2Geminiís Market Focused Reengineering Offering
Includes Ten Key Elements
5 Integration (Work Architecture)
CONSTRUCT/Systems Design and Implementation
4 Market Focus
7 Process Reengineering
10 Reskilling Infra-structureRenewal
Process Visioning
Process Concep- tualization
Process Design
Implement- ation Planning
Implement- ation Execution
3 Strategic Goals Measurements
6 "Early Wins"
2 Technology IT Strategy
8 BenchmarkingService Offering
9 Activity-BasedManagement
1 Client Partnering Mobilization
3Our Core Process Reengineering Methodology
Focuses Primarily on Three of these Elements
5 Integration (Work Architecture)
CONSTRUCT/Systems Design and Implementation
4 Market Focus
7 Process Reengineering
10 Reskilling Infra-structureRenewal
Process Visioning
Process Concep- tualization
Process Design
Implement- ation Planning
Implement- ation Execution
3 Strategic Goals Measurements
6 "Early Wins"
2 Technology IT Strategy
8 BenchmarkingService Offering
9 Activity-BasedManagement
1 Client Partnering Mobilization
4Geminiís Client Partnering and Mobilization Model
Provides Insight into our Unique Approach in this
area
Systemic View
ï How ìBehaviorsî ï Model Change ï Gemini
Consultant as ìLeadî
ï Knowledge ï Behavioral Skills ï ìThoughtî
Processes
Gemini Consultant
ï Knowledge ï Behavioral Skills ï ìThoughtî
Processes ï Role Model for Change
Client As Consultant - Results Transfer
Client Participation
ï Client Ownership ï Peer Relationship ï Trust/Dis
closure
ï Client as Lead ï Decision-Making ï Client
Teaches/ Implements ï Client Based ï Training
Client Enablement
55. Integration
5. Integration
5.1 Understand
5.2 Frame
5.3 Prioritize
5.4 Manage
- Purpose To focus on ensuring reengineering
efforts, process improvement activities, business
initiatives (such as TQM), and business
objectives are integrated, consistency
maintained, and a smooth transition occurs as
the reengineered process(es) are implemented - Deliverables/Results An integrated,
well-structured reengineering program aligned
with business objectives and consistent with
process improvement streams and business
initiatives - Key Activities Form and on-board Integration
Team - Understand major processes and change
opportunities - Frame a high-level view of business activities
- Prioritize process change opportunities
- Create process change teams
- Manage process change efforts
- Note Many of the key integration activities may
be completed during the AD efforts leading up to
the project start - Key Tools/Diagnostics Benchmarking Service
Offering Project Management - CONSTRUCT Decision Modeling
- Value Chain Analysis Cost/Benefit Analysis
- Benefits Tracking
SM
65. Integration - Client Partnering
Critical Success Factors
- Gemini, top client, key executives and their
direct reports all share a clear and common
understanding of the goals, objectives, logic,
methodologies and schedule of the reengineering
project. - Formation of, and team building with, Executive
Steering Committee (ESC) early in project - Effectively managed ESC and Core Team meetings
- Team structure (roles, responsibilities, etc.)
jointly (Gemini and client) defined and agreed
upon - Frequent prepositioning/one-on-one coaching of
ESC team members
Key Activities Requiring Partnering
- Assist client in rationalizing existing
improvement efforts - Help client understand reengineering process and
assist in identifying and prioritizing
opportunities for reengineering - Identify ESC members
- Conduct Executive prepositioning meetings around
project scope/deliverables, goals and objectives - Conduct joint team training (Gemini results
delivery team plus key client work-withs) - Introduce ìpartneringî model (page 4) ñ Process
consultation - Managing change and resistance ñ PS/TB
- Conflict resolution ñ Trust formula
- Effective meeting management
- Begin to create overall organization leadership
model - Begin to model and introduce effective change
behaviors - Begin client expectations exchange. Emphasize
clientís full, daily involvement - Assess organizational and corporate culture
- Develop individual coaching plans for key
executives and assign coaches/mentors from Gemini
team - Determine appropriate industry content/process
knowledge required - Develop processes to assess level of client
ownership and buy-in - Help client understand the Gemini MFR process
- Facilitate Executive Steering Committeeís
selection of core management team to monitor
project workstreams - Train core team in natural work team (NWT)
methodologies
T 1/RxCxI Trust is inversely proportional to
the risk, and directly proportional to the level
of credibility and intimacy established
75. Integration - Client Partnering (cont.)
Key Insights
- Add value quickly -- demonstrate content
knowledge, offer insight into client operations,
demonstrate value of process consultation - Focus on developing mutual respect and
understanding at this stage. Be honest. Listen
actively. Be candid, but supportive.
