Research Update Automated Bolting and Meshing Project - C17018 Update Bolt Manipulator Work in the fifth quarter has seen the assembly and testing of a bolt ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 7
Provided by: pkr71
Category:

less

Transcript and Presenter's Notes

Title: Research Update


1
Research Update Automated Bolting and Meshing
Project - C17018
2
Update
Bolt Manipulator
  • Work in the fifth quarter has seen the assembly
    and testing of a bolt manipulator that will be
    used to automatically assemble and place drilling
    consumables into each of the two sets of vertical
    drilling rigs and two rib drilling rigs on the
    continuous miner. Laboratory testing has
    demonstrated and confirmed the manipulators
    ability to complete a set of tasks within a
    satisfactory timeframe. Bolt Manipulator.wmv

3
Bolt Manipulator
4
Roof Mesh Manipulator
Update
  • In conjunction with bolt manipulation, a system
    which automatically handles steel roof mesh on a
    continuous miner platform is currently being
    fabricated and assembled. Laboratory trials and
    testing will be carried out on a mock base frame
    in combination with the bolt manipulator complete
    with working drilling rigs. A demonstration to
    industry peers is expected by mid October.
  • In addition to the above activities, design
    continues on the rib mesh manipulation. The
    system will be also mounted onboard the
    continuous miner and expected to complete the
    overall roof support automation objectives for
    this project. Roof Manipulator.wmv

Roof mesh manipulator
5
Roof Mesh Manipulator