Binder Distributor Accreditation - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Binder Distributor Accreditation

Description:

Binder Distributor Accreditation RPF Resolution May 03 To review the process of binder distributor certification as fit for purpose & investigate scope of a system ... – PowerPoint PPT presentation

Number of Views:85
Avg rating:3.0/5.0
Slides: 11
Provided by: Dum49
Category:

less

Transcript and Presenter's Notes

Title: Binder Distributor Accreditation


1
Binder Distributor Accreditation
2
RPF Resolution May 03
  • To review the process of binder distributor
    certification as fit for purpose investigate
    scope of a system for self regulation

3
Progress to date
  • Draft document compiled to replace TMH 2 to
    ensure that
  • binder distributors are properly calibrated
  • there is a high propability that the correct
    application of binder will occur during spraying

4
Draft Document contents
  • General requirements for binder distributors
  • Calibration requirements at an accredited testing
    facility
  • On-site tests and procedures

5
Outstanding issues
  1. Compliance of test methods (which need to be
    conducted at an accredited facility to obtain a
    Calibration Certificate) to SANAS requirements
  2. Correlation between Fixed pit transverse
    calibration test and the on-site bakkie test

6
Transverse Distribution Tests
  • Fixed pit
  • Bakkie test

7
Bakkie Test(3 nozzles per trough)
8
Way forward
  • Publishing of recommendations
  • Bakkie test method on CSIR website
  • Drafting interim guideline (TG 3) to incorporate
    recommendations until COLTO reactivated
  • Develop computer programme to correlate fix pit
    transverse distribution with Bakkie test
  • Develop on-site carpet test for high profile
  • projects
  • Develop a new frame work for Distributor
  • Calibration

9
Outstanding issues
  1. Compliance of test methods to SANAS requirements
    which needed to be carried out at an accredited
    facility to obtain a Calibration Certificate
  2. Correlation between Fixed pit transverse
    calibration test and the on-site bakkie test
  3. The future role of Provincial Road Authorities
    wrt calibration testing and accreditation of
    Distributors

10
Concluding remark
End
  • The Calibration certificate is no guarantee of
    accurate and uniform spraying quality and on-site
    tests will need to be carried out to improve the
    likelyhood of success.