CE 303: Introduction to Construction - PowerPoint PPT Presentation

About This Presentation
Title:

CE 303: Introduction to Construction

Description:

CE 303: Introduction to Construction Blueprint Lab Objectives Dimension Lines Reading Drawing Scales Architectural Engineering Stationing Line-types and Placement ... – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 17
Provided by: BradS169
Learn more at: https://www.uky.edu
Category:

less

Transcript and Presenter's Notes

Title: CE 303: Introduction to Construction


1
CE 303 Introduction to Construction
  • Blueprint Lab

2
Dimensioning
1 - 8
8 -
4
3
Objectives
  • Dimension Lines
  • Reading Drawing Scales
  • Architectural
  • Engineering
  • Stationing
  • Line-types and Placement
  • Introduction to Quantity Takeoffs

4
Drawing Scale
  • construction projects are drawn to a reduced
    scale
  • scale is defined as
  • architectural scale
  • 1/4 1-0 this means every 1/4 on the drawing
    equals a one foot of actual length on the project
  • 1/8 1-0
  • engineering scale
  • 1 10, or 20 etc.
  • metric scale
  • 150

5
Reading Scales
architectural scale
2
1 inch
4
1 inch
2
2 inches
2 inches
16
6
Reading Scales
architectural scale
20-6
7
Reading Scales
architectural scale
2 - 8½
8
Reading Scales
3-8
architectural scale
5 5/8
9
Reading Scales
engineering scale
10
Reading Scales
metric scale
11
Stationing
  • Dimensioning of an alignment in 100 foot
    intervals.
  • Each 100 ft. is denoted as 100
  • 100 100, 200 200, etc..
  • Known as full stations
  • Intermediate stations are between full stations
    and are known as plus stations.
  • 147 147, 357.24 357.24, etc

12
(No Transcript)
13
Line-types Placement
  • Dimension and Extension Lines.
  • Marking device placed at end of dimension line
  • Arrows, dot, tick
  • Extension lines are drawn perpendicular to
    dimension line to specify features between which
    the dimension applies.

14
Dimension Lines
15
Quantity Takeoffs
  • Quantities derived from drawings
  • Square footage, linear footage, cubic footage
  • List of all materials
  • Requires understanding of geometry (calculations
    from straight lines, curves, angles...)
  • Accurate quantity takeoffs are required for
    detailed cost estimates.
  • Can include labor and equipment costs

16