Demonstrate that you care and understand. Value
the client as a partner - Be relentless in your learning about the
clientís - Business, politics, culture, personal aspirations
- Introduce and model effective change management
behaviors at every opportunity - Inspire confidence and credibility through
behavior and performance - It is important to develop a mechanism to assess
the level of client ownership and buy-in - Executive Steering Committee will probably be the
most senior members of the client and may include
representatives from first line managers and
staff - Ideally the top client should be the team leader
of the Executive Steering Committee. If not, a
direct report can be the leader and the top
client can be the Executive Champion - The joint team training is best conducted
off-site with informal team building activities
(dinners, golf, etc.) ideally during week one of
the project - A highly credible and experienced facilitator is
required for the joint team training. One
alternative is to use a series of ìguest
speakersî like GSW - The use of a formal client coaching matrix will
help clarify responsibilities and frequency of
contact for the Gemini team - The ESC and Core Team should be in place ASAP,
ideally by end of week one - Have ESC/Core Team representation at joint team
training (ideally, the top client can visit Day 1
to provide personal endorsement and support) - Account Manager should meet with all ESC members
one-on-one to exchange expectations of project
prior to first team meeting - Get a commitment up front for a regular meeting
time. Have the ESC put the meeting on their
calendar, then change/cancel by exception - Push process, but not too fast. Senior
management teams are typically slower to adopt
Gemini processes than other teams. Hold them to
the same standards as NWTs, but be prepared to
take 6-8 weeks to raise their awareness of and
skills in managing their meetings and problem
solving processes. Remember, theyíre only
getting a chance to practice these skills once a
week. If you rush them it can be a turn-off
85. Integration - Client Partnering (cont.)
Key Insights (cont.)
- One-on-one sessions with the clients are where
the relationships are really nurtured. Do lots
of private coaching and prepositioning on
important issues - The process should be an experiential one versus
just ìa Gemini meetingî. Work early to
identify/provide roles for ESC members to play - Make the ESC membersí administrative assistants
your partners. These assistants can be a
tremendous help in getting you on their bossís
calendar, handling logistics for you, etc. Get
to know them, treat them with respect, and try to
make their lives easier when you can - Do not engage in potential win-lose disagreements
with the client over who gets ìcreditî for the
benefits. Our job is not to ìproveî Gemini
caused the benefits, but to have the benefits
occur! It will ultimately be more of a win-win
to have the client ìownî the benefits from the
beginning - On Team Member Selection
- Jointly determine the criteria for Process
Reengineering team membership with the Core Team
and, if necessary, input from the ESC - Select team members who
- Are the future leaders of the business
- Are respected by the organization for their
technical and personal skills - Are knowledgeable of the organizationís resources
- Can think ìout-of-the-boxî
- Where possible, try to have Process Reengineering
team champions at the ESC level
95.1 Integration - Understand
5. Integration
5.2 Frame
5.3 Prioritize
5.4 Manage
5.1 Understand
- Purpose To develop a full understanding of the
opportunities for process change, identify the
key levers and dimensions of change to be
utilized during the reengineering and/or process
improvement effort, and establish the high-level
process performance indicators (PPIs) for the
reengineering project - Deliverables/Results Overall assessment of
process change opportunities and implications - Establishment of key high-level process
performance measures and objectives - Levers and dimensions of change identified
- Identification of current client initiatives and
their potential impacts - Understanding of relationships between stream,
project, and business performance measures - Key Activities Review and validate AD findings
and business case focusing on short, medium, and
long term implications - Understand previous consulting project efforts
(client specific and general industry) and client
business initiatives that are likely to impact
the project - Develop/refine high-level objectives for
performance, cost, customer measures, etc. - Identify the key levers/dimensions of change to
be utilized both opportunities and constraints - What technologies can be considered and are there
constraints on their application? - Can partnerships and customer/supplier
arrangements or relationships be pursued? - Are there constraints on organization, skill
sets, or reward structures? - What flexibility exists for the process
relationships and process structure? - Develop an initial benchmarking approach to
support process change efforts
105.1 Integration - Understand (cont.)
5. Integration
5.2 Frame
5.3 Prioritize
5.4 Manage
5.1 Understand
- Tools/Diagnostics Process Flow
Analysis Benchmarking Service Offering - Initiative Rationalization
- Optional Create a Methodology Center for
integration, education, documentation, and
project management - Develop high-level concept models to identify
paradigm shifts - Create high-level views of process
characteristics and performance with respect to
industry and cross-industry approaches
Note A Methodology Center is an effective
approach to the distribution and management of
methodologies, tools, and techniques used during
the reengineering effort. Advantages for the
client include consistency of implementation,
central location for Gemini expertise, and the
creation of an innovative environment to shape
and enhance approaches. Advantages to Gemini
include central point of contact and control
for approaches, tools, and techniques, single
point of contact between the firm and the
project, and a formal mechanism to capture and
document key lessons and enhancements of methods.
