Title: Broad SAP Project Approach


1
Broad SAP ProjectApproach Functionality
Implemented
  • 06/23/06

2
Agenda
  • Project Goals
  • Project Scope and Approach
  • Timeline
  • Functionality
  • Master Data Management
  • Planning
  • Procurement
  • Inventory Management
  • Cost Tracking
  • Production
  • Quality Management

3
Project Goals
  • Enable the Broad to be the lowest cost provider
    of genomic sequencing data.
  • Improve Production cost tracking
  • Implement product costing (cost per read)
  • Simplify Purchasing and Financials, including the
    addition of ECAT purchasing
  • Simplify batch creation and inventory management
    processes
  • Improve ease of use for highly repetitive
    transactions
  • Enhance operational performance
  • Improve shop floor tracking of batch numbers to
    enable timely troubleshooting
  • Improve quality management by tying inspections
    results to materials and batches produced
  • Fully integrate with the MIT SAP system, to
    reduce long term IT costs
  • Eliminate a grant funded legacy system (OPM),
    multiple system interfaces
  • Eliminate the dual User licenses and system
    maintenance contracts
  • Provide a scalable platform, that supports the
    addition of new/more complex business processes

4
Project Scope
  • Replace Oracle OPM with SAP functionality in the
    following areas
  • Master Data Management
  • Planning
  • Procurement
  • Inventory Management
  • Cost Tracking
  • Production
  • Quality Management
  • Provide specific functional enhancements to
    improve ease of use increase efficiency
  • Including direct use of MIT SAP Purchasing
    Financials
  • Out of scope items clearly defined and agreed
    upon

5
Project Approach
  • Team expectations clearly defined
  • Team members educated on basic project truths
  • Scope, Schedule, Budget (resources)
  • Measurable acceptance criteria for project
    success
  • Collaborative effort between Broad and IST
  • Co-team leaders established a cohesive team
  • Broad business and IST members paired
  • Active sponsorship and steering committee
  • Business Power Users dedicated to the project
  • You are empowered. Make the decisions!
  • Deal with tough or controversial issues up front
    dont wait!
  • Involve everyone, at every step
  • Extensive planning and scoping analysis conducted
    prior to project kick-off (2 month effort)
  • Project scope under change control at the onset

6
Project Timeline
Nov Dec Jan Feb Mar Apr
May Jun
  • Project Prep
  • Plan
  • Resources
  • Infrastructure
  • Blueprint
  • Flows
  • Policy Process
  • Specs
  • Walkthrough
  • Realization
  • Config (DEV TST)
  • Playbacks
  • FRICE
  • Integrated Test 1
  • UAT (IT2 Regression)
  • Final Prep
  • Build (PS1)
  • User Training
  • Convert

7
SAP Functionality Implemented
8
Overview Broad Flow
Print/Display Reports
Print/Display Reports
Print/Display Reports
  • Set up
  • Master Data
  • Materials
  • BOM/Recipe
  • Costs
  • Info Record

Receive POs
Create POs
Release Reqs
Run MRP
Inventory Movements
Goods Issue
Project Expensed Material
Misc Goods Receipt
Pay Invoices
Print/Display Reports
Input a Forecast
Create a Process Order
Mini-Mart Expensed Material
Backflush (fixing as necessary)
Purchase Expensed Material
  • Set up Quality
  • Master Data
  • Groups
  • MICs
  • Insp. Plans
  • SPC param

Create use an Inspection Lot
Pass data to/from SQUID
Print/Display Reports SPC
Print Checks
9
SAP Modules at Broad
  • SAP Modules include
  • Materials Management (MM)
  • Master data (material, vendor, purchasing
    information record),
  • Purchasing
  • Material Requirements Planning (MRP)
  • Inventory management (goods issue, goods
    receipts, goods transfer, physical inventory)
  • Batch management
  • Quality Management (QM)
  • Inspection plans / Master Inspection
    Characteristics, Inspection lots, Inspection
    Results Recording and Statistical Process Control
  • Quality inspection stock
  • Production Planning (PP)
  • Process orders and master recipes including Bill
    of Materials
  • Financial and Controlling (FI/CO)
  • Product Costing
  • Cross-Application Components
  • Document Management
  • Workflow

