Michigan Department of Transportation Pavement Demonstration Program

Description:

Pavement Demonstration Program ... within 20% between the two paving materials over a two year ... 13 in Pinconning Low-volume concrete design ... – PowerPoint PPT presentation

Number of Views:156
Avg rating:3.0/5.0
Slides: 29
Provided by: Eack
Category:

less

Transcript and Presenter's Notes

Title: Michigan Department of Transportation Pavement Demonstration Program


1
Michigan Department of TransportationPavement
Demonstration Program
  • Rep. Rick Olsons 2012 Best Practices Conference
    on Road and Bridge Maintenance
  • Curtis Bleech
  • Pavement Operations Engineer
  • August 16, 2012

2
Pavement Demonstration
  • LCCA Law
  • Legally Can Not Perform Demonstration Project
  • No Equivalent Pavement Design
  • No Performance Data
  • Development of Pavement Demonstration Law
  • Allows Demonstration Projects Without Performing
    LCCA

3
Pavement Demonstration Law
  • Allows four demo projects per year without having
    to go through life-cycle
  • to evaluate new construction methods,
    materials, or design
  • Each demonstration project shall include
    measurable goals and objectives for determining
    the success of that project
  • The department shall make a final report for
    each demonstration projectthat assesses the
    cost-effectiveness and performance

4
Pavement Demonstration Law
  • Criteria for selection
  • Designs intended to increase pavement life
    expectancy
  • Designs intended to improve performance,
    including
  • Friction
  • Surface stress
  • Noise reduction
  • Improved ride quality
  • Comparisons of performance of various types of
    pavement

5
Pavement Demonstration Law
  • Pavement costs for demo projects must balance
    within 20 between the two paving materials over
    a two year period
  • Director has to provide an annual report on
    demonstration projects to the State House and
    Senate Transportation Committees

6
Pavement Demonstration
  • Examples of Project Types
  • White-topping (concrete over HMA)
  • Thin un-bonded concrete overlay (4)
  • Low-volume concrete reconstruct (6)
  • Perpetual HMA pavement (40 year design)
  • Perpetual HMA pavement on rubblized concrete (40
    year design)

7
Demonstration Projects
8
Demonstration Projects
  • I-75 near West Branch
  • 6 unbonded concrete overlay on NB
  • Rubblize and HMA resurface on SB
  • Both projects constructed concurrently
  • Several test sections involving undoweled and
    doweled joints, 10 and 12 joint spacing, sealed
    and unsealed joints
  • Minor longitudinal cracking

9
Demonstration Projects
10
Demonstration Projects
11
Demonstration Projects
  • M-84 between Saginaw and Bay City
  • 40 year HMA perpetual pavement design on SB
    (existing roadbed) 6.5 HMA, 12 agg. base, 14
    sand subbase
  • Normal 20 year HMA design on NB (new roadbed)
  • 6.5 HMA, 6agg. base, 18 sand subbase
  • Perpetual pavement HMA polymerized
  • Very few distresses on SB

12
Demonstration Projects
13
Demonstration Projects
  • M-3 (Gratiot Ave.) in Detroit
  • Thin unbonded overlay (4)
  • Existing composite, HMA milled down and new 1
    separator layer placed
  • Four test sections two separator layers and
    sealed and unsealed joints
  • Joint spacing 5 to 6
  • Potential 15 year fix
  • Some panels have been replaced due to cracking

14
Demonstration Projects
15
Demonstration Projects
16
Demonstration Projects
17
Demonstration Projects
  • M-13 in Pinconning
  • Low-volume concrete design
  • Reconstruct with 6 of concrete, 6 of
    dense-graded agg. base, and 12 of sand subbase
  • 5.5 joint spacing in both directions
  • No dowel bars at transverse joints
  • Unsealed joints
  • 15 to 20 year expected life
  • Performing very well
  • New cracks at approach to structure at Pinconning
    River

18
Demonstration Projects
19
Demonstration Projects
  • I-96 WB in Detroit
  • 40 year perpetual pavement design
  • 14 HMA, 16 OGDC, 8 sand subbase, 12 lime
    stabilized subgrade
  • Normal 20 year JPCP design on EB
  • Not a side by side comparison
  • No distresses in the perpetual pavement

20
Demonstration Projects
  • M-99 in Springport
  • Low-volume concrete
  • Reconstruct with 6 of concrete, 6 of
    dense-graded agg. base, and 12 of sand subbase
  • 6 joint spacing in both directions
  • No dowel bars at transverse joints
  • Unsealed joints
  • 15 to 20 year expected life
  • Early age cracking (possibly late sawing)

21
Demonstration Projects
22
Demonstration Projects
  • I-75 NB in Cheboygan County
  • 40 year HMA perpetual pavement design on NB over
    rubblized concrete 8.0 HMA
  • NB also had concrete reconstruct and unbonded
    overlay
  • Unbonded overlay on SB the previous year
  • Not a side by side comparison

23
Demonstration Projects
  • M-1 (Woodward Ave.) in Detroit
  • Thin unbonded overlay (4)
  • Existing composite, HMA milled down and new 1
    separator layer placed
  • Joint spacing 5 to 6 and sealed

24
Results
  • Some observations at early ages
  • Sealing of joints appears beneficial to help
    prevent water infiltration
  • Perpetual HMA pavement showing less cracking than
    comparison section
  • For thin un-bonded concrete overlays, drainable
    HMA interlayer showing less cracking than dense
    graded interlayer
  • Low-volume concrete design has little cracking to
    date

25
Candidate Process
  • Can be just a portion of a larger project
  • Typically get buy-in from industry groups
  • Candidate project is submitted to Engineering
    Operations Committee with a workplan
  • Experimental feature
  • Potential benefits
  • Monitoring plan
  • Reports to be written

26
Candidate Process
  • If EOC approves, it becomes an official
    Demonstration Project
  • Candidate projects must be submitted before any
    life-cycle documents are submitted
  • Currently no extra funding for demonstration
    projects

27
Plan For Future Demos
  • Types of projects
  • White-topping (regular and ultra-thin)
  • Thin un-bonded overlay
  • Low-volume concrete reconstruction
  • Perpetual pavement on rubblized concrete
  • Long life concrete reconstruction
  • HMA over stabilized base
  • Others?

28
Questions?