115.2 Integration - Frame with Work Architecture
5. Integration
5.1 Understand
5.3 Prioritize
5.4 Manage
5.2 Frame
- Purpose To create a high-level model of the
fundamental work activities of the business. The
model is a fundamental framework of the business
in support of improvement and innovation
activities. CONSTRUCT provides an
integrating framework for the work activities and
supporting information needs - Deliverables/Results High level work
architecture - Process map (core and support)
- Process linkage diagram
- Dictionary of terminology
- Key Activities Build work architecture (5-7
levels) - Identify Mid-Level lifecycle
- Develop process flows (Should-Be)
- Analyze major/core processes (trigger and end
result) - Define key linkages between processes
- Develop total process map (core and support
processes) - Tools/Diagnostics CONSTRUCT Value Chain Analysis
SM
SM
Note The construction of a Conceptual Model
during the Direction Setting phase is required
125.3 Integration - Prioritize
5. Integration
5.1 Understand
5.2 Frame
5.4 Manage
5.3 Prioritize
- Purpose To determine the order and degree of
process reengineering activities and establish
objectives, time-frame, and project management
approaches - Deliverables/Results Prioritized process change
efforts with objectives, time-frames, and
associated benefits - Project management approaches established
- Teams identified, charters strawmodeled, roles
and responsibilities defined - Overall understanding of process impacts and
integration issues - Key Activities Develop decision model framework
for process changes based on impact, importance,
cost, value, time, degree - Finalize objectives and approach
- Identify teams, establish roles and
responsibilities, and create strawmodel charters - Tools/Diagnostics Decision Modeling Responsibili
ty Charting (RACI) - Cost/Benefit Analysis
135.4 Integration - Manage
1. Integration
5.1 Understand
5.2 Frame
5.3 Prioritize
5.4 Manage
- Purpose To manage process improvement/reengineer
ing activities, ensure schedule commitments are
being met, expected results achieved, and
benefits are tracked. Provide additional support
via tools techniques, content requirements, and
address organizational, human factor, etc. issues - Deliverables/Results Well managed process
reengineering project - Benefits and results identified and tracked
- Approach and lessons documented
- Key Activities Support development and tracking
of team schedules - Provide training and content expertise as
required - Act as a focal point for results and lessons
- Manage overall integration issues across teams
- On-going tracking of benefits
- Tools/Diagnostics Project Management
146. ìEarly Winsî
6. ìEarly Winsî
- Purpose To provide the near-term benefits
associated with quickly implementable process
improvements to help generate client enthusiasm
and buy-in for the longer-term reengineering
program - Expected Result A sufficient realization of
near-term benefits to set the foundation for the
full reengineering effort - Key Activities Identification of Early Win
opportunities in the first week of process
reengineering efforts - Implementation of early Quick Hits coupled with a
continuous effort to surface others - Continual monitoring to assure that the Quick
Hits identified are not in conflict with the
longer term reengineering direction - Key Tools/Diagnostics Process Improvement
156. ìEarly Winsî - Client Partnering
Critical Success Factors
- To have identified realistic, achieveable
opportunities, at project inception (i.e., during
the AD), for realizing immediate, quantifyable
benefits - Benefits must be achieved early in the process
Key Activities Requiring Partnering
- Assist the client in quantifying the potential
benefits to be driven by early wins - Develop implementation plans for each early win
and help the client through implementation
Key Insights
- Take on the responsibility for implementation --
role model ìhow toî implement for the client - Show a sense of urgency in meeting deliverables
-- be driven - Do not engage in potential win-lose disagreements
with the client over who gets ìcreditî for the
benefits. Our job is not to ìproveî Gemini
caused the benefits, but to have the benefits
occur! It will ultimately be more of a win-win
to have the client ìownî the benefits from the
beginning
16 7. Process Reengineering
7. Process Reengineering
7.2 ProcessConceptualization
7.3 ProcessDesign
7.4 ImplementationPlanning
7.1 ProcessVisioning
7.5 ImplementationExecution
- Purpose To analyze the current business process
environment and create reengineered processes
with the intent of realizing step-change
improvement. A Process Reengineering stream is
undertaken for each process targeted for
improvement. Overall context and integration is
provided by the Integration Team - Deliverables/Results Completed To-Be models
- Strategies and plans for implementing all aspects
of the To-Be models including processes and
policies, organization, roles and
responsibilities, and performance measures. - Buy-in/commitment of To-Be models and
implementation plans across the organization - (see each sub-phase for key activities and
tools/diagnostics)
177.1 Process Visioning
7. Process Reengineering Streams
7.2 ProcessConceptualization
7.3 ProcessDesign
7.4 ImplementationPlanning
7.1 ProcessVisioning
7.5 ImplementationExecution
- Purpose To create an overall vision for the
process reengineering effort including
potential enablers, constraints, key design
characteristics, and customer needs - Deliverables/Results Objectives and attributes
for the processes targeted for reengineering - Constraints and potential implementation barriers
identified and prioritized - Customer needs by segment identified and assessed
- Key process design criteria and high-level PPIs
defined - Key Tools/Diagnostics Benchmarking Service
Offering Customer Needs Analysis
7.1.1 Initiate Process ReengineeringWork
Teams 7.1.2 Conduct Best Practices
Benchmarks 7.1.3 Understand Customer
Needs 7.1.4 Conduct Innovation Workshops 7.1.5 Ide
ntify Design Parameters and Constraints 7.1.6 Deve
lop Key Design Criteria and PPIs
Note Development of a process vision may be
driven by either Direction Setting such as
Balanced Scorecard or augmented by Enhancement
Methodologies such as Activity Based Management
(ABM) or Building a Market-Focused Organization
(BMFO)
187.1 Process Visioning - Client Partnering
Critical Success Factors
- Agreement upon a well articulated vision
statement on the reengineering effort which is
linked to an integrated template detailing the
interdependent efforts required to realize that
vision - Putting a ìstake in the groundî having well
defined objectives, performance measures and
targets
Key Activities Requiring Partnering
- Validate Process Reengineering team charters and
communication roll-out plans (use clientís
existing communication mechanisms wherever
possible) - Train Process Reengineering teams NWT
methodology, process consultation, Process
Reengineering methodology, PS/TB, meeting
effectiveness - Identify and nurture influencers within teams
- Assess effectiveness of each teamís
approach/scope, project schedules, roles and
responsibilities and communications plans - Assist client in developing a reengineering
