Title: Mylor Yacht Harbour


1
Mylor Yacht Harbour
  • Tributyl Tin Contamination

2
Background
  • Mylor Yacht Harbour
  • Falmouth, Cornwall
  • Create an area of Hard Standing
  • Car Park
  • Boat Storage

3
Problem
  • Tributyl Tin (TBT) Contamination
  • 0.44-0.68 mg/kg
  • Limited Solubility
  • 4mg/l at 20C
  • Ongoing Risks to Aquatic Organisms
  • Crustaceans
  • Filter Water Through them

4
Solution
  • E-Clay Technology
  • Portland Cement
  • Cost
  • 80,000
  • Duration
  • 2 months

5
Technology
  • Lab Studies with E-Clays
  • Treatment Slurry
  • Portland Cement, 5
  • Modified Organoclay, 0.5
  • Treats 10m³ per Batch
  • Ex-situ
  • Treatment Zone

6
Process
  • Dredging
  • Treating
  • Envirotreat Process
  • 2,300m3
  • remediation target of 50 µg/l
  • 99 reduction
  • Replacing

7
Benefits
  • Material Reuse
  • No Stock Piling
  • Toxic Material Treatment
  • Cost Effective
  • Unit Cost 20/m²
  • No Ongoing Monitoring
  • Reduced Leachability

8
Limitations
  • Contaminated Material Still Onsite
  • Limits Future Development

9
Alternative Solution 1
  • Total Soil Replacement
  • Deposition in Landfill
  • Large Quantity of Replacement
  • Expensive
  • Inefficient

10
Alternative Solution 2
  • Thermal Desorption
  • Reduction to less than 1.0 mg/kg
  • Not overly affective against Heavy Metals
  • Stabilizing Agents
  • Reduce Leachability
  • Treated Soil Backfilled

11
TBTs
  • TBTs were banned in the late 1980s
  • Ban on all European Ships, 2003
  • Teqmar Antifoul developed as a substitute