10
Broad is an SAP Plant
  • SAP defines a plant as a location that holds
    stock (inventory), contains service or
    maintenance facilities and or manufactures
    products
  • Each plant within SAP can have many unique
    features
  • Factory calendar identifies working days
  • Storage locations location where stock is
    physically kept in a plant
  • Master data - materials, work centers, bills or
    material, recipes, batch
  • Planning requirements reorder point, forecast
    based
  • Quality mgt inspection plans/master inspection
    characteristics

11
Master Data Management
  • Plant Calendar specific for broad
  • Organizational Structure (Plant, Purchasing
    group, etc.)
  • Material Master (Part Numbers)
  • Re-Order Points
  • Lead time
  • Standard cost
  • Bills Of Material (BOMs)
  • Master Inspection Characteristics (MICs)
  • Inspection Plans
  • Recipes
  • Reason Codes
  • Purchasing Info Records
  • Purchasing Source Lists
  • Release/Approval Levels (Req. PO)

12
Planning
  • Forecasting
  • Long Term Planning (LTP)
  • Materials Requirement Planning (MRP)
  • Finished and Semi-finished (Make)
  • Raw materials/Components (Buy)
  • Bulk materials (Buy)
  • Cash Flow Analysis
  • Actuals vs Budget Comparisons

13
Procurement
  • MRP generated Purchase Requisitions
  • Directly created Purchase Requisitions
  • In SAP
  • Via SAP Web
  • Purchase Requisition approval workflow
  • Purchase Order creation using Req info master
    data
  • Electronic document management for both
    Requisitions and POs (RFQ, Quotes, Specs, etc)
  • Purchase Order approval workflow
  • Automatic Purchase Order print/fax
  • Single screen for Expensed material Receiving
  • Custom Confirmation transaction for Inventory
  • Quality Hold on Invoice payment until after
    approval (where desired)
  • Automated 3 way match for Invoice payment

14
Inventory Management
  • Goods receipts
  • Purchase Orders/Production Orders
  • Cost Centers
  • Projects/Internal Orders
  • Mini-Marts/Groups (WBS cost objects)
  • Goods Issues
  • Production Orders (including Backflush)
  • Cost Centers
  • Projects/Internal Orders
  • Mini-Marts/Groups (WBS cost objects)
  • Goods movements within Stockroom
  • Cycle Counting Physical Inventory
  • Restricted and Un-restricted stock
  • Connected/Synchronized Unit and

15
Production
  • Process orders
  • Capturing costs
  • Goods Issue and/or Back Flush
  • Automated batch assignment
  • Debugging via Lot Genealogy (from Supplier to
    finished product)
  • Yield tracking
  • Integration to Quality results tracking
  • MRP Planning capability

16
Quality Management
  • Automated Batch assignment
  • Lot Genealogy from Supplier to End Product
  • Feeds to Broad Data Warehouse (SQUID) reporting
  • Invoice payment hold until Quality approval on
    Receipts (where desired)
  • Pre-defined Master Inspection Characteristics
    and Inspection Plans
  • Consistency
  • Ease of maintenance
  • On Line Usage Decisions
  • Inventory Units and moves to correct bucket
    automatically
  • Results tracking and Alerts
  • Statistical Process Control (SPC) charts

17
Cost Tracking
  • Monthly Updated Standard Cost tied to each
    material
  • Material tracked to individual WBS cost
    objects, internal orders (projects).
  • Based on Standard cost X Unit Qty
  • For POs, Goods Issues, Returns, etc
  • Single transaction moves and Units
  • Variance accounts to isolate particular
    activities
  • Reason codes to provide granularity
  • Expanded reporting (Inventory , PPV, etc)
  • Ability to track actual cost expended against a
    pre-established budget
  • Capability to plan and track Labor costs as well,
    though this is not being used by the Broad
Write a Comment