template - Schedule periodic reviews with the ESC
197.1 Process Visioning - Client Partnering (cont.)
Key Insights
- On Managing Expectations
- Manage client expectations around the
reengineering effort -- donít oversell though --
over deliver! - Continually refresh and rework these expectations
- Be sure to validate each Process Reengineering
team charter and communication plan with the Core
Team - If the complexity and magnitude of the project
are high enough, one option is to have a separate
communications NWT that will have responsibility
for communicating all teamís plans
207.1.1 Initiate Process Reengineering Work Teams
7.1 Process Visioning
7.1.2 Conduct Best Practices Benchmarking
7.1.3 Understand Customer Needs
7.1.4 Conduct Innovation Workshops
7.1.6 Develop Key Design Criteria and PPIs
7.1.5 Identify Design Parameters and Constraints
7.1.1 Initiate Process Reengineering Work Teams
- Purpose To kick-off Process Reengineering teams
including charter, roles responsibilities, and
training of team - Deliverables/Results Process Reengineering Work
Teams are established including charter, roles
responsibilities, and scope - Teams are trained in use of relevant Process
Reengineering tools and techniques - Each team has undergone team effectiveness
training - Project direction, scope, expectations, and
time-tables have been articulated to each Work
Team - Key Activities Obtain input from the
Integration Team - Refine work stream approach and charter
- Define scope of the As-Is process to be analyzed
(improvement/redesign) or establish boundaries
for To-Be process (reengineering/innovation) - Conduct team training
- Process design/reengineering tools/techniques
- Team effectiveness and process tools/techniques
- Develop initial vision of how the process should
look and address customers, and interfaces - Develop initial benchmarking approach
- Tools/Diagnostics
217.1.2 Conduct Best Practices Benchmarking
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.3 Understand Customer Needs
7.1.6 Develop Key Design Criteria and PPIs
7.1.4 Conduct Innovation Workshops
7.1.5 Identify Design Parameters and Constraints
7.1.2 Conduct Best Practices Benchmarking
- Purpose Dependent upon the benchmarking
strategy and the level of improvement vs.
innovation required - Identify best practice targets for processes
and/or sub-processes (both within industry and
cross-industry) - Identify PPIs for similar processes
- Benchmark technology used for similar purposes
- Benchmark organization/human resource structures,
and facilities, for similar processes or
environments - Deliverables/Results Best practice benchmarks
for each sub-process area - Identified gaps between Best Practices and
current processes/sub-processes - Key Activities Build client understanding of
the role of benchmarking in reengineering - Conduct high-level benchmarking in each process
area - Scan literature, data bases and other public
domain sources - Review internal best practices and relevant
KPIs/PPIs - Select Best-In-Class targets for each sub-process
area - Verify with client champion(s)
- Conduct primary research (i.e., site visits and
telephone interviews) - Summarize findings
227.1.2 Conduct Best Practices Benchmarking (cont.)
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.3 Understand Customer Needs
7.1.6 Develop Key Design Criteria and PPIs
7.1.4 Conduct Innovation Workshops
7.1.5 Identify Design Parameters and Constraints
7.1.2 Conduct Best Practices Benchmarking
- Key Activities (cont.) Perform gap analysis for
each sub-process component - Utilize benchmarks to help validate process
change recommendations - Team Structure Benchmarking task team comprised
of overall benchmarking coordinator from the core
team and a designated benchmarking resource from
each reengineering workstream - Tools/Diagnostics Benchmarking Service Offering
Best Practices Data Base - Internal Benchmarking Clearinghouse (IBC) Gemini
Support Centers
237.1.3 Understand Customer Needs
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.2 Conduct Best Practices Benchmarking
7.1.6 Develop Key Design Criteria and PPIs
7.1.4 Conduct Innovation Workshops
7.1.5 Identify Design Parameters and Constraints
7.1.3 Understand Customer Needs
- Purpose To gain the customer perspective of the
process being reengineered. For internal
customers, sessions can be held to clearly
determine customers needs and requirements. For
external customers, an understanding of their
business should be gained through Customer Needs
Analysis and/or BMFO techniques - Deliverables/Results Segmentation of customers
along several dimensions such as product,
profitability, size, technical sophistication,
etc. - Results from customer interviews and workshops
focused on understanding their business, their
use of the process output, and the process
interface(s) - The customer vision of the process being
reengineered - Key Activities Segment customer by product,
profitability, and size - Administer customer interviews ensuring coverage
across all key segments, collecting knowledge of
their business, their use of the process output,
and their technical sophistication - Administer customer workshops to better
understand the customer use of the process output
and their business - Document and discuss results to gain the customer
vision of the process being reengineered - Tools/Diagnostics Customer Needs Analysis BMFO
- Organizational Interface Study
247.1.4 Conduct Innovation Workshops
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.2 Conduct Best Practices Benchmarking
7.1.3 Understand Customer Needs
7.1.6 Develop Key Design Criteria and PPIs
7.1.5 Identify Design Parameters and Constraints
7.1.4 Conduct Innovation Workshops
- Purpose To create an innovative environment and
