Title: WEATHERIZATION ASSISTANCE PROGRAM PROCUREMENT TOOL KIT
1WEATHERIZATION ASSISTANCE PROGRAMPROCUREMENT
TOOL KIT
2TOOL KIT CONTENTS
- 12 Steps To Procurement
- Sample General Instructions
- Sample Specifications and Pricing Quotes
- Sample Evaluation Examples
- Fillable General Instructions
- Fillable Specifications and Pricing Quotes
- Fillable Evaluation Worksheets
3THE TWELVE STEP PROGRAM TO PROCUREMENT
- Step One Determine What You Will Be Purchasing
- Materials
- Services
- Materials and Services
- Small Purchase Procedures
- Large Purchase Procedures
4THE TWELVE STEP PROGRAM TO PROCUREMENT
- Step Two Establish the Timeframe for the
Purchase(s) - Secure Cost Quotations
- Develop Bid/Proposal/Quotation Package
- Advertise
- Receive and Evaluate
- Award
5THE TWELVE STEP PROGRAM TO PROCUREMENT
- Step Three Identify the Lead Individual to
Manage the Purchase(s) - Advertise
- Facilitate Bidders Conference
- Receive Bids/Proposals/Quotes
- Insure Adherence to Requirements
- Staff Evaluation Panel
- Award
6THE TWELVE STEP PROGRAM TO PROCUREMENT(cont)
- Step Four Prepare General Instructions
- Solicitation Purpose
- Oversight of Purchase
- Contact Information
- Agency Agreement
- Key Dates
- Requirements
- Bidders Conference
- Due Date and Location
- Required Forms
- Preferences
- Evaluation and Award
7THE TWELVE STEP PROGRAM TO PROCUREMENT (cont)
- Step Five Prepare Specification and Price Quote
Sheets - Specific Materials to be Purchased
- Services to be Purchased
- Standards for Services
- Timeframe for Delivery and/or
- Completion
- Required Forms
8THE TWELVE STEP PROGRAM TO PROCUREMENT (cont)
- Step Six Advertise the Solicitation
- Established Bidders List
- Newspaper
- Posting in Public Buildings
9THE TWELVE STEP PROGRAM TO PROCUREMENT (cont)
- Step Seven Conduct Bidders Conference
- Record Individuals in Attendance
- Answer Questions
- Record Minutes
10THE TWELVE STEP PROGRAM TO PROCUREMENT (cont)
- Step Eight Receive Quotations, Bids, Proposals
- Identified Agency Individual
- Date and Time Stamp
- Provide Offerors with Receipt
11THE TWELVE STEP PROGRAM TO PROCUREMENT (cont)
- Step Nine Evaluate Quotations
- Establish Evaluation Panel
- Staff Evaluation Panel
- Insure Accuracy of Evaluation Work Sheets
12THE TWELVE STEP PROGRAM TO PROCUREMENT (cont)
- Step Ten Select Contractor(s) and/or Vendor(s)
13THE TWELVE STEP PROGRAM TO PROCUREMENT (cont)
- Step Eleven Establish Solicitation File
- Solicitation Document
- Documentation of Advertisement
- Attendees and Minutes of Bidders Conference
- Bids/Proposals/Quotations Received
- Documentation the Requirements Satisfied
- Evaluation Panel Members
- Evaluation Work Papers
- Notice to Successful Vendor(s)/Contractor(s)
14THE TWELVE STEP PROGRAM TO PROCUREMENT (cont)
- Step Twelve Enter into Agreements
15THE TWELVE STEP PROGRAM TO PROCUREMENTS CHECKLIST
- Determine what you will be purchasing
- Establish timeframe for the purchase(s)
- Identify the lead individual within the
organization that will handle the purchase(s) - Prepare general instructions
- Prepare specifications and price quote sheets
- Advertise the solicitation
- Conduct bidders conference
- Receive quotations
- Evaluate quotations
- Select contractor(s)/vendor(s)
- Establish solicitation file
- Enter into Agreements with contractor(s)/vendor(s)
, as appropriate
16GENERAL INSTRUCTIONS SIX SECTIONS
- Introduction
- Requirements
- Agency Agreement
- Content and Format of Quotations, Bids, or
Proposals - Evaluation of Offers
- Contractor Application Form
17GENERAL INSTRUCTIONS SECTION 1 - INTRODUCTION
- Purpose of Solicitation
- Overview
- Objectives
- Oversight and Management
- Type of Agreement and Payment Schedule
- Procurement Schedule Key Dates
18GENERAL INSTRUCTIONSSECTION 2 REQUIREMENTS
- Inquiries
- Bidders Conference
- Date, Time and Place for Submission
- Submission Requirements
- Opening
- Minimum Qualifications
- Integrity
- Applicability
19GENERAL INSTRUCTIONS REQUIREMENTS (cont)
- Licenses
- Preferences
- Insurance
- Presentation
- Costs for Preparation of Quotations, Bids, and
Proposals - Modifications to Solicitation
- Independent Price Determination
- Evaluation and Award(s)
- Miscellaneous
20GENERAL INSTRUCTIONS SECTION 3 - AGENCY
AGREEMENT
- A copy of the Agency Agreement or Contract that
the vendor and/or contractor signs will be
included in instructions
21GENERAL INSTRUCTIONS SECTION 4 - CONTENT
SPECIFICATIONS AND PRICING FORMAT
- Specific Specifications location or page
designation for location - Format. If a specific pricing format is to be
followed.
