Title: ATCA Crate / Infrastructure in place
1- ATCA Crate / Infrastructure in place
- Rack in D3 dimension
- Electrical power availability
- Tell1 racks running in D3 (air ventilation,
safety aspect) - Temperatures, power of crates in D3
- Conclusion
2- Rack in D3 dimensions 2m54 x
60 cm x 90 cm - Useful space
- height 56U (2m49) 10U need to be free at the
bottom for cabling and water valve access. - width 19 (48,3cm)
- depth 73cm
- Level1 crates 11U (9U2U Fan) x 19 x 72cm
- ATCA crate (ex ELMA catalogue)
- ? dimensions OK, few mechanical adaptation (26U
instead of 22U used for 2 crates).
3Electrical Power for Frond End racks in
D3 Maximum available 410 kW Consumption
total 70 kW (in Physics mode) ?
No problem with general power (17 of the
capacity used)
4- Electrical power available per rack
- distribution designed for 11 kW/rack max.
- 16 A circuit breakers (Merlin Gerin C60H D16A).
- 7 single phase power outlets available (burndy
connector). - ATCA crate consumption
- ??
- ex. ELMA catalogue Output PSU 2799 watt maxi
- -gt input (80) 3.5 kW maxi 16A
- ? 16A circuit breaker should be Ok (to be check
with the manufacturers)
5- Cooling
- vertical air flow
- mixed water exchanger
- Air temperature inside the rack
- with 2 exchangers 18-19 C
- - Safety aspect (DSS)
- Thermo switch 40 C (increase to 60 C
possible), Smoke detection, CO2 automatic
triggering. - ATCA Crate need to be adapted (by the company?)
to be compatible with vertical air flow. -
- water16 C
6 24 Tell1L1 crates location / 8 racks spare in
D2 Detector Extension row ? enough space Air
Temperature in Rack (Physic mode)
7- Cooling / power dissipated
- Tell1 crate
- Velo 17 Tell12 Hugin power 820 watts / 865
watts in Physics - -gt total 2 crates 1.7kW/rack ( Temp inside
rack 19C ) - Other example TT 16 Tell1 1 Hugin 645 watts
/ 705 watts in Physics - ATCA crate maxi 14 boards x 250W 3.5 kW
- -gttotal 2 crates 7.0 kW
maxi /rack (4 times more !) - Tests done in 2002 by PH electronic group (3
exchangers, 3 crates) - http//cdsweb.cern.ch/record/38031/files/epess-200
3-014.pdf - Conclusion The air-water rack cooling system
developed for LEP and used for the measurements
in this report can cope with a total power
dissipation of the order of 10kW with less than
2 power loss to the surroundings. This
corresponds to a useful power dissipation per
subrack of 2.3kW. In these conditions most of the
electronics is below 40 C -
- ? Cooling in place should be Ok (but 40C
inside?) , maybe a third exchanger need to be
installed, need to be check more in detail, tests
?
total 6.9 kW for 3 crates
8General power summary
Heat removed by water Temp input 16 C Temp
output 0.5 C Flow 60m3/h ? 35kW Heat
lost in room removed by air conditioning
units Air temperature in the rooms 20.5 C
few kW (D3A unit capacity 26kW maximum) (D3B
unit capacity 32 kW maximum) Dissipation in
detector side 30kW ?
Total Electrical power (Level1LVHV) 70 kW
Rack Temp inside 18-19 C
9General power summary
Heat removed by water Temp input 16 C Temp
output 0.5 C Flow 60m3/h ? 35kW (
30-70 kW with ACTA) Heat lost in room removed
by air conditioning units Air temperature in the
rooms 20.5 C few kW (few additional) (D3A
unit capacity 26kW maximum) (D3B unit capacity
32 kW maximum) Dissipation in detector side
30kW ?
Total Electrical power (Level1LVHV) 70 kW
Rack Temp inside 18-19 C
Remove L1 crates -12kW Add ATCA crates
40-80kW ? (depend on boards quantity) ?Total
30-70 kW ? additional
Maxi 105kW need to be removed with water
output 1.5 C (instead of 0.5 C) ? Ok with
general cooling (ex. 4C for PC farm in
Physics mode)
10- CONCLUSION
- ATCA crate 19 dimensions compatible with Rack
used - few mechanical adaptation needed 13U instead
of 11U - General electrical distribution already in place
enough - Maximum breaker in place 16A (but could be
changed if needed) - Crate should be adapted for vertical air cooling
- Heating power to be evacuated per rack 4 times
more / current L1 rack ? need to be check with
more detail (boards quantity/crate) - installation of additional 2U exchanger ?
- General cooling power enough
- Rk cabling arrangement should be also taken into
account early
11 spare slide