enhance creative thinking through topical-based
workshops centered around leading edge thinking
on technology or organization. Innovation
workshops help drive ìout-of-the-boxî thinking
by leveraging subject matter experts - Deliverables/Results A reengineering or design
team well versed in leading-edge technology and
organizational thinking with a focus on
applicability in the client environment - Key Activities Identify topics and subject
matter experts - Develop workshop agenda and format
- Conduct workshop(s)
- Summarize and document workshops with specific
focus on applicability of ideas within client
environment - Tools/Diagnostics Innovation Workshop Guidelines
257.1.5 Identify Design Parameters and Constraints
3.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.2 Conduct Best Practices Benchmarking
7.1.3 Understand Customer Needs
7.1.6 Develop Key Design Criteria and PPIs
7.1.4 Conduct Innovation Workshops
7.1.5 Identify Design Parameters Constraints
- Purpose To identify key design parameters which
will impact the reengineering effort. Enablers
and constraints may be in the form of
technology, information, organization, skills,
customer/supplier relationships, etc. - Deliverables/Results Identified and documented
enablers for reengineering the selected
process(es) - Identified and documented constraints on
reengineering activities or design of the
process(es) - Key Activities Brainstorm potential enablers
and constraints - Research each identified enabler and constraint
to assess the opportunity and impact - Determine which enablers and constraints will be
accepted - Tools/Diagnostics
267.1.6 Develop Key Design Criteria and PPIs
7.1 Process Visioning
7.1.1 Initiate Process Reengineering Work Teams
7.1.2 Conduct Best Practices Benchmarking
7.1.3 Understand Customer Needs
7.1.5 Identify Design Parameters and Constraints
7.1.4 Conduct Innovation Workshops
7.1.6 Develop Key Design Criteria and PPIs
- Purpose The final step in the development of a
process vision. Intended to articulate the
high-level design criteria and process
performance indicators (PPIs) which will drive
the detailed process design. Design criteria
can take the form of constraints and/or enablers
or customer requirements which will need to be
met. PPIs describe the measures which determine
quality of the resulting processes - Deliverables/Results High-level design criteria
documented and validated - High-level PPIs documented and validated
- Key Activities Identify and document design
criteria - Identify and document PPIs
- Tools/Diagnostics
277.2 Process Conceptualization
7. Process Reengineering Streams
7.2 ProcessConceptualization
7.3 ProcessDesign
7.4 ImplementationPlanning
7.1 ProcessVisioning
7.5 ImplementationExecution
- Purpose To analyze the current situation
regarding processes to be reengineered while
utilizing Benchmarking to identify best practices
and assuring alignment with the high-level work
architecture - Deliverables/Results Validated As-Is process
- Identified performance gaps relative to internal
and external processes - Characteristics of the To-Be process(es)
developed - Key Tools/Diagnostics Responsibility Charting
(RACI) Process Flow Analysis
7.2.1 Define Analyze As-Is Processes,
Sub-Processes 7.2.2 Identify/Document Current
PPIs 7.2.3 Understand As-Is Organization 7.2.4 Und
erstand Existing Systems/Technology 7.2.5 Identify
and Understand Key Cost Drivers 7.2.6 Map As-Is
Processes to Work Architecture 7.2.7 Validate
As-Is Process and Refine To-Be Characteristics
287.2 Process Conceptualization - Client Partnering
Critical Success Factors
- Extensive validation of current As-Is processes
and To-Be opportunities carried out at multiple
levels within the organization
Key Activities Requiring Partnering
- Train Process Reengineering teams in Brown Paper
methodology - Conduct multiple prepositioning meetings with key
clients to validate As-Is processes across the
organization - Revalidate as Brown Paper changes/develops
- Help the client define characteristics of the
To-Be process
Key Insights
- On Analyzing the As-Is
- Defining and analyzing the As-Is processes is an
early and key opportunity to build trust with the
client. It is high credibility and low risk for
the client while focusing on increasing intimacy
with Gemini (T 1/R x C x I) - A careful balance is required to avoid ìanalysis
paralysisî by over-detailing the As-Is systems,
while maintaining the necessary level of detail - Be sensitive to subtle resistance by the client
wanting to stay with the As-Is and continue to
detail it (which is relatively safe and requires
little change) before going on to the To-Be
(which is less safe and requires more change) - On Developing the To-Be
- Ensure that team members are ìunfrozenî before
exposing them to new ideas to be heard - Provide relevant benchmarking information ñ Encour
age client to attend seminars - Provide examples of successful implementation
- Get the team to think out-of-the-box and not look
only at direct competitors. One way to do this
is to have them think about the
characteristics/features of their To-Be, then
identify companies that are world class in that
characteristic to use as a benchmark. For
example, if ìpush accountability downî is a key
process element, then Gore-Tex may be a company
you want to look at, since they are known for
pushing accountability down - Try to get emotional issues (ìI donít want to be
the cause of someone losing their job . . .î) out
on the table early and demonstrate the value of
discussing all issues openly
297.2.1 Define and Analyze As-Is Processes and
Sub-Processes
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
- Purpose To thoroughly understand and document
the As-Is process as a baseline for change - Deliverables/Results Completed As-Is process
