Utility Extension Project
  • Water, Sewer Gas Extensions
    Franklin, CT

Lenard Engineering, Inc.
2
Project Summary
  • New Project limits include
  • Route 32, from Old Rt. 32 to Murphy Road
    (Segments 1 2)
  • Murphy Road from Route 32 to Route 87 (Segments
    3 4)
  • 10,400 feet of gravity sewer, 1,350 feet of sewer
    force main, one pump station
  • Sewer connection to NPU on Old Route 32
  • 9,200 feet of water main, including connection to
    NPU on New Park Ave.
  • Total Project Cost 14.030 million
  • USDA Grant / Loan will fund 9.215 million
    (Segments 1 2)
  • Additional State and Federal Grants applications
    underway for balance of project

Lenard Engineering, Inc.
3
(No Transcript)
4
Preliminary Design Results
  • Refined previous conceptual design layout and
    cost estimate
  • Created new base mapping using current aerial
    maps, DOT right-of-way maps, Town assessors maps,
    and topographic maps
  • Prepared layout plans for water, sewer and gas
    mains
  • Reduced number of costly sewer pumping stations
    from four to one (Murphy Road)
  • Conducted three days of test borings (40
    locations) to better quantify rock excavation
  • Broke project into four (4) segments See Map
  • Reduced contingencies from 30 to 20 based on
    updated design
  • Overall project cost reduced from 19.5 million
    to 14.0 million

Lenard Engineering, Inc.
5
(No Transcript)
6
(No Transcript)
7
Local Project Impacts
  • Franklin Hills Estates and Country Club, LLC
  • 18 hole golf course, clubhouse, 100 room lodge
    and parking structure approved
  • Private water main construction on Rt. 87,
    Murphy Road to serve their projects
  • Private sewer main construction from New Park
    Avenue cross-country to Route 32/ Avery Lane to
    serve their projects
  • These mains reduce the lengths of water and
    sewer mains required by the Town project
  • Estimated new tax revenues generated 2015-
    133,000
  • 2016 - 356,000
  • 2017 - 408,000
  • Town of Bozrah Sewer Project
  • Project moving slower than Franklin
  • Previous costly sewer main on Route 87 no longer
    needed
  • Present design allows their future connection
    to Segment 4 on Murphy Road

Lenard Engineering, Inc.
8
Project Costs
  • Construction Costs
  • Segment 1 - Rt. 32 south of Route 87 - 3.429
    million
  • Segment 2 - Rt. 32, from Rt. 87 to Murphy Rd -
    2.404 million
  • Segment 3 - Murphy Road East of railroad tracks
    - 1.642 million
  • Segment 4 - Murphy Road West of railroad tracks
    0.662 million
  • SUB-TOTAL CONSTRUCTION - 8.138 million
  • Other Project Costs
  • Contingencies (20 ) - 1.628 million
  • Design/ Construction Administration (20 ) -
    1.628 million
  • Construction Inflation (3.5 ) - 0.285 million
  • NPU Connection Fee (100,000 gpd) - 1.100
    million
  • Legal, Bond Council, Short Term Interest - 1.250
    million
  • SUB-TOTAL - OTHER PROJECT COSTS - 5.890 million
  • TOTAL PROJECT COST 14.030 MILLION

Lenard Engineering, Inc.
9
Typical Property Owner Costs
  • No benefit assessment charges are proposed for
    this project
  • Property owner responsible for water service and
    sewer lateral on their properties
  • Water - 3,000 est.
  • Sewer- 5,000 est.
  • Property owners will become NPU water customer,
    be billed directly by Norwich
  • Sewer bills will be paid to Town of Franklin
    WPCA, based on water meter readings
  • Typical Residence / Small Business- 200 gallons
    per day
  • Water Charge 585 / year
  • Sewer Charge 650/year
  • Total Charge 1,235/year

Lenard Engineering, Inc.
10
Proposed Project Schedule
  • May 20, 2015 Town Meeting on this project
  • May 27, 2015 Referendum Vote on this project
  • Assuming May 27, 2015 Referendum Passes
  • Apply for additional grant funding from US EDA
    (due date June 12, 2015)
  • Continue to pursue State, USDA future pooled
    funding
  • Design and Permit Entire Project (Segments 1- 4)
    June - December 2015
  • If no additional funding is available, construct
    water and sewer portions of Segments 1 2 with
    USDA funding (March - December 2016)
  • As additional grant funding is obtained,
    construct remaining portions of the project,
    Segments 3 4- Murphy Road east and west
    (through July 2017)

Lenard Engineering, Inc.
11
Lenard Engineering, Inc.
12
How Will Town Pay for this Project ?
  • USDA Grant- 2.110 million grant
  • USDA Loan- 7.105 million loan (2.75, 40 years)
  • Annual Principal and Interest Payment 296,000
    beginning in 2017
  • New Projected Tax Revenue from Franklin Hills
    Estates Approved Projects
  • 2015- 133,000
  • 2016- 368,000
  • 2017- 408,000
  • Note that future tax revenue from the Franklin
    Hill Estates approved project will pay for the
    debt service from the USDA loan.
  • NO ADDITIONAL BENEFIT ASSESSMENTS WILL BE
    REQUIRED TO FUND THIS PROJECT!

Lenard Engineering, Inc.
13
Benefits of Project
  • Public Health - Eliminates septic systems and
    private well water quality concerns
  • Economic Development - Water, Sewer and Gas
    Utilities will allow more complete development of
    Towns commercial and industrial zoned land
  • Taxes - Increases to Grand List will help keep
    taxes steady over time
  • Limited Areas for Future Tax Revenue Growth -
    See map of Protected Properties

Lenard Engineering, Inc.
14
Lenard Engineering, Inc.
15
Questions and Comments?
Lenard Engineering, Inc.
Write a Comment
User Comments (0)
About PowerShow.com