THECB Presentation - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

THECB Presentation

Description:

* Goal Create a unified signage system Integrate signage with campus architecture, ... concept for all sign types Finalize ... Sign Types Gateway ... – PowerPoint PPT presentation

Number of Views:104
Avg rating:3.0/5.0
Slides: 13
Provided by: CLam4
Learn more at: https://www.utsa.edu
Category:

less

Transcript and Presenter's Notes

Title: THECB Presentation


1
WAYFINDING
Next Steps
September 29, 2010
Business Affairs Your Partner for Successful
Solutions
2
Background
  • Exterior Signage and Wayfinding Master Plan
  • Developed by Cloud Geshan Associates
  • Delivered Summer 2009
  • Part of the 2009 Campus Master Plan
  • A positive, visible identity that reflects the
    stature of the Institution is vitally important.

3
Goal
  • Create a unified signage system
  • Integrate signage with campus architecture, image
    and landscape
  • Include signage at Main, Downtown, and HemisFair
    Park Campuses

4
Next StepsPhase I
  • Design Development
  • Refine selected concept for all sign types
  • Finalize all functional aspects of the system
  • Cost estimates for fabrication and installation
  • Sign Location Plan and Message Schedule
  • All sign types
  • Naming decisions and terminology
  • Message sequences, destinations and egress routes

5
Next StepsPhase I
  • Construction Documents
  • All sign types
  • Details, structures, materials, finishes and
    typical installations
  • Performance specifications
  • Warranties

6
SchedulePhase I
  • Campus Engagement
  • Small Group and Campus-wide committee
  • CMO
  • Kick-off meetings
  • October 26-28
  • Presentation of signage design, landscape and
    lighting recommendations
  • January 2011

7
SchedulePhase I
  • Develop system and finalize location plan and
    message schedule
  • Complete in March 2011
  • Construction Documents
  • Complete in May 2011

8
ScheduleFuture Phases
  • Future Phases construction and installation
  • Future phases based on funding availability
  • Planning begins January 2011
  • Highest impact first?
  • Be prepared to issue package for first
    construction phase in May 2011

9
Sign Types
  • Gateway signs
  • Vehicular signs
  • Pedestrian signs
  • Building signs
  • Regulatory signs

10
CostsPhase I
  • Professional Fees
  • Cloud Geshan Associates 236,400
  • Subconsultants 171,110
  • Total 407,510
  • PLUS
  • Administrative Fee (10) 40,750
  • Reimbursable Expenses 29,000
  • Total 477,260
  • APPROVED FUNDING 750,000

11
Conceptual Plans
12
A positive, visible identity that reflects the
stature of the Institution is vitally important.
2009 Exterior Signage and Wayfinding Master
Plan Cloud Geshan Associates
Write a Comment
User Comments (0)
About PowerShow.com