model - Sub-processes documented and understood
- Key Activities Conduct client orientation on
As-Is process development - Review Process Flow Analysis guidelines and
conduct training - Develop ìstrawmodelî sub-process area definitions
- Schedule and communicate brown papering events
- Develop ìAs-Isî model
- Lay out high-level work steps (for each
sub-process area) - Develop work activity steps for each sub-process
area - Define/identify work activity linkages
- Identify inputs and outputs and information
requirements for each work activity - Document As-Is conditions in each sub-process
area - Conduct self-assessment of strengths and
weaknesses/opportunities - Document key findings
- Conduct formal and informal one-on-one sharing of
sub-processes with stakeholders - Build/refine dictionary of terminology
- Team Structure As-Is analysis Natural Work Team
working under the guise of the overall
reengineering workstream - Tools/Diagnostics Process Flow Analysis
307.2.2 Identify and Document Current As-Is PPIs
7.2 Process Conceptualization
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.2 Identify / Document Current PPIs
- Purpose To identify and document measures being
used in the current process, not only from an
internal perspective but also from the customer
perspective - Deliverables/Results Documented and validated
PPIs from the current process(es) - Key Activities Assess existing process(es) to
determine the characteristics and measures of
success - Assess the customer view of the process measures
and characteristics - Document and validate the internal and external
process performance measures or indicators - Tools/Diagnostics Process Flow
Analysis Customer Needs Analysis
317.2.3 Understand Existing Organization
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.3 Understand As-Is Organization
- Purpose To understand and assess the existing
organization, as related to the process(es) being
reengineered, along several dimensions
including structure, skills, policies and
procedures, culture, human resource issues,
training programs and needs, etc. - Deliverables/Results An assessment of the
strengths and opportunities currently existing
within the organization as they relate to the
process(es) being reengineered - Key Activities Identify and document key
elements of the organization - Assess current strengths and weaknesses
- Tools/Diagnostics
Note A more in-depth assessment of
organizational diagnostics is available from the
OMD Disipline
327.2.4 Understand Existing Systems/Technology
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.3 Understanding As-Is
Organization
7.2.4 Understand Existing Systems/Technology
- Purpose To gain an understanding of the existing
technology and systems architecture and the IT
strategy of the organization. Specific focus is
on the process(es) being reengineered, however a
broader view of the IT capabilities, existing and
planned, is required in order to assess impact
and potential related to technology and systems - Deliverables/Results An assessment of the
current technology and systems capabilities,
especially as they relate to the process(es)
being reengineered - Key Activities Create a technology/systems map
related to the process being reengineered - Assess the technology/systems capabilities
resident within the organization overall - Tools/Diagnostics Systems Map
Note A more in-depth assessment of IT
capabilities is available by utilizing Geminiís
IT Effectiveness Approach
337.2.5 Identify and Understand Key Cost Drivers
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.6 Map As-Is Processes to Work Architecture
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.5 Identify and Understand Key Cost Drivers
- Purpose To identify and understand the cost
drivers for the activities related to the
process(es) being reengineered - Deliverables/Results A completed ABC paper
providing a thorough and visual representation of
activity costs related to a process - Key Activities Determine activity costs
- detail time requirements and determine costs
- detail all resources needed to complete activity
and determine cost - Identify cost drivers i.e., what can impact the
cost of the result - Add cost driver information to activity
dictionary and process brown papers - Tools/Diagnostics Activity Based Costing
Note The identification of cost drivers is one
step in the development of an ABC model
347.2.6 Map As-Is Processes to Work Architecture
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.6 Map As-Is Processes to Work Architecture
- Purpose To identify gaps and overlaps of
existing processes with activities defined in the
Work Architecture - Activities with multiple accountabilities
- Activities with no accountability
- Activities not existing in Work Architecture
- Additionally, to establish a common terminology
across process areas - Deliverables/Results As-Is processes aligned
with work performing terminology - Revised Work Architecture (e.g., addition of
missing work activities) - Key Activities Map As-Is processes (manual and
automated steps) to Work Architecture - Capture quantitative information related to
process activities (e.g., number of transactions,
volume, resources, cost, etc.) - Revise Work Architecture to include As-Is tasks
not previously identified and update activity
dictionary - Tools/Diagnostics Activity Rationalization Value
Added Assessment - Process Flow Analysis Responsibility Charting
(RACI)
357.2.7 Validate As-Is Process and Refine To-Be
Characteristics
7.2 Process Conceptualization
7.2.2 Identify / Document Current PPIs
7.2.3 Understand As-Is Organization
7.2.4 Understand Existing Systems/Technology
7.2.5 Identify and Understand Key Cost Drivers
