Results of the Seat/IFE Integration Standardization Group - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Results of the Seat/IFE Integration Standardization Group

Description:

Results of the Seat/IFE Integration Standardization Group By Standardization Team, Rob Hofmann, Team Captain Rolf Goedecke, Co-captain – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 8
Provided by: Sand4216
Category:

less

Transcript and Presenter's Notes

Title: Results of the Seat/IFE Integration Standardization Group


1
Results of theSeat/IFE Integration
Standardization Group
  • By Standardization Team,
  • Rob Hofmann, Team Captain
  • Rolf Goedecke, Co-captain

2
Standardization Team Members
  • Rob Hofmann, MAS Rolf Goedecke, Airbus
  • Stan Carr, Boeing Brad Hanson, US Airways
  • Tom Aliffi, Delta Air Lines Brad Shelton, Delta
    Air Lines
  • Winnie Lau, Cathay Pacific Rich Salter, ITRI/AAI
  • Steve Olauson, RCPS Randy Penley, BE Aerospace
  • Brain Gamberg, Coco Gerd Schroer, VDO
  • Andreas Oberberger, VDO Dan Martinec, Arinc
  • David Brown, MBM
  • Team members Airline, Seats, IFE, OEMs, Other

3
Standardization Solution 1
  • Continue to develop cabin standards
  • via Arinc 628 (CEI)
  • implement new IACC committee under Arinc
  • get more industry support (esp. seats airlines)
  • Target end of year for new IACC operational
  • Focal Dan Martinec and Rich Salter

4
New IACC committee
Arinc Board of Directors
AEEC
IACC
Others
The CEI subcommittee needs to move to report to
the new IACC (Intl Airlines Cabin Comm.)
CEI
5
Standardization Solution 2
  • Create a top level overview of Arinc 628 to
    provide to industry (Parts 1-8)
  • To educate industry of what standards exist
    point out future needs
  • And as a tool for airlines to gain support of
    IACC
  • Target Draft by March 30, Final provided June 30
    at Arinc CEI meeting
  • Focal Rob Hofmann Han Gim

6
Standardization Solution 3
  • Enforcement of mech. wiring installation
    requirements of FARs, OEM specs, Arinc
    guidelines
  • Target Ongoing, initiated by OEMs
  • Focal Airbus Boeing

7
Standardization Solution 4
  • Concentrate on standardization of invisible parts
  • e.g., Seat box, cables, brackets, shrouds, items
    not desired to be seen by pax
  • Target Immediately after this meeting via email
    request from seat suppliers.
  • Focal Dan M. (getting specs to seat suppliers)
  • Target Ongoing (see solution 1)
  • Focal CEI (via Arinc 628 doc.)
Write a Comment
User Comments (0)
About PowerShow.com