FY 2017-FY 2021 Project Priorities Okaloosa-Walton TPO Gary Kramer Senior Planner, TPO Staff www.wfrpc.org How a Project is Developed Project Priorities are developed ... – PowerPoint PPT presentation

Number of Views:172
Avg rating:3.0/5.0
Slides: 12
Provided by: wfr8
Learn more at: https://files.ecrc.org
Category:

less

Transcript and Presenter's Notes

Title: FY 2017-FY 2021 Project Priorities Okaloosa-Walton TPO


1
FY 2017-FY 2021 Project Priorities
Okaloosa-Walton TPO
  • Gary KramerSenior Planner, TPO Staff
  • www.wfrpc.org

2
How a Project is Developed
3
Background
  • Project Priorities are developed annually.
  • Two public workshops on May 14, 2015.
  • Two TPO and advisory committee workshops (May 19
    and June 19, 2015.
  • Comments received from the workshops are listed
    in the agenda enclosure.

4
Project Priority Methodology
  • Capacity Projects
  • Bicycle/Pedestrian Related Projects

5
Project Priority Methodology
  • Same as last year, TPOs 2035 Long Range
    Transportation Plan. Completed projects are
    removed from the list, projects scheduled for
    construction in first three years are moved to
    the committed list and new projects are placed at
    the end of the priority list.
  • New rankings for Transportation Alternatives
    projects are being ranked by TPO staff based on
    criteria adopted by the TPO in April 2015.
  • New projects for Transportation System
    Managementranked based on TPO approved criteria.

6
Project Priority Methodology
  • Public Transportation Related Projects (listed
    by potential grants and furnished by the TPOs
    public transportation staff in consultation with
    the regions public transportation providers).
  • Aviation Projects (Okaloosa County and DeFuniak
    Springs Airport).

7
Project Priority Methodology
  • Intelligent Transportation System (ITS) projects
    furnished by Okaloosa County ITS contact.
  • Local projects furnished by local governments and
    TPOs 2035 Long Range Transportation Plan
    (LRTP).
  • Bridge replacement projects (furnished by LRTP).

8
Project Priority Sections
  • Capacity Projects (Tables 1-4).
  • Transportation System Management Projects
    (Tables 5-6).
  • Bicycle/Pedestrian Related Projects (Tables
    7-10).
  • Public Transportation Related Projects (Table
    11).
  • Aviation Projects (Tables 12-13).
  • Intelligent Transportation System Projects (Table
    14).
  • Local Projects (Table 15).
  • Bridge Replacement Project (Table 16).

9
Proposed Changes
  • Any changes in Project Priorities requires 2/3
    majority of the voting members present.
  • Table 2 Non-SIS Priority 9 Corridor Management
    Improvement Projects, Project 5 US98 from
    Marler Bridge to Airport Road should be moved to
    Project 1 since this is only plan or study that
    has been completed.

10
Whats Next?
  • Adoption by TPO and advisory committees at this
    meeting
  • Adopted Priorities sent to Florida Department of
    Transportation by August 11, 2015

11
Comments?
  • Gary KramerSenior Transportation Planner
  • Gary.Kramer_at_wfrpc.org
  • (850) 332-7976 Ext. 219 or 1-800-226-8914
  • Brandi WhitehurstPublic Involvement Coordinator
  • Brandi.Whitehurst_at_wfrpc.org
  • (850) 332-7976 Ext. 204 or 1-800-226-8914