7.2.6 Map As-Is Processes to Work Architecture
7.2.1 Define Analyze As-Is Processes,
Sub-Processes
7.2.7 Validate As-Is Process Refine To-Be
Characteristics
- Purpose To gain general consensus on the
accuracy of the As-Is models and start to
identify characteristics of the To-Be processes - Deliverables/Results Final As-Is process models
- Initial definition of To-Be process
characteristics - Milestone for broad scale communication of
project progress - Key Activities Prepare Validation Workshop(s)
- Identify and schedule key client participants
- Prepare strawmodels of process definitions
(scope), desired features of the To-Be process,
and PPIs - Conduct client preparatory/pre-positioning
meetings - Conduct validation workshop(s), develop
definitions of To-Be process(es), and document - Develop sub-process characteristics for the To-Be
model and document - Develop and document high-level process
performance indicators(PPIs) and process measures - Identify major opportunities and gaps (between
As-Is model and To-Be characteristics) - Gain agreement that overall As-Is situation has
been accurately captured - Communicate summary results of workshop back to
sites - Tools/Diagnostics Gap Analysis
367.3 Process Design
7. Process Reengineering Streams
7.2 ProcessConceptualization
7.3 ProcessDesign
7.4 ImplementationPlanning
7.1 ProcessVisioning
7.5 ImplementationExecution
7.3.1 Revise To-Be Characteristics Design
Criteria 7.3.2 Create High-Level Concept
Models 7.3.3 Develop Detailed Concept
Model 7.3.4 Define Sub-Processes 7.3.5 Integrate
Rationalize Sub-Processes 7.3.6 Validate To-Be
Model 7.3.7 Identify Organization, Technology, HR
Systems, etc. Requirements 7.3.8 Perform Gap
Analysis 7.3.9 Develop To-Be PPIs 7.3.10 Pilot
To-Be Model
- Purpose To create To-Be process models for the
key business processes which are being improved
or reengineered. The models are validated by
the client and aligned with the overall work
architecture - Deliverables/Results To-Be models for each
business process targeted for improvement or
reengineering - Process performance indicators (PPIs) identified
for each To-Be process and aligned with business
level key performance indicators (KPIs) - An initial description of To-Be roles and
responsibilities - Key Tools/Diagnostics Concept
Modeling Brainstorming - Process Flow Analysis Gap Analysis
- Backward Chaining
377.3 Process Design - Client Partnering
Critical Success Factors
- Buy-in from the involved organizational
constituents regarding the To-Be design
Key Activities Requiring Partnering
- Develop with the client a selection methodology
for choosing which To-Be design will be used --
methods, selection criteria, etc. - Prepositioning/coaching key clients in new To-Be
models and how to sell them to the organization - Helping key work-with clients work through their
own resistance to the To-Be models - Model effective conflict resolution behaviors for
clients as they begin to roll-out To-Be models
into their organizations - Train Process Reengineering work teams in
managing resistance, conflict resolution,
coaching skills, merchandising benefits of To-Be
models, active listening - Jointly determine communications plan for To-Be
models - Coach client to effectively set/determine
KPIís/PPIís - Assess cultural/organizational impact of new
processes - Assist client in characterizing the new skill
base required and how the current workforce can
be ëreskilledí - Schedule reviews with Core Team and ESC
387.3 Process Design - Client Partnering (cont.)
Key Insights
- If resistance has not been demonstrated before,
this is where it often begins (and intensifies
the closer you get to implementation). Deal
openly with the clientís concerns about
vulnerability and loss of control - This is a critical point in the engagement -- now
you are really beginning to ask the client to
make change occur! - It is essential to model effective change
management skills (i.e., listening, coaching,
conflict management, etc.) as you deal with the
clientís resistance behaviors. The client must
see/feel the authenticity of your behavior since
they cannot be expected to do what you have been
unable to demonstrate. This ìwalking the talkî
is a key way of continuing to build the trust by
lowering the perceived impending risk (i.e.,
implementation) while subtly demonstrating your
credibility - Validation of To-Be models is essential to
implementation and is a key differentiator for
Gemini. Donít underestimate the time or
difficulty to effectively validate. Resist the
temptation to shortcut this process. - Keep driving to the ìtakeawaysî -- always be able
to answer the question, ìSo what?î Donít
accumulate tons of data keep netting what you
see into summary points - Always validate with the top client first
- Validate with ESC members individually
- Prepresent to core team and other key client
work-withs prior to Process Reengineering team
members conducting validation meetings --
remember, no surprises! - Validation of the To-Be models will enhance the
credibility of the Process Reengineering teams.
Make sure they are ready by conducting rigorous
joint ìdress rehersalsî with QAís before the
actual validation meetings - Coach the Process Reengineering teams to expect
resistance when they hold their validation
meetings and to use conflict management/managing
resistance techniques vs. becoming defensive - Be sure that team members prepare a concise
summary of their validation sessions -- net
Bs/Cs, highlights of new issues, specific
suggestions on H2 improve model, and overall
temperature of validation population. Without
the summary format, the team will be overwhelmed
by the volume of validation data - Challenge the team to really think about how to
refine their model, based on the validation.
