Bridge Standards Practices
  • Bridge Design Drafting Manual (BDDM)
  • Bridge Drawings
  • Upcoming Bridge Training

2
Overview
  • Links to ODOT Bridge Information
  • BDDM Recent Key Updates
  • Proposing Changes to the Manual
  • Deviations from BDDM
  • Bridge Drawings Start to Finish
  • Bridge Section Training Updates

3
ODOT Bridge On-Line Links
  • Bridge Engineering Home Page
  • http//www.oregon.gov/ODOT/HWY/BRIDGE
  • Bridge Design Drafting Manual (BDDM)
  • Bridge Standard Drawings
  • Use Br. Standards Manuals Link
  • Standard Drawings also via Roadway Engineering
    Home Page

4
Bridge Engineering Home Page
5
Br. Standards Manuals Page
6
ODOT Bridge Example Drawings
  • ftp//ftp.odot.state.or.us/Bridge/BDDM
  • In the Example_Drawings folder
  • Also
  • Cell_Library
  • Bridge_Example_Designs
  • BDDM_Figures

7
BDDM Nov. 2005 Selected Updates
  • 1.1.2.2 Scour Analysis
  • 1.1.7.2(2) Pedestrian Structures Live Load
  • 1.1.7.4 LRFD Ductility, Redundancy and
    Operational Importance Factors
  • 1.1.7.5 Sidewalk Loading New section
  • 1.1.8.4 End Bents Concrete facing on MSE walls
  • 1.1.14.2(1) Stay-in-Place Forms
  • 1.2 Steel Various updates
  • 1.2.1.9 Deck Pouring Sequence

8
To Propose Changes to BDDM
  • Go to Introduction, Revising The Manual, page
    INTRO-5
  • Follow Step-by-Step procedure
  • Not needed for bringing routine errors to our
    attention (typographical, etc.)

9
BDDM Deviation Process
  • When you want to do something differently than
    BDDM policy specifies
  • Send E-mail request to Bridge Standards
    Practices Committee stating what and why
  • Committee will review and respond

10
Deviation vs. Exception
  • Roadway Engineering Design Exception process is
    a more formal request to use geometry, etc. that
    doesnt meet operational standards

11
Bridge Standards Practices Committee
  • Bruce Johnson, State Bridge Engineer
  • Kevin Davidson, Br. Standards Practices Engr.
  • Gary Bowling, Br. Operations Managing Engineer
  • Craig Shike, Concrete
  • Hormoz Seradj, Steel
  • Holly Winston, Seismic Bridge Rails
  • Jan Six, Foundations

12
Create CAD Files Drawings
  • Three Types of CAD Files
  • Layout File
  • Sub-structure File
  • Super-structure File

Layout File
Sub-structure File
Super-structure File
13
Drawings are Reviewed
  • Engineer of record reviews drawings
  • Final Corrections have been made to CAD Files.

14
Mylars are Created
  • D size mylars are printed
  • All parties have signed mylars.
  • 11 x 17 paper prints are made of signed mylars.

15
Plans are sent in
  • D size mylars and 11 x 17 paper copies of
    signed mylars are sent to office of Pre-Letting
    in Salem Headquarters.
  • Office of pre-Letting sends mylars to ODOT
    Reprographics for printing and scanning.

16
Contract Documents Created
  • ODOT Reprographics sends requested material back
    to Office of Pre-Letting and sends Bridge mylars
    and scans to Bridge Engineering Section
    Headquarters, front office.
  • Bridge front office returns signed mylars to
    original design office.
  • Loads scans into the Bridge Data System (BDS).

17
Project is Constructed
18
As-Constructed Drawings
  • Project Manager submits as-constructed comments
    to design office.
  • Engineer of record reviews comments
  • Drafter places as-constructed comments on mylar
    by hand.

19
Distribution of As-Constructed Drawings
  • A set of drawings with as-constructed comments
    are created and distributed to
  • Bridge Operations Engineer
  • Region Bridge Inspector
  • Original red line as-constructed drawings are
    sent back to Project Managers office.

20
At Completion of Project
  • At completion of a project, what information is
    needed by Bridge Engineering Section Headquarters
    in Salem.
  • Electronic CAD files in Microstation Version 8
    format.
  • D size signed mylars
  • Calculation books
  • Project Files
  • Load Rating of as-constructed bridge
  • per Load Rating Guidelines
  • Cost Data

21
Bridge Mylar Flowchart
22
Upcoming ODOT Bridge Section Training
  • Beginning Seismic Design March, April, June
    July, One day a month for 8 hours each month,
    total of 32 hrs.
  • High Performance Steel and Accelerated Bridge
    Construction March 15 16
  • Whats New in Bridge Design May 17 18th
  • LRFD Foundation design Tentative April or May
    2006

23
Questions?