TAKING THE CTCB EXAM - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

TAKING THE CTCB EXAM

Description:

taking the ctcb exam by: tom derosa, ctcb & matt strom, ctcb general information and certification policies background information mission statement certification ... – PowerPoint PPT presentation

Number of Views:251
Avg rating:3.0/5.0
Slides: 27
Provided by: TomD87
Category:

less

Transcript and Presenter's Notes

Title: TAKING THE CTCB EXAM


1
TAKING THE CTCB EXAM
  • BY
  • TOM DEROSA, CTCB
  • MATT STROM, CTCB

2
GENERAL INFORMATION AND CERTIFICATION POLICIES
  • BACKGROUND INFORMATION
  • MISSION STATEMENT
  • CERTIFICATION POLICIES
  • REVOCATION OF CERTIFICATION
  • REVIEW AND APPEAL
  • USE OF LOGO
  • REFUND POLICY
  • CONFIDENTIALITY POLICY
  • HARDSHIP POLICY

3
ELIGIBILITY REQUIREMENTS
  • MUST HAVE A MINIMUM OF 3 YEARS OF BROAD-BASED
    EXPERIENCE IN TENNIS COURT CONSTRUCTION
  • FOR INITIAL CERTIFICATION
  • 1. 100 ELIGIBILITY POINTS
  • 2. 50 WITHIN LAST 3 YEARS
  • 3. 50 NO TIME LIMIT(3LIFE)

4
TENNIS ELIGIBILITY SPEADSHEET
  • PROJECT ADMINISTRATION
  • MINIMUM 5 POINTS
  • Prepare bids and proposals - .2 pts per project
  • Prepare/review change orders, owner billings,
    subcontractor billings, job costs - .2 pts per
    project
  • Plan schedule crews, subs and material
    deliveries - .2 pts per project
  • Supervise project - .2 pts per project

5
TENNIS ELIGIBILITY SPEADSHEET
  • SITE, SUB-BASE AND BASE WORK
  • MINIMUM 15 POINTS
  • 1. Identify site issues (soils, drainage,
    obstructions, access) - .5 pts per project
  • 2. General site design (survey, calculate
    elevation and grade, construction staking) - .5
    pts per project
  • 3. Prepare site (excavation, grading slope
    stabilization, drainage, utilities) - .5 pts per
    project
  • 4. Install base (fine grading, sterilant,
    geo-textile, crushed aggregate, paving) - .5 pts
    per project

6
TENNIS ELIGIBILITY SPEADSHEET
  • CONSULT WITH OWNER OR DESIGN PROFESSIONAL
  • MINIMUM 15 POINTS
  • 1. Plan and design a new tennis court project or
    renovation (facilities use issues, dimensions,
    orientation, drawings specifications, samples,
    multiple court batteries, net post location,
    budget, elevation, slope, lighting, fencing)
    1.0 point per project

7
TENNIS ELIGIBILITY SPEADSHEET
  • TENNIS COURT COATINGS, FENCING AND LIGHTING
  • MINIMUM 15 POINTS
  • 1. Install court surface (materials required,
    patching, lines) - .2 pts PER COURT
  • 2. Install tennis court equipment (fencing, net
    posts, lighting, windscreen) .1 point PER COURT

8
TENNIS ELIGIBILITY SPEADSHEET
  • TENNIS COURT MAINTENANCE AND REPAIR
  • MINIMUM 5 POINTS
  • 1. Analyze reasons for failures - .1 point PER
    COURT
  • 2. Recommend products and systems to increase
    life of court - .1 point PER COURT

9
(No Transcript)
10
JOB LIST
  • JOB NUMBER__________
  • Name______________________________
  • Year_____ New Construction__ Repair/Renovation__
  • Contact Name_______________________
  • Phone_______________ E-Mail_________________
  • JOB NUMBER__________
  • Name______________________________
  • Year_____ New Construction__ Repair/Renovation__
  • Contact Name_______________________
  • Phone_______________ E-Mail_________________

11
The Exam
  • When?
  • What to expect?
  • Format
  • Preparation
  • Scoring
  • Sample Questions

12
TENNIS 1. The proper minimum dimension of the
net center strap anchor is? A. 18 x 18 x 18
cube B. 12 in diameter, 12 deep C. 12 x 12
x 12 cube D. 18 in diameter, 36 deep 2. A
customer would like a 2-color layout on his new
standard size single acrylic surface tennis
court. The manufacturer of the 3-coat color
system recommends that the 2 final color coats be
installed at the application rate of .05 gallons
per square yard per coat of undiluted material.
How much job mixed color will be needed for the
completion of the inbound area if the
manufacturer recommends the material be cut with
50 water? A. 23 gallons B. 31 gallons C. 35
gallons D. 47 gallons 3. An owner has a
standard four-court battery (204 x 120) of
asphalt tennis courts that he wants to convert to
fast dry. If the original courts have zero slope
and the fast dry courts are to be installed with
a minimum of 4 of stone on the low side and .28
slope in the 120 direction, how much stone will
be needed to establish the stone base before the
fast dry is applied? (stone density is 150
pounds/cubic foot compacted) A. 605 tons B.
918 tons C. 1144 tons D. 1224 tons
13
TENNIS ANSWERS
  • Question Number 1 B (pg. 94 of manual)
  • Question Number 2 D (36 x 78 / 9 312 s.y.
    at .10 31.2 gallons 1.5 46.8 gallons)
  • Question Number 3 B (204 x 120 24480 s.f.
    .28 slope in 120 equals 4 fall 4 minimum
    thickness on the low side means 8 thickness on
    the high side. Therefore, the average thickness
    is 6. 24480 .5 150 / 2000 918 tons)

14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
A Certified Tennis Builder
  • 3 Year Term
  • Individual / Not Company Certification
  • Use of the ASBA Logo
  • Legal advantage in Bid Documents
  • Personal Pride

18
RE-CERTIFICATION REQUIREMENTS
  • Eligibility Requirements
  • Must be actively engaged in the Industry
  • Must have 50 points in
  • 1. 3 of the 5 areas on Eligibility Form
  • 2. For projects completed in Last 3 years.
  • Re-certify by Exam in lieu of points

19
Re-Certification by Continuing Education
  • Must have 40 points within 3 year period
  • 1. 25 points must be from ASBA related
    activities
  • 2. Industry related articles
  • 3. Presentations / Seminars in Industry related
    programs aimed at owners, end users or interested
    parties.
  • 4. Participating in research in Tennis Courts

20
IF CERTIFICATION EXPIRES
  • Points will NOT be accepted to regain certified
    status except in the case of Hardship
  • 1. Provide written documentation of the Hardship
  • 2. Explain in writing how the hardship prevented
    one from completing the process within the
    published timeframe
  • 3. Pay a fee of 50.00 for extension
  • 4. Must be submitted by Dec. 31st
  • 5. Extension will not be considered if filed
    after Jan. 31st

21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
QUESTIONS
Write a Comment
User Comments (0)
About PowerShow.com