There is a tendency for the team to say ìWell,
they said this and this, but I still think weíre
rightî
397.3.1 Revise To-Be Characteristics and Establish
Design Criteria
7.3 Process Design
7.3.2 Create High-Level Concept Models
7.3.4 Define Sub-Processes
7.3.3 Develop Detailed Concept Model
7.3.5 Integrate and Rationalize Sub-Processes
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
7.3.8 Perform Gap Analysis
- Purpose To gain consensus across the
organization of the key characteristics of the
To-Be process. Additionally, to gain broad
commitment and support of the design activites - Deliverables/Results Initial To-Be
characteristics of the process - Key Activities Refine To-Be model
characteristics (see step 3.2.6 of Process
Conceptualization) - Gain inputs/builds on strawmodel process
characteristics - Identify and understand issues and concerns
related to the key process characteristics
throughout the organization - Gain consensus that key characteristics of To-Be
process have been captured - Incorporate/share learnings with work activities
framework (managed by the Integration Stream) - Tools/Diagnostics Process Flow Analysis
407.3.2 Create High-Level Concept Models
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.3 Develop Detailed Concept Model
7.3.5 Integrate and Rationalize Sub-Processes
7.3.4 Define Sub-Processes
7.3.2 Create High-Level Concept Models
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
- Purpose To create several High-Level Concept
Models of the process. The goal is to create an
environment of innovation with a focus on
discovering potentially new and unique ways of
accomplishing the process goals - Deliverables/Results Several High-Level Concept
models including process steps, assumptions,
resources, etc. - Key Activities Develop assumptions
- Build initial models
- Test assumptions against scenarios
- Tools/Diagnostics Concept Modeling Brainstorming
- Process Flow Analysis Backward Chaining
417.3.3 Develop Detailed Concept Model
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.5 Integrate and Rationalize Sub-Processes
7.3.4 Define Sub-Processes
7.3.3 Develop Detailed Concept Model
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
- Purpose To create additional detail, to the
sub-process level, for selected Concept Models
and test the models against design criteria - Deliverables/Results A few, 2-3, Concept Models
detailed to the sub-process level including
organization, technology, information, systems,
and customer impact/relationship - A Concept Model representing the high-level
reengineered process. - Key Activities Develop model detail including
sub-processes, organization,information,
technology, systems, etc. options - Select the Concept Model which will form the
basis of the reengineered process - Test assumptions against scenarios and internal
and external constituencies - Tools/Diagnostics Concept Modeling Brainstorming
- Process Flow Analysis
427.3.4 Define Sub-Processes
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.5 Integrate and Rationalize Sub-Processes
7.3.4 Define Sub-Processes
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
- Purpose To convert To-Be characteristics into
process steps - Deliverables/Results An initial set of process
steps and related information including inputs,
processes, and outputs - Key Activities Categorize each characteristic
as one of four things - Input, output, process step, or measurement
- Explore characteristics which do not fit the
categorization and either create exceptions or
break them into characteristics which can be
categorized - Refine characteristic definitions (if necessary)
- Develop input/process/output (I/P/O) description
for each characteristic - Define what outputs are need or desired from each
characteristic - Determine inputs needed (to convert input to
output) - Identify conversion process links inputs to
output - Examine each I/P/O in terms of how it will fit
into process - Develop initial description of work activities
- Identify known pieces of the flow
- Map back to Work Architecture to identify gaps
- Begin to examine work activity linkages
437.3.4 Define Sub-Processes (cont.)
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.5 Integrate and Rationalize Sub-Processes
7.3.4 Define Sub-Processes
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
- Key Activities (cont.) Create ìBox and Wireî
diagram of each sub-process - Identify and address overlaps and gaps
- Check for uniformity of detail in the process
steps (a common level of detail needs to be
ensured) - Note ìwhatî needs to be completely defined but
ìwhoî, ìwhenî, ìwhereî, and ìhowî should not be
answered - Tools/Diagnostics Process Flow
Analysis Input/Process/Output Analysis (I/P/O) - Optional Use of dynamic modeling/simulation
tools
447.3.5 Integrate and Rationalize Sub-Processes
3.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.4 Define Sub-Processes
7.3.5 Integrate and Rationalize Sub-Processes
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
- Purpose To construct a macro level process from
the sub-process blocks and rationalize the entire
process flow - Deliverables/Results An integrated,
rationalized To-Be process model - Key Activities Rationalize the sub-processes
- Identify key sub-process area(s) and map related
sub-processes - Create single diagram showing all sub-processes
and align similar work activities - Perform horizontal rationalization
- Align common points in the sub-processes
- Revisit benchmarking information
- Brainstorm alternatives for utilizing benchmark
data - Explore obvious and not so obvious improvements
in the horizontal process - Perform vertical integration
- Examine all similar types of activities and
determine whether they can be represented by a
consolidated process or activity - Tools/Diagnostics Process Rationalization
457.3.6 Validate Process Models
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.4 Define Sub-Processes
7.3.5 Integrate and Rationalize Sub-Processes
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
7.3.6 Validate Process Model
- Purpose To ensure a common understanding
exists of the To-Be process, field test the
process, and obtain constituent buy-in - Deliverables/Results Validated To-Be model
- Key Activities Validate the process model
- Initial roll-out and review of To-Be model
reviewing with content and interface experts - Achieve organization buy-in of the To-Be model
- Identify opportunities relative to migrating from
the As-Is to the To-Be models - Conduct high-level prioritization to determine
order of process change implementation - Tools/Diagnostics Process Flow Analysis
Note Prioritization may vary from site-to-site
depending on need
467.3.7 Identify Organization, Technology, Systems,
etc. Requirements
7.3 Process Design
7.3.1 Revise To-Be Characteristics Design
Criteria
7.3.2 Create High-Level Concept Models
7.3.3 Develop Detailed Concept Model
7.3.4 Define Sub-Processes
7.3.5 Integrate and Rationalize Sub-Processes
7.3.6 Validate Process Model
7.3.9 Develop To-Be PPIs
7.3.10 Pilot To-Be Models
7.3.8 Perform Gap Analysis
7.3.7 Identify Org., Tech., Systems, etc.
Requirements
- Purpose To identify the technology, systems,
and organizational requirements for the To-Be
model - Deliverables/Results Outline of technology
requirements to the level of detail required by a
Request For Proposal (RFP) utilizing either the
clientís or Geminiís approach - Outline of systems requirements to the level of
detail required by a Request For Proposal (RFP)
utilizing either the clientís or Geminiís
approach - Outline of information requirements of the
process to the data element level either in
Gemini or client specific format - Outline of organization requirements including
structure a