ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY - PowerPoint PPT Presentation

About This Presentation
Title:

ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY

Description:

Assessement of protection: ... relay testing Dynamic relay testing Conclusion Liberalization Cost reduction High quality of supply (reliability) risk management, ... – PowerPoint PPT presentation

Number of Views:136
Avg rating:3.0/5.0
Slides: 11
Provided by: dhb020
Category:

less

Transcript and Presenter's Notes

Title: ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY


1
ASSESSMENT OF PROTECTION SCHEMES A KEY FACTOR
FOR RELIABILITY
  • Alain SCHENK
  • David ORZAN
  • Fritz GANTENBEIN
  • Markus VON ARX
  • BKW FMB Energy Ltd.
  • Switzerland

2
Assessement of protection Why ?
  • Liberalization
  • Cost reduction
  • High quality of supply (reliability)
  • risk management, condition based maintenance
  • Less security margin ? More faults are expected
    than before
  • New possibilities improve the reliability of
    protection
  • Numerical relays (new schemes for specific
    situations)
  • Calculation programs
  • Testing devices

3
Assessement of protection How ?
  • Tools
  • Event of fault recorders
  • Periodic relay testing
  • Calculation programs
  • Dynamic relay testing

4
Simulation for a mutliterminal line
  • Problems
  • Relatively short line (15 km)? selectivity
  • High short circuit currents and quite well
    interconnected network
  • No signalling equipment
  • Inhomogeneous lines
  • Industrial plants? own generation capabilities
    or supply by other networks

5
Simulation for a mutliterminal line
With embedded generator(Industry customer)
Without embedded generator(Industry customer)
6
Dynamic relay testing
  • Incorrect relay operation
  • Did the relay maloperate or were the settings
    incorrect ?? check of relay behaviour? check of
    relay settings

7
Dynamic relay testing
Voltage (faulted phase)
Voltage (healthy phase)
Current
? Unstable operation of the relay could be
confirmed
8
Dynamic relay testing
Problem
  • Does the relay trip when a short circuit occurs
    between the two systems ?

9
Dynamic relay testing
  • Tripping unreliable without earth contact ?
    teleprotection

10
Conclusion
  • Situation
  • Protection assessment is necessary because of the
    reduced security margin due to cost pressure
  • Protection assessment can be significantly
    improved through simulations and dynamic testing
  • Advantages of the proposed approach
  • Reduced investigation time ? low cost
  • Consideration of all scenario and aspects ? high
    quality
  • Study of complicated situations ? deep
    understanding
Write a Comment
User Comments (0)
About PowerShow.com