Title: LOW COST SAFETY IMPROVEMENTS
1LOW COST SAFETY IMPROVEMENTS
Practitioner Workshop Exercise C Session 9
2Exercise
- Learning Objectives
- Analyze traffic crash crash and other engineering
information - Select appropriate low cost safety and
engineering Countermeasures
3Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Remedy of Naper Blvd Plank Road Traffic Signal
Northbound Naper Blvd at Plank Road
4Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Remedy of Naper Blvd Plank Road Traffic Signal
Southbound Naper Blvd approaching Plank Road
At 280 feet back from Stop Bar
5Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Remedy of Naper Blvd Plank Road Traffic Signal
MUTCD Requires 460 feet of visibility
At 450 feet back
Southbound Naper Blvd approaching Plank Road
6Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Remedy of Naper Blvd Plank Road Traffic Signal
Southbound Naper Blvd at Ogden Av toward Plank
Road
7Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Remedy of Naper Blvd Plank Road Traffic Signal
- The intersection of Naper Blvd with Plank Road
was improved to traffic signal control in 1985
with the construction of Naper Blvd, a new 4 lane
major arterial connecting south portions of
Naperville, IL to the Illinois Tollway
interchange to the north. - Plank Road is collector street with 5,500 ADT
- Traffic crash experience averaged 15 per year
with 6 to 8 serious injury crashes for the years
1985 thru 1991 - Traffic volumes on Naper Blvd started at 12,000
ADT in 1985 and grew to 28,000 ADT by 1991
8Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Speed limit on Naper Blvd is 40 mph 85th
percentile speeds are 48 mph speed limit on
Plank Road is 35 mph. - Traffic signals were added to the north of this
signal and a closed loop signal system was
installed in late 1991. - Traffic volumes on Naper Blvd started at 12,000
ADT in 1985 and grew to 28,000 ADT by 1991. - Traffic crash experience averaged 15 per year
with 6 to 8 serious injury crashes for the years
1985 thru 1991 - In early 1992, a multi-vehicle crash with
fatalities was followed by two fatal crashes
1993 had 4 fatalities, 9 serious injury crashes
out of a total of 28
9Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Visibility of the signals was a significant
issue southbound traffic could not see the far
side indications until a point 280 feet from the
stop bar visibility of the northbound signals
was slightly better at 350 feet. - Review of the engineering plans identified that
the signal design was for tangent approaches the
actual conditions in the field were a reverse 35
mph 6 degree curve. - Signal heads were far side only with 12
sections and backplates - Review of Clearance Intervals (Yellow and Red)
was carried out for 45 mph approach speeds and
found to be consistent with ITE practice.
10Traffic Signals Exercise XII Naper Blvd and
Plank Road
- What low cost safety countermeasures would you
consider? - What is the safety effect (CRF) for each?
Discussion
11Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Case Study J Remedy of Naper Blvd Plank Road
Traffic Signal
Signal Timing /Coordination and Visibility
Improvement
Additional Supplemental Near-Side Signal
Northbound Naper Blvd at Plank Road
12Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Case Study J Remedy of Naper Blvd Plank Road
Traffic Signal
Signal Timing /Coordination Visibility Improvement
Advance Warning Sign with Yellow Flasher
Southbound Naper Blvd approaching Plank Road
13Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Case Study J Remedy of Naper Blvd Plank Road
Traffic Signal
Signal Timing /Coordination and Visibility
Improvement
Additional Supplemental Near-Side Signal
Southbound Naper Blvd at Plank Road
14Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Case Study J Remedy of Naper Blvd Plank Road
Traffic Signal
Signal Timing /Coordination Visibility Improvement
Additional Supplemental Near-Side Signal
At 450 feet back from Stop Bar
Southbound Naper Blvd approaching Plank Road
15Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Case Study J Remedy of Naper Blvd Plank Road
Traffic Signal
Signal Timing /Coordination Visibility Improvement
Additional Supplemental Near-Side Signal
Southbound Naper Blvd at Ogden Av toward Plank
Road
16Traffic Signals Exercise XII Naper Blvd and
Plank Rd
- Case Study J Remedy of Naper Blvd Plank Road
Traffic Signal
After Crash experience is 8 crashes per year or
less for 1996-2002 with no serious injury or
fatals
Signal Timing /Coordination Visibility Improvement
Advance Warning Sign Be Prepared to Stop with
When Flashing Plaque with Flasher tied to
Controller
Northbound Naper Blvd approaching Plank Road
17Exercise
- Learning Objectives
- Analyzed traffic crash crash and other
engineering information - Selected appropriate low cost safety and
engineering Countermeasures
18Exercise