Title: (%204%20years%20experience%20)
1( 4 years experience )
Joint CHAIN/GISELA/EPIKH Workshop, 10 December,
2010, Valparaiso, Chile
The scope of the event is to show both to the
scientific community and to the decision makers
the usefulness of e-Infrastructures and the
importance of their sustainability.
2Outline
- History
- Cluster structure (local, Grid, )
- Workflow jobs, data, problems
- Conclusions and Outlook
3History
4Cluster structure
Rackmount Dell PE 2950, Xeon 1.6GHz, 2GB RAM,
140GB SAS Tower AMD 1.6 GHz, 512MB, 120GB IDE
Intel Core2Duo, 4GB, 2TB RAID SATA
Local
Grid
PROOF
master
PBS client
gLite-UI
UI
PBS server PBS nodes
lcg-CE gLite-WN
slave
CE
WN 1..11
xrootd
SE
POOL 1..3
Data
SE-dCache
MON
GPU 1..2
CUDA
Resource Center (RC) SL4, x86_64, gLite 3.1,
dCache 1.9.5 (gold)
5Workflow jobs
- Local
- MPI, GPU, ATLAS offline, Minerva, tutorials
- Grid EELA
- prod.vo.eu-eela.eu (GAMOS etc.)
- oper.vo.eu-eela.eu (obsolete)
- Grid EGEE/WLCG
- ATLAS, NA61 (?)
- DTEAM, OPS
6Workflow experimental data
7LHC Data Grid Hierarchy
8Network bandwidth
9It works!
Grid CPU hours per country
10Grid accounting
11Conclusions and Outlook
- Lesson 2 network (bandwidth, firewall etc.)
- Upgrades hardware, software, network.
- Storage up to 100TB and more!
- New services (WNS, LB etc.) for NGI.
Cooperative!
12Cooperative work?
13Cooperative work!
14(No Transcript)