HYSPEC Instrument: Status and Performance - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

HYSPEC Instrument: Status and Performance

Description:

Title: PowerPoint Presentation Last modified by: Mark Hagen Created Date: 6/12/2000 8:31:39 AM Document presentation format: Letter Paper (8.5x11 in) – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 11
Provided by: bnlGov
Category:

less

Transcript and Presenter's Notes

Title: HYSPEC Instrument: Status and Performance


1
HYSPEC InstrumentStatus and Performance
M. Hagen Neutron Facilities Development Division,
SNS, Oak Ridge National Lab. W.J. Leonhardt
and A. Ruga Condensed Matter Physics Materials
Science, Brookhaven National Lab.
2
Instrument Performance by Phase
3
Overview
4
External building Share common foundationslab
with BL13 (FnPB)Year 1 Foundation slab
HYSPEC buildingYear 2 FnPB buildingHYSPEC
specificationsare done.FnPB specifications
arealmost done.AE bids in July/August.
5
(No Transcript)
6
(No Transcript)
7
Polarizing (Heusler) Ordered 33 crystals from
ILLFirst 11 in December 2008Second 11 in June
2009Final 11 in December 2009
Non-polarizing
8
(No Transcript)
9
IDT Executive Committee Meeting 2nd April 2007,
CNMS, ORNL Peter Allenspach (PSI), Rob McQueeney
(Ames/Iowa), Jim Rhyne (LANL),Steve Shapiro
(BNL), Igor Zaliznyak (BNL) SING Schedule Enginee
ring design Buildings Procurements Polarization
mirrors 3He
10
Summary
  • Design is continuing Completed primary
    beamline (choppers, guides, shielding) Current
    drum shield system Future sample stage,
    detector vessel, 3He polarization analyzer
  • Procurements CVI, BSI, T0 chopper, Heusler
    crystals, (AE
    drawings for building)
  • Installed CVI, BSI, 6-15m poured in place