Transcript and Presenter's Notes

Title: Horizontal Drilling Permit Applications Lorenzo Garza


1
Horizontal Drilling Permit Applications
Lorenzo Garza
2
Presentation overview
  • Differences between horizontal and vertical wells
  • Learn how to determine if your in need of a SWR
    exception
  • Learn how to resolve these SWR 37 38 exceptions

Penetration Point
3
Vertical Well in Productive Zone
Drilling Permits and Online Filing - Advanced
Penetration Point
Penetration Point
4
Horizontal Well Productive Zone
Drilling Permits and Online Filing - Advanced
Penetration Point
Penetration Point
To be considered a horizontal well the
displacement of the well must be at least 100
feet.
5
Horizontal Well Productive Zone
Drilling Permits and Online Filing - Advanced
Horizontal Drainhole Containing the Productive
Portions of the Well Bore
6
Drilling Permits and Online Filing - Advanced
TERMS YOU SHOULD BE FAMILIAR WITH
  • Surface location
  • Penetration point
  • Terminus location

Statewide Rule that covers horizontal drilling is
SWR 3.86
7
Drilling Permits and Online Filing - Advanced
SWR 86 PLAT
8
Drilling Permits and Online Filing - Advanced
  • Where to find out more information concerning
    horizontal well

9
Drilling Permits and Online Filing - Advanced
  • Where to find out more information concerning
    horizontal well

10
Drilling Permits and Online Filing - Advanced
  • Where to find out more information concerning
    horizontal well

11
Drilling Permits and Online Filing - Advanced
  • Where to find out more information concerning
    special horizontal field rules.
  • What you can find
  • Information concerning dual lease line distances
  • Off lease penetration point information
  • As-drilled tolerance box rule
  • Acreage assignment based on length of lateral
  • Stacked lateral rules

12
Drilling Permits and Online Filing - Advanced
  • Where to find out more information concerning
    horizontal well

13
Drilling Permits and Online Filing - Advanced
  • Where to find out more information concerning
    horizontal well

14
Drilling Permits and Online Filing - Advanced
  • Where to find out more information concerning
    horizontal well

Located in Rule 2
15
Drilling Permits and Online Filing - Advanced
16
Drilling Permits and Online Filing - Advanced
  • PENETRATION POINTS
  • Defined as the point your well penetrates the top
    of the regulatory fields correlative interval as
    defined in Rule 1 of the field rules.

17
Drilling Permits and Online Filing - Advanced
STANDARD SWR 86 FIELD
18
Drilling Permits and Online Filing - Advanced
SWR 86 PLAT
19
Drilling Permits and Online Filing - Advanced
SPECIAL HORIZONTAL FIELD RULES
20
Drilling Permits and Online Filing - Advanced
  • OFF LEASE PENETRATION POINTS
  • If the well is in a standard SWR 86 field then
    the penetration point must be on lease or an
    exception to rule is needed.
  • If the well is in a field approved for special
    horizontal rules then application can be
    processed as long as proper notification to
    affected parties is done prior to the submission
    of the Drilling Permit application.
  • If you are proposing to drill a vertical pilot
    hole to log the formation you will need to follow
    the rules for off lease penetration and provide
    notice to affected parties prior to submission of
    the application.

21
Drilling Permits and Online Filing - Advanced
22
Drilling Permits and Online Filing - Advanced
SPECIAL HORIZONTAL FIELD RULES
23
Drilling Permits and Online Filing - Advanced
24
Drilling Permits and Online Filing - Advanced
  • Determining if you are a SWR 37 lease line or
    between well exception.
  • HORIZONTAL WELL
  • What is the distance to nearest lease line?
  • Look at the entire length of your wellbores
    productive portion
  • Use the shortest distance to a lease line from
    any point in the productive portion

25
Drilling Permits and Online Filing - Advanced
Out of compliance SWR exception needed
26
Drilling Permits and Online Filing - Advanced
Un-leased mineral interests
27
Drilling Permits and Online Filing - Advanced
330 halo around wellbore
28
Drilling Permits and Online Filing - Advanced
Multiple terminus locations can be applied for at
the same time
29
Drilling Permits and Online Filing - Advanced
30
Drilling Permits and Online Filing - Advanced
  • MAIN POINTS
  • SWR 3.86 MUST BE ADHERED TO UNLESS THERE ARE
    SPECIAL HORIZONTAL RULES FOR THE FIELD YOU ARE
    APPLYING FOR.
  • KNOW HOW TO DETERMINE DISTANCE TO NEAREST LEASE
    LINE AND WELL FOR THE TYPE OF FIELD RULES
    (STANDARD OR SPECIAL) YOU ARE WORKING UNDER.
  • ONCE YOUR WELL HAS PENETRATED THE FORMATION YOU
    CANNOT CROSS INTO A TRACT THAT IS NOT LEASED.
    THIS IS MINERAL TRESSPASS.

31