Title: Benchmarking Business Performance Best Practice Examples
1Benchmarking Business Performance Best Practice
Examples
- Omar L. Hassouneh
- M.Sc. Environmental Engg.
- Future Environment
2Objectives
- What is Environmental Benchmarking? Why is it
Important? - Why to Enhance your Environmental Business
Performance? - What is an Environmental Performance Indicator?
- How to Benchmark your Environmental Business
Performance? - Does it Worth the Effort?
3Where does Jordan Stand?
- Environment-Related Indices
- - Prescott-Allens Wellbeing Index
- - Consultative Group on Sustainable Development
Indicators (CGSDI) - - Redefining Progress Institute (the Ecological
Footprint index) - - GLTETF/World Economic Forum, Environmental
Sustainability Index (ESI)
4ESI-2002
- Sixty Eight (68) parameters within Five (5)
components - Environmental Systems
- Environmental Stresses
- Human Vulnerability
- Social and Institutional Capacity and
- Global Stewardship
5Total 142 Countries
http//www.ciesin.columbia.edu/indicators/ESI
6Key Common Parameters
- Significant Positive Correlation with GDP
- Innovative Responses Development
- Private Sector Responsiveness
7Environment-Related Regulations Examples
- Law of Protection of the Environment, Law No. 12,
1995 - Clear Air By Law (Under Development)
- Solid Waste Management By Law (U.D.)
- Water Protection By Law (U.D.)
- Greenhouse Emissions By Law (U.D.)
- Regulation for the Limitation of and Precaution
from Noise
8Environment-Related Standards Examples
- Pollutants Ambient Air Quality Standard JS
1140/1996 - Reclaimed Domestic Waste Water JS 893/2002
- Industrial Wastewater JS 202/2003 (Under
Revision) - Pollutants Maximum Allowable Limits of Air
Pollutants Emitted from the Stationary Sources JS
1189/1991
9How to Measure your Environmental Performance?
- Analyze your Process
- Determine points of pollutants generation
- Determine Environmental Performance Indicators
- Define normalization factors (relate to
production size) - Determine Pollution Contribution for each of the
Processes - Find Best Available Technology (BAT) values for
EPIs - Monitor Performance and Analyze Results
- Compare to Competitors Performance
- Continually Improve your Performance
10Process Analysis Determine EPIs
11Input Quantity Units Price Units
Wastewater Wastewater Wastewater Wastewater Wastewater
Quantity/Volume m3/year JD/ton
COD mg/l
BOD5 mg/l
TDS mg/l
Solid Waste Solid Waste Solid Waste Solid Waste Solid Waste
Hazardous Solid Waste tons/year JD/ton
Solid Waste for Landfill tons/year JD/ton
Solid Waste for Recycling tons/year JD/ton
Production Production Production Production Production
Product Type 1 tons/year JD/ton
Product Type 2 tons/year JD/ton
Product Type 3 tons/year JD/ton
Product Type 4 tons/year JD/ton
12Data Analysis-Example
Process 1 Process 1 Process 2 Process 2 Total Quantity
Quantity of total Quantity of total Total Quantity
Water
Consumption, m3/ton
COD, mg/l
Energy
Electricity, GJ/ton
Fuel, GJ/ton
Solid Waste
Hazardous SW, ton/ton
Air Emissions
CO2, ton/ton
13Performance Evaluation
EPI New Value Old Value BAT Action
Water Cons., m3/ton
Energy Cons., GJ/ton
CO2 Emission, ton/ton
Hazardous SW, ton/ton
14Economic Value
EPI EPI Value, JD EPI Value EPI BAT Potential Savings
Water Cons., m3/ton
COD, mg/l
Electricity Cons., kW/ton
Fuel Cons., GJ/ton
CO2 Emission, kg/ton
NOx Emissions, kg/ton
Hazardous SW, ton/ton
15General Tips and Techniques
- Water Conservation
- Proper production management procedures
- Reuse rinsing and cooling water
- Use separate streams for chemicals flow (GHK)
- Water Characterization
- Avoid using chemicals wherever possible
- Use biodegradable chemicals
- Accurately adjust chemicals dosing system
16Tips and Techniques (Cont.)
- Energy Conservation
- Segregate cold and hot water streams for heat
recovery - Insulate pipes and machinery to minimize heat
losses - Monitor machines performance
- Optimize tasks scheduling to minimize energy
consumption - Consider the use of devices of low energy ration
17Tips and Techniques (Cont.)
- Solid Waste Minimization
- Consult your vendor for using biodegradable
and/or less volume packaging material - Minimize the use of disposable materials/container
s - Segregate hazardous solid waste by special
containers - Separate different types of domestic solid waste
18Case 1 Chemicals Industry
- Large amounts of particulates emission. Exceeding
the thresholds of JS 1140/1996.
19Problem Analysis
- Companys Capital Investment JDM1.5
- Problem Large amounts of particulates emission.
Exceeding standards thresholds of air emissions
(JS 1140/1996). - Investigation Measure particulates (PM10)
concentration in different units to determine
contribution of each unit. - Result Powder detergent filling unit produces
45 of total particulates emissions.
20Solution
- Isolate Powder Filling Unit and install bag
filters at unit ventilation points. - Install vacuum feeding machine to feed the
filling machine directly from the mixer. - Contact vendor to provide raw material in barrels
instead of bags. - Set a preventive maintenance program to ensure
filling machine efficiency.
21Results
- A total investment of US70,000 was required to
install air filtration system. - Actual investment of US8,000.
- Reduced particulates emissions by 70.
- Improved the powder detergents unit performance
by 5 (wasted raw material)
22Case 2 Gas Industry-Energy Conservation
- A monthly electricity bill that exceeds JD10,000
(20 of the plant operating cost).
23Problem Analysis
- Companys Capital Investment JDM 0.5
- Year of establishment 1976
- Problem High electrical energy consumption
(JD10,000) forming 20 of the plant operating
expenses. - Investigation
- Review the design of the available equipment to
ensure no over-sizing. - Deliver an energy audit to measure the power
performance of available equipment. - Determine the high electricity consuming
equipment/facilities and propose modifications.
24Findings and Solutions
- Air compressors and refrigeration system are the
major energy consuming facilities. - Monitored the performance of these equipment and
determined their power factors. - Set procedures for the operation of the equipment
away from the Maximum Demand Period (reduced
penalties). - Used low power ration equipment.
- Set a system for plant GHK and internal
management.
25Results
- Minor investment required (JD6,000)
- First three months bill JD6,800-JD7,900 (no
major change to plant productivity)
26Economic Value-Example
Best Management Practices for Pollution
Prevention in the Textile Industry EPA, 1996.
27Economic Value-Example (Cont.)
Process Description Bath Ration Water Use, gal/lb Change from Standard Water saving gal/lb (wool washing)
Standard 3-Step drop/fill 18 1.62 --- ---
Three Step drop/fill, Reuse bath 2 18 1.19 -26.5 (0.26534.1) 9.04
Three Step Reuse baths 2 and 3 18 0.75 -53.7 (0.53734.1) 18.31
28Economic Value-Example (Cont.)
Fabric Flow
Raw Water
Water Flow
Estimated Investment US50,000 Annual Estimated
Savings US95,000/yr (Production dependent)