Defense Waste Processing Facility
  • 257 Actual Canisters Produced in FY05
  • 37 Waste Loading (averaged for FY05)
  • 1,995 Total Canisters Produced (as of the10/31/05
    start of an ongoing DWPF outage)
  • Sludge Batch 3 began feeding to DWPF in April
    2004 and is expected to last to March 2007
  • Sludge Batch 4 forecast ready date is January
    2007 and is expected to serve as feed to DWPF
    through March 2009

2
Glass Waste Storage Building 2 (as of 10/21/05)
3
Issues and Challenges
  • Availability of federal repository
  • Completion of NDAA Section 3116 process
  • Salt Processing
  • Tank Closure
  • Re-design of SWPF based on DOE decision to
    implement additional requirements
  • Reassessment of interim salt strategy