Cathedral - PowerPoint PPT Presentation

About This Presentation
Title:

Cathedral

Description:

... erected,in September the Roofing was finished and ... In 1911 the church flooring was covered with multivoloured ceramic tiles 4 years later the ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 12
Provided by: pmg71
Learn more at: http://pmg3-varna.org
Category:

less

Transcript and Presenter's Notes

Title: Cathedral


1
Cathedral
????????? "??????? ????? ??????"
2
My dear friends,this is my first night shot
posting and the result of my third attempt to
take it properly..-))I hope you will excuse the
quality-I had no tripod and used fir balance a
huge trash bin,but hope it was it worth to stand
the uncovinience,as the Varna Jawel(as I call it)
is a beauty and I was very eager to show it to
you,no matter my humble skills and not very high
quality of photographical equipment.
3
  • However,I hope very much you will enjoy it
    the way I offer it to you today,as it has a
    significant place in Varna history too. This is
    the sight of Varna Assumption Cathedral,Situated
    in the very core of the city,lit up for the
    night.
  • It was built in the First years after the
    liberation of the country.The honour to lay the
    main stone of the future temple fell to prince
    Alexander I Batenberg who arrived to Varna on 4th
    August 1880 and the official ceremony took place
    on 22nd August 1880.

4
  • The chosen name Uspenie Presvyatiya
    Bogoroditza(the Assumption) was commemorate the
    recently deceased all-Russian empress Maria
    Alexandrovna-a Bulgaria benefactress and aunt of
    the prince.No time was wasted and the building
    works started right away.It took 6 years for the
    temple to be completed.The project imitated the
    style of the Peterhoff temple in Petersburg.

5
  • The church was planned to reach the size of
    35x35 metres,with a three-nave basilica,the main
    altar dedicated to the Assumption,the northern
    one-to the faithful prince St.Alexander
    Nevsky,the southern-to St.Nicholas the
    Wonder-Worker.On 15th March 1884 the committee
    assigned the construction to the prominent
    church-builder Gencho Kanev from Tryavna.The
    following year the temple was already erected,in
    September the Roofing was finished and on 30th
    August 1886 the first solemn mass was celebrated
    there.

6
  • However,the design of its interior continued
    throughout the following years.The bishops stall
    was placed in 1897later on the iconostasis was
    also ready.The bell was supposed to weigh 1638
    kg,with an inscribed text trat readin honour of
    the Liberator.In 1901 the Russian czar Nicolay
    II presented 42 smalle and 3 bigger icons,and
    1904 other 8 icons were brought to the church to
    be placed at the middle and northern doorways.In
    1911 the church flooring was covered with
    multivoloured ceramic tiles 4 years later the
    balcony was ready.

7
  • In 1941-43 the bell-tower (38 m high) and the
    cupolas were reconstructed to their present
    form,the steam-heating room was built,the roofing
    structure replaced.The temple was icon-painted in
    the years following 1949the chandeliers were
    also installed at that time.

8
(No Transcript)
9
(No Transcript)
10
THE END
11
Created by
Ivanela ?II g class
Write a Comment
User Comments (0)
About PowerShow.com