Check out the bingo sign! - PowerPoint PPT Presentation

1 / 47
About This Presentation
Title:

Check out the bingo sign!

Description:

Check out the bingo sign! CAZENOVIA CR. _at_ STEPHENSON ST. BRIDGE – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 48
Provided by: ENSU150
Category:
Tags: bingo | check | nice | out | photos | sign

less

Transcript and Presenter's Notes

Title: Check out the bingo sign!


1
Check out the bingo sign!
CAZENOVIA CR. _at_ STEPHENSON ST. BRIDGE
2
REPLACEMENT OF ONE BANK OF A CONCRETE-LINED
CHANNEL CAZENOVIA CREEK _at_ STEPHENSON STREET
BRIDGE SPONSOR CITY OF BUFFALO,
NYCONSTRUCTED OCTOBER 2005 - MARCH 2006
3
CAZENOVIA CREEK _at_ STEPHENSON STREET BRIDGE
  • Urban Urban Urban!! Steep bank slopes-fenced off
    for public safely, concrete lined channel
  • Roads on top of both banks within feet of sloped
    bank of stream
  • Dense urban single-family dwellings
  • Floods fairly often due to flow, ice jams,
    backwater effects from the Buffalo River
  • City of Buffalo, NY project
  • Pool-riffle-pool stream, less than 1 slope

4
PRE-PROJECT PHOTOSby Lallman RambaliNYSDOT
REGION 9WINTER 2003
5
Ice on US side of Stephenson Street bridge.
  • Pix by Lallman Rambali 2003

6
From Stephenson St. bridge, looking US
  • Pix by Lallman Rambali 2003

7
PRE-PROJECT PHOTOSby Dave Derrick FEBRUARY
24, 2005
8
Looking across stream, left bank in background.
  • Pix by Derrick 2/24/2005

9
CONSTRUCTION PHOTOSby Jeff Fisk, Project
Engineer, OCTOBER 2005
10
Looking across _at_ left bank, US end of project.
  • Pix by Jeff Fisk - Oct. 2005

11
Positioning driving sheetpile. Note worker
  • Pix by Jeff Fisk - Oct. 2005

12
CONSTRUCTION PHOTOSby Dave Derrick NOVEMBER
4, 2005
13
Looking DS. Old sheetpile removed, new
installed.
  • Pix by Derrick 11/4/2005

14
Looking DS. Driving sheetpile toe. Project is
1,000 ft long.
  • Pix by Derrick 11/4/2005

15
CONSTRUCTION COMPLETEPhotos by Derrick MAY
18, 2006
16
Looking DS. Toe-sheetpile. Mid-bank-cut stone
with willows.
  • Pix by Derrick - 5/18/2006

17
Looking DS. Trees-fence-shrubs-riprap-stone-sheet
pile.
  • Pix by Derrick - 5/18/2006

18
Looking DS. Opposite bank typical concrete.
  • Pix by Derrick - 5/18/2006

19
Looking DS. Close-up of soil-choked riprap
mid-bank upper bank shrubs. Note engineered
soil-clay-gravel-organic mix for stability
plant growth of shrubs.
  • Pix by Derrick - 5/18/2006

20
Robust upper bank rooted stock shrubs .
  • Pix by Derrick - 5/18/2006

21
Gravel-clay-soil-organic mix planting medium.
  • Pix by Derrick - 5/18/2006

22
Looking DS. Shrubs and top-bank trees.
  • Pix by Derrick - 5/18/2006

23
5 MONTHS AFTER PROJECT COMPLETIONPhotos by
Derrick AUGUST 23, 2006
24
Mid Upper bank vegetation growing well
Trees
No protection, 2 rows of shrubs
Riprap with grasses
Square cut stone with willow dogwood whips
Sheetpile
  • Pix by Derrick - 8/23/2006

25
22 MONTHS AFTER PROJECT COMPLETIONFEB 3-4,
2008
26
Looking DS _at_ left bank. Water level has dropped,
ice has collapsed
  • Pix by George Cotroneo - 2/3/2008

27
WHAT A BIG DIFFERENCE ONE DAY MAKES Feb 5,
2008 (3/4 inch of rain warm temps10 ft high
stage ice out) ALSO WHICH BANK DO YOU
LIKE, LEFT OR RIGHT??
28
LEFT BANK Warm temps rain high water quick
ICE OUT. All veg still looking very very good.
  • Pix by Joe Kassler - 2/5/2008

29
3 YEARS 1 MONTH AFTER PROJECT
COMPLETIONPhotos by Derrick JUNE 12, 2009
30
Looking DS _at_ left bank. Veg looking good!!
3YRS 1 MONTH AFTER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-12-09
31
Looking DS _at_ left bank. All veg is robust!!
3YRS 1 MONTH AFTER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-12-09
32
Looking DS _at_ left bank. Nice species diversity
of plants.
3YRS 1 MONTH AFTER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-12-09
33
Looking DS _at_ left bank. Even toe veg is coming
on.
3YRS 1 MONTH AFTER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-12-09
34
Vines some veg growing amongst large toe stone
3YRS 1 MONTH AFTER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-12-09
35
Close up of robust mid upper bank veg.
3YRS 1 MONTH AFTER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-12-09
36
Top bank tall trees to left upper bank veg on
right.
3YRS 1 MONTH AFTER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-12-09
37
4.66 YEARSAFTER PROJECT COMPLETIONPhotos by
Derrick JUNE 16, 2010
38
4.66 years after completion. From bridge looking
DS _at_ the entire project. All planted material
showing robust growth
4.66 YRS LATER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-16-2010
39
4.66 years after completion. From the bridge
looking DS. Except for narrow band of stone at
toe, dense veg has covered the entire bank.
4.66 YRS LATER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-16-2010
40
4.66 years after completion. From the bridge
looking DS. Good diversity of plant species with
some volunteer plants (Cottonwood, Black Locust,
herbacious, some invasive Japanese Knotweed).
4.66 YRS LATER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-16-2010
41
4.66 years after completion. From bank looking
DS.
4.66 YRS LATER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-16-2010
42
4.66 years after completion. From the bank
looking DS. Willow is growing well in the riprap
section.
4.66 YRS LATER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-16-2010
43
4.66 years after completion. Looking at top bank
overbank
4.66 YRS LATER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-16-2010
44
4.66 years after completion. Looking at top bank.
4.66 YRS LATER-CAZENOVIA CR. _at_ STEVENSON
ST-DERRICK 6-16-2010
45
5 YEARSAFTER PROJECT COMPLETIONPhotos by
Chuck Godfrey Feb. 18, 2011
46
5 YEARS AFTER PROJECT COMPLETION. Its
back-looking DS _at_ ice pounding project, all
plants safe for now!!
5 YRS LATER-CAZ CR. _at_ STEVENSON ST-CHUCK
GODFREY 2-28-2011
47
Brothers separated at birth!!
Write a Comment
User Comments (0)
About PowerShow.com