API WIWC TG-5 - PowerPoint PPT Presentation

About This Presentation
Title:

API WIWC TG-5

Description:

Title: CT Operations Training Author: Alexander Sas-Jaworsky II Last modified by: Alex Sas-Jaworsky Created Date: 5/13/2002 2:51:10 AM Document presentation format – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 16
Provided by: Alexande242
Category:

less

Transcript and Presenter's Notes

Title: API WIWC TG-5


1
API WIWC TG-5
  • Well Intervention Well Control
  • Task Group
  • Winter Conference Update
  • Alex Sas-Jaworsky P.E
  • Chairman

2
API WIWC TG-5
  • Technologies Addressed
  • Coiled Tubing
  • Snubbing/Hydraulic Workover
  • Wireline (Slickline and E-Line)

3
API WIWC TG-5
  • Standards Developed
  • Recommended Practice 16ST
  • Coiled Tubing Well Control Equipment Systems
  • First Edition March 2009

4
API WIWC TG-5
  • 2014 RP 16ST TG Membership
  • Operators (3)
  • CT Vendors (6)
  • Manufacturers (3)
  • Consultants (1)
  • Regulatory (1)

5
API WIWC TG-5
  • Current Activities
  • 5-Year Review of RP 16ST
  • Further Align RP 16ST Standards with
    Established SC16 Standards to Maintain
    Consistency Where Possible

6
API WIWC TG-5
  • RP 16ST Review Priority
  • Well Control Equipment Operating Systems (Pumps
    Accumulators)
  • Establish Basis for Maximum Ram Actuation Time
    (Response Time)
  • Align with Spec 16D (where possible)

7
API WIWC TG-5
  • RP 16ST Review Priority
  • Conducted Preliminary Testing of Hydraulic Power
    Fluids at Various Temperatures to Establish Basis
    for Maximum Ram Actuation Times February 6-7,
    2013 95VI ISO 46 AW August 27-28, 2013
    ISO 10 Syn.

8
API WIWC TG-5
9
API WIWC TG-5
  • RP 16ST Review Priority
  • January 8, 2014 TG Meeting
  • Discussed Test Results for CT Rams
  • Proposal for CT SBR is 10-Seconds
  • Proposal for all Other Rams in CT Stack is
    30-Seconds.

10
API WIWC TG-5
  • RP 16ST Review Priority
  • May 14, 2014 TG Meeting
  • Rewriting RP Sections to Require Emergency SBR
    for All CT Pressure Categories

11
API WIWC TG-5
  • RP 16ST Review Priority
  • May 14, 2014 TG Meeting
  • Rewriting RP Accumulator Design Sections to More
    Closely Align With API Spec 16D

12
API WIWC TG-5
  • RP 16ST Review Priority
  • Upon Final Ballot Resolution of API Spec 16C,
    Revise RP 16ST Sections Related to Well Control
    Choke and Kill Lines

13
API WIWC TG-5
  • RP 16ST Review Priority
  • Well Control Equipment Repair Remanufacture
    Issues (small rams)
  • Reference STD 16AR (if possible, or)
  • Establish Recommendations Within RP 16ST
    Consistent with STD 16 AR

14
API WIWC TG-5
  • RP 16ST Review Priority
  • Conducting Line-By-Line Review of Remainder of RP
    16ST to Correct Typos, Reconfirm Value of
    Standards and Clarify Performance Expectations

15
API WIWC TG-5
  • RP 16ST Review Priority
  • Request That Current Edition of API RP 16ST be
    Reaffirmed for Two Years to Allow TG to Complete
    Critical Revisions and Submit 2nd Ed. Letter
    Ballot in 2nd Quarter, 2016.
Write a Comment
User Comments (0)
About PowerShow.com