22GENERAL INSTRUCTIONS SECTION 5 - EVALUATION
- States conditions under which bids, quotations,
or proposals will be evaluated
23GENERAL INSTRUCTIONS SECTION 6 - CONTRACTOR
APPLICATION
- Basic Information
- EIN or SSN
- Contractors License , if applicable
- Preference Enterprise
- Experience
- Training
- References
- Jobs Completed
- Number of Employees
- Other Information
- Certifications
24DEBARMENT ANDSUSPENSIONCERTIFICATION
25SAMPLE SPECIFICATION AND PRICING QUOTE
- Building Shell Measures
- Insulation
- Pressure Diagnostic Guided-Directed Air Sealing
- Windows and Doors
- Solar Screens
- Reflective Roof Coating
26SAMPLE SPECIFICATION AND PRICING QUOTE(cont)
- Mechanical Measures
- HVAC Repairs and Replacements
- Electric Base-Load Measures
- Lighting and Refrigerators
27SAMPLE SPECIFICATION AND PRICING QUOTE(cont)
- Health and Safety Measures
- Smoke and Carbon Monoxide Alarms
- Water Heaters
28SAMPLE SPECIFICATION AND PRICING QUOTE(cont)
- Other
- Materials Only Bulk Purchase
- Materials Only Individual House Purchase
- Whole House Weatherization
29INSULATION SPECIFICATIONS AND PRICING
QUOTEINSULATION SAMPLE
- All materials used in provision of services must
meet or exceed 10 CFR 440 Appendix A Standards
for Weatherization Services - Estimate to insulate in accordance with federal
energy efficiency standards and installation
methods. Insulation will be evenly installed with
no voids, gaps, misalignments, or compression
issues. Precautions must be taken when
insulating around or on electrical boxes and/or
heat producing fixtures. Proper shielding, if
necessary, shall be installed by insulation
contractor in order to properly insulate all
areas. For attic insulation, all wall cavities
and drop downs that are exposed to attic shall be
capped and insulated over or filled with
insulation to assure insulation is in direct
contact with air barrier. In these cases a change
order would have to be approved. Insulation
amount shall also be identified at nearest or
easiest attic access point. After completion, all
jobs will be inspected by (Insert Agency Name)
auditor to assure quality installation. Complete
installation must include all labor, and
materials to perform services. Contractor MUST
provide details on each invoice listing actual
square foot installed.
30INSULATION SPECIFICATIONS AND PRICING QUOTE
(cont)
- Contractor is responsible for leaving the job
site clean and hauling away job debris. - Project commencement and completion must be
accomplished within _________ working days of
notice to proceed. - Contractor must include permit fees (if
applicable), sales taxes, labor and materials
to complete project.
31INSULATIONSPECIFICATIONSAND PRICING QUOTE
(cont)
32INSULATIONSPECIFICATIONSAND PRICING
QUOTE(cont)
33INSULATIONSPECIFICATIONSAND PRICING
QUOTE(cont)
34Windows and Doors Sample
35Solar Sun Screen Sample
36Materials on House by House Basis
37Materials and Labor on House by House Basis
38SAMPLES OF EVALUATION WORKSHEETS
- Baseline Information
- Sample House
- Criteria for Evaluation Other Than Cost
- Profile of Potential Offerors
- Multiple Vendors/Contractors
39Sample House
- 1,500 sq foot single story home built in
1975, site built stick frame, gable roof, wood
siding ranch style over crawl space with 16 on
center 10 joist with no insulation, existing
attic insulation of R-18, 3 ½ wall cavity no
insulation, forced air natural gas furnace at 60
efficiency, 175 l/f of duct supply and return air
with duct leakage of 200 cfm50, 40 gallon gas hot
water heater, and single glazed wood horizontal
slider windows.
40Criteria for Evaluation other than Cost
41SAMPLES OF EVALUATION WORKSHEETS(cont)
- Insulation Cost Only and Factors In Addition to
Cost - Pressure Diagnostic Guided-Directed Air Sealing
Cost Only - Windows and Doors Cost Only
- Solar Sun Screens Cost Only
42SAMPLES OF EVALUATION WORKSHEETS(cont)
- Reflective Roof Coating Cost Only
- HVAC Cost Only
- Electric Base Load Measures Cost Only
- Hot Water Heater Replacement Cost Only
43SAMPLES OF EVALUATION WORKSHEETS(cont)
- Bulk Materials Cost Only
- Materials Only Individual House Cost Only
- Whole House Weatherization Factors In Addition
to Cost
44INSULATION QUOTATION EVALUATION WORKSHEET