IBIS Connector Models: Working Group Status - PowerPoint PPT Presentation

About This Presentation
Title:

IBIS Connector Models: Working Group Status

Description:

Title: Staff Overview Subject: HSSD & ASI Author: Joe Gorman Last modified by: Fabrizio Zanella Created Date: 2/19/1998 2:26:24 PM Document presentation format – PowerPoint PPT presentation

Number of Views:91
Avg rating:3.0/5.0
Slides: 7
Provided by: JoeG206
Learn more at: https://ibis.org
Category:

less

Transcript and Presenter's Notes

Title: IBIS Connector Models: Working Group Status


1
IBIS Connector ModelsWorking Group Status
  • Fabrizio Zanella, EMC Corporation

2
IBIS Connector BIRD
  • Group consists of 9 members from 7 companies.
  • Molex, Hyperlynx, Berg, Teradyne, EMC, Ansoft and
    AMP are represented.
  • Good mix of connector companies and software
    vendors.
  • Conference calls 2-3x/months emails.

3
IBIS Connector BIRD
  • Preliminary BIRD is being drafted
  • Connector IBIS model should be a separate
    document from IBIS 3.1, etc.
  • Defined 25 new key words not in IBIS 3.1
    spec
  • Spec is defining single and multiline connector
    models
  • Mated model, backplane and daughtercard half
    matrix models will be included.

4
IBIS Connector BIRD
  • Model can be lumped or distributed.
  • Model can be created from 2D or 3D solver.
  • Model will have several L,C matrix sections.
  • Defined separate model (swath)
  • method of defining small section which is
    repeated throughout the entire connector
  • helps in reducing size of connector model

5
Schematic of Connector Model
6
IBIS Connector BIRD
  • Option of including JPEG file as part of IBIS
    connector model, so user can see picture of
    connector.
  • Looking into how to model T stubs and loops in
    connectors.
  • We are interested in requesting funding from
    IBIS committee for the connector model parser.
  • IBIS connector BIRD will be completed in January
    99.
Write a Comment
User Comments (0)
About PowerShow.com