget reviews
  • COSMO partners involved DWD, ARPA-SIM, ARPA
    Piedmont, Meteoswiss

2
Windstorms Workpackage(ARPA-SIM activity)
Provision of probabilistic forecasts and
warnings of strong wind events at all time ranges
up to 10 days ahead.
  • Ensemble Forecast inputs
  • Medium-Range (3-10 days)
  • ECMWF
  • ARPA-SIM (COSMO-LEPS) (Days 3-5)
  • Short-Range (1-2 days) multi-model ensemble
    consisting of contributions from
  • Meteo-France - PEACE
  • DWD - SRNWP-PEPS
  • Met.no - TEPS/LAM EPS
  • Met Office - LAMEPS/EPS
  • Post-processing

3
Clone of COSMO-LEPS suite over NW Europe
  • Generation of a new limited-area ensemble
    forecast system for the prediction of wind and
    wind gusts over North-Western Europe.
  • Aim provision of site-specific wind forecasts
    (wind speed, wind direction other variables to
    diagnose wind gust) to be post-processed and
    combined with other products by UK Met. Office.
  • Point forecasts are calculated over 197 stations.
  • Similar configuration as the operational
    COSMO-LEPS (red), but both clustering and
    integration domain are shifted northwards (blue).

Experimental suite started on September
2006. Computer time provided by an ECMWF special
project between ARPA-SIM and UK Met Office.
4
Medium-range plain flood Workpackage(ARPA-SIM
activity)
  • Provision of probabilistic forecasts so as to
    generate ensemble flood forecasts to be compared
    with the deterministic approach for ranges
    between 3 and 10 days.
  • The upper-Danube river basin has been selected as
    pilot river basin and the test period will
    include the large floods of August 2002.
  • EPS COSMO-LEPS (10 members) reruns performed
    for the period 20 July 31 August 2002.
Write a Comment
User Comments (0)